S-3.1.01, r. 1 - Dam Safety Regulation

Full text
33. As soon as possible after the preparation or amendment of an impounded water management plan, the dam owner shall send the plan as drawn up or amended or a summary of the plan to the local municipality within whose territory the dam is located. If the dam is located in unorganized territory, the plan or summary shall be sent to the competent regional authority or to the Minister of Public Security, as provided in section 8 of the Civil Protection Act (chapter S-2.3).
The management plan summary must include the particulars listed in subparagraphs 2 to 5 and 8 of the third paragraph of section 30 and a summary of the descriptions referred to in subparagraphs 9 and 10 of the same paragraph.
O.C. 300-2002, s. 33; O.C. 989-2023, s. 22.
33. As soon as possible after the preparation or amendment of an impounded water management plan, the dam owner shall send a summary of the plan as drawn up or amended to the local municipality within whose territory the dam is located. If the dam is located in unorganized territory, the plan summary shall be sent to the competent regional authority or to the Minister of Public Security, as provided in section 8 of the Civil Protection Act (chapter S-2.3).
The management plan summary must include the particulars listed in subparagraphs 2 to 5 and 8 of the second paragraph of section 30 and a summary of the descriptions referred to in subparagraphs 9 and 10 of the same provision.
O.C. 300-2002, s. 33.