B-1.1, r. 2 - Construction Code

Français
Texte complet
10.32. The devices in the filtration and overflow system and the floor drains in the deck must be connected to the drainage system in accordance with Chapter III of this Code.
O.C. 115-2013, s. 1; D. 811-2025, s. 1.
10.32. The guardrails must
a)  not have any opening allowing a spherical object of over 100 mm in diameter to pass through;
b)  have a height of at least
i.  1,070 mm in the part of a springboard, diving platform or accessory that is not over water and that is 1 m high or more;
ii.  920 mm measured vertically to the top of the guardrail from a line drawn through the outside edges of the stair nosings;
iii.  1,070 mm around the landings.
O.C. 115-2013, s. 1.