66. Total haulage: However, in the case where it is impossible to build an absorption system because of the standards of sections 55 and 62, a hauled sewage system may, despite sections 54 and 60 to 64, be constituted only of a holding tank of a minimum total capacity of 4.8 m3 built in conformity with sections 56, 58 and 59.
R.R.Q., 1981, c. Q-2, r. 8, s. 66.