46. The installation must be equipped with a hot and cold water supply under pressure and in a quantity sufficient for the operations performed therein as well as for cleaning the room; waste water must flow into the main sewer or into an adequate septic tank.
R.R.Q., 1981, c. P-35, r. 1, s. 46.