82. When constructing or improving a road, constructing a power line, laying out a piling, lopping or sawing area, setting up a forest camp or opening or enlarging a sand pit, a holder of a management permit shall harvest the trees having a diameter equal to or greater than the diameter specified in the forest management permit or in an authorization, as the case may be.