L-6, r. 12.1 - Lottery Scheme Rules

Français
Texte complet
55. A supplier must
1°  provide adequate training to organizations to use the electronic scheme;
2°  store the scheme securely and protect access to them at all times;
3°  resolve any technical difficulties that occur during the drawing and affect its integrity;
4°  monitor the scheme and intervene during any unusual or suspicious activity;
5°  monitor and detect errors in the scheme and related components; and
6°  inform the board of any incident that might affect the safety or integrity of the scheme or drawing, and of the measures taken to correct it.
D. 1475-2022, s. 55.
In force: 2022-09-01
55. A supplier must
1°  provide adequate training to organizations to use the electronic scheme;
2°  store the scheme securely and protect access to them at all times;
3°  resolve any technical difficulties that occur during the drawing and affect its integrity;
4°  monitor the scheme and intervene during any unusual or suspicious activity;
5°  monitor and detect errors in the scheme and related components; and
6°  inform the board of any incident that might affect the safety or integrity of the scheme or drawing, and of the measures taken to correct it.
D. 1475-2022, s. 55.