E-25 - Act respecting expropriation

Full text
246. For the purpose of applying sections 166 to 170 of this Act to construction work carried out for the project to extend the Montréal metro’s blue line from the Saint-Michel station to the Anjou station, the first paragraph of section 167 must be read without reference to “if the upper limit of the exterior concrete wall of the tunnel is at least 15 metres underground”.
2023, c. 27, s. 246.
In force: 2023-12-29
246. For the purpose of applying sections 166 to 170 of this Act to construction work carried out for the project to extend the Montréal metro’s blue line from the Saint-Michel station to the Anjou station, the first paragraph of section 167 must be read without reference to “if the upper limit of the exterior concrete wall of the tunnel is at least 15 metres underground”.
2023, c. 27, s. 246.