The daily report must contain all the elements applicable to the declared day including, in particular,(1) the reconditioning authorization number;
(2) the elevation of the reference level and its identification;
(3) a description, in chronological order, of the work carried out and the time required for carrying out each step;
(4) the name of the enterprises carrying out the reconditioning;
(5) a summary of the meteorological conditions;
(6) the result of the pressure and leak tests, including the duration and the initial and final test pressures;
(7) the result of any other test carried out;
(8) the working condition of the blowout prevention system;
(9) the well logs carried out;
(10) the type of packers installed and the installation depths;
(11) the volume, composition and concentration of the reconditioning fluids;
(12) the volume and composition of the gas used, released, incinerated or burnt at the flare;
(13) the operational problems encountered and the corrective measures taken or planned;
(14) the indication of any event that disrupted the progress of the work;
(15) the indication of any temporary interruption of the reconditioning work and the procedure followed to secure the well; and
(16) any other information or document deemed necessary by the Minister.