90.In addition to the requirements of ISO 14064-3, the verification of a project plan or project report must be carried out in accordance with the conditions and methods set out in this Chapter and in compliance with the provisions of the Professional Code (chapter C-26).
All verifications referred to in sections 93 to 99 must be carried out in accordance with the Forest Engineers Act (chapter I-10).
2022-11-17A.M. 2022-11-17, s. 90; 2025-0003A.M. 2025-0003, s. 21.