13. The construction of any water withdrawal facility must meet the following conditions:(1) the facility must be constructed with new materials;
(2) work relating to the construction of the facility must be performed in a way that minimizes lakeshore and riverbank erosion and the clearing of vegetation, limits work in littoral zones and the flow of sediment to lakes and watercourses, and prevents any water contamination and deterioration of the environment.