R-6.01 - Act respecting the Régie de l’énergie

Full text
71.2. As of 1 January 2014, the electric power supply to meet the needs of Québec markets may not be deferred; the supply deferred before that date must be purchased before 28 February 2027 by Hydro-Québec as electric power distributor.
2015, c. 8, s. 17.