A-18.1, r. 0.01 - Regulation respecting the sustainable development of forests in the domain of the State

Français
Texte complet
37. The settling pond must remain operational and be drained when the water height above the sediments is less than 30 cm over at least 50% of the settling pond’s area.
D. 473-2017, s. 37.
In force: 2018-04-01
37. The settling pond must remain operational and be drained when the water height above the sediments is less than 30 cm over at least 50% of the settling pond’s area.
D. 473-2017, s. 37.