173. The authorization holder must ensure that(1) each completion interval is isolated from any other permeable or porous interval intersected by the well, except in the case of a commingled production;
(2) any packer is installed as close as possible to the upper level of the completion interval;
(3) no fracturing is induced to the formation during the work; and
(4) the indicators and alarms associated with the monitoring equipment are installed on the service rig to alert onsite personnel.