Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
78. The maximum flow coming out of the territory drained to the storm water management system at the end of the work during the passage of erosion control rain must not exceed double the average flow.
O.C. 871-2020, s. 78.
In force: 2020-12-31
78. The maximum flow coming out of the territory drained to the storm water management system at the end of the work during the passage of erosion control rain must not exceed double the average flow.
O.C. 871-2020, s. 78.