Q-2, r. 6 - Groundwater Catchment Regulation

Full text
19. A person who drills a tube well must carry out a flow rate test for not less than 30 minutes, during which the flow rate and the water level before pumping and at the end of pumping must be measured. The test must verify if the flow rate meets the daily peak requirements of the residence, where applicable.
O.C. 696-2002, s. 19.