S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Français
Texte complet
286. The authorization holder must draw up a daily report of the work and keep it on the activity site.
The daily report must contain all the elements that are applicable to the declared day including, in particular,
1°  the number of the permanent closure authorization;
2°  the name of the drilling installation;
3°  the number of persons on board the drilling installation;
4°  a description, in chronological order, of the work carried out and the time required for carrying out each step;
5°  the petroleum or water traces detected;
6°  the type of pump used and its capacity;
7°  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
8°  the well logs carried out;
9°  the results of the pressure and leak tests;
10°  the operating condition of the blowout prevention system;
11°  the operational problems encountered and the corrective measures taken or planned;
12°  the composition, concentration and a detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
13°  the volume and composition of the gas used, released, incinerated or burned at the flare;
14°  the indication of any event that disrupted the progress of the work;
15°  the abnormal meteorological conditions that caused a work delay, in particular, due to
a)  visibility;
b)  temperature variation;
c)  wind speed or direction;
d)  the height, period and direction of the waves and swells;
e)  the size, distance and direction of ice;
f)  icing; and
g)  rolling, pitch and vertical motion of the vessel or platform; and
16°  any other information or document deemed necessary by the Minister.
D. 1251-2018, s. 286.
In force: 2018-09-20
286. The authorization holder must draw up a daily report of the work and keep it on the activity site.
The daily report must contain all the elements that are applicable to the declared day including, in particular,
1°  the number of the permanent closure authorization;
2°  the name of the drilling installation;
3°  the number of persons on board the drilling installation;
4°  a description, in chronological order, of the work carried out and the time required for carrying out each step;
5°  the petroleum or water traces detected;
6°  the type of pump used and its capacity;
7°  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
8°  the well logs carried out;
9°  the results of the pressure and leak tests;
10°  the operating condition of the blowout prevention system;
11°  the operational problems encountered and the corrective measures taken or planned;
12°  the composition, concentration and a detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
13°  the volume and composition of the gas used, released, incinerated or burned at the flare;
14°  the indication of any event that disrupted the progress of the work;
15°  the abnormal meteorological conditions that caused a work delay, in particular, due to
a)  visibility;
b)  temperature variation;
c)  wind speed or direction;
d)  the height, period and direction of the waves and swells;
e)  the size, distance and direction of ice;
f)  icing; and
g)  rolling, pitch and vertical motion of the vessel or platform; and
16°  any other information or document deemed necessary by the Minister.
D. 1251-2018, s. 286.