32. A well drilling licensee shall conduct a pressure test on the formation before drilling at more than 60 m below any casing other than the conductor casing, except in the case of an open hole completion already specified in the drilling program required under section 15.
O.C. 1539-88, s. 32; O.C. 1381-2009, s. 20.