8. Any person who installs, in a residential building, a boiler, furnace or water heater powered in whole or in part by oil, or a boiler, furnace or water heater powered in whole or in part by fossil fuel for the purpose of replacing appliances powered in whole or in part by oil, must, within 30 working days after the installation, send electronically to the Minister a declaration containing(1) their name, address and telephone number;
(2) if applicable, the number of the licence issued to them under the Building Act (chapter B-1.1); (3) in respect of each appliance installed,(a) the name, address and telephone number of the owner of the building where the appliance is located;
(b) the address of the building where the appliance is located;
(c) the date of installation;
(d) the type, brand and model; and
(e) the date of manufacture or serial number; and
(4) a description of the procedure followed when removing the tank that supplied fuel to the appliance that was replaced, if applicable.