Q-2, r. 37 - Land Protection and Rehabilitation Regulation

Français
Texte complet
2.5. The declaration of compliance includes the following information and is accompanied by a work schedule:
1°  the contact information of the person filing it;
2°  the location and description of the contaminated land;
3°  the nature and concentration of contaminants present in the land and the quantity of soils to be excavated;
4°  if the declarant is not the person carrying out the excavation work, the contact information of that person;
5°  the address of the site where
a)  contaminated soils will be shipped;
b)  material from the dismantling of the installations present on the land, where applicable, will be shipped; and
c)  recovered water will be discharged or, where applicable, transported.
D. 797-2019, s. 2.