Q-2, r. 18 - Regulation respecting the burial of contaminated soils

Full text
32. At least twice a year, in the spring and fall, the operator of a contaminated soil burial site must take grab samples of the surface water collection system. The samples must be analysed for the parameters and substances identified in the leachates analysed as provided in section 30.
O.C. 843-2001, s. 32.