39. (Revoked).
D. 871-2020, s. 39; D. 1596-2021, s. 50.
39. Work aimed at constructing an artificial basin, pond or lake must not include an intake channel or a discharge point in another wetland or body or water. Work undertaken to backfill such an area may not be carried out until after the area has been dewatered.
D. 871-2020, s. 39.
In force: 2020-12-31
39. Work aimed at constructing an artificial basin, pond or lake must not include an intake channel or a discharge point in another wetland or body or water. Work undertaken to backfill such an area may not be carried out until after the area has been dewatered.