85.1.1. The electric power carrier must, not later than six months after the Régie approves the electric power distributor’s supply plan, make available online and file with the Régie a 15-year electric power transmission system development plan prepared in compliance with the integrated energy resource management plan referred to in section 14.2 of the Act respecting the Ministère de l’Économie, de l’Innovation et de l’Énergie (chapter M-14.1) and taking into account the supply plan.
For the purposes of the preparation of the development plan, the electric power carrier must hold a public consultation. It shall make available online, with the development plan, a report on the observations and comments collected from the public during that public consultation.
The Minister may require an electric power carrier to indicate certain information in its development plan and to hold the public consultation in a certain manner.
2025, c. 24, s. 73.