Home
Contact us
Site map
Québec.ca
FAQ
Français
Advanced search
Consolidated Statutes and Regulations
Consolidated Statutes
Consolidated Regulations
Annual Statutes and Regulations
Annual Statutes
Annual Regulations
Additional information
Québec Official Publisher
What’s new?
Information note
Policy of the Minister of Justice
Laws: Amendments
Laws: Provisions not in force
Laws: Provisions brought into force
Annual Statutes: PDF versions since 1996
Regulations: Amendments
Annual Regulations: PDF versions since 1996
Court Decisions
S-2.1, r. 4
- Safety Code for the construction industry
Table of contents
Enabling statute
1
Alphanumeric
Title
S-2.1
Act respecting occupational health and safety
Occurrences
0
Full text
Updated to 1 May 2024
This document has official status.
chapter
S-2.1, r. 4
Safety Code for the construction industry
OCCUPATIONAL HEALTH AND SAFETY — CONSTRUCTION — SAFETY CODE
Act respecting occupational health and safety
(chapter S-2.1, s. 223)
.
S-2.1
09
September
01
1
2012
DIVISION
I
DEFINITIONS
1.1
.
In this Code, unless otherwise indicated,
(
1
)
“
blasting accessory
”
means any explosive substance used in firing explosives;
(
1.1
)
“
CSA
”
means the Canadian Standards Association;
(
1.2
)
“
asbestos
”
means the fibrous form of mineral silicates belonging to rock-forming minerals of the serpentine group, that is, chrysotile, and the amphibole group, that is, actinolite, amosite, anthophyllite, crocidolite, tremolite or any mixture containing one or more of those minerals;
(
1.3
)
“
backup area
”
means a marked out space reserved for backup maneuvers of self-propelled vehicles;
(
2
)
“
hoisting apparatus
”
means a crane, overhead travelling crane, gantry crane, monorail, platform or fork-lift truck, winch, hoist, derrick, jib crane, gin, auxiliary crane, aerial basket, lifting platform and table, levelling apparatus, truck lifting panel, lifting jack and screw jack;
(
3
)
“
ASTM
”
means the American Society for Testing and Materials;
(
3.1
)
“
impulse noise
”
means a noise of short duration (generally of less than one second), peaking at a high level and characterized by a sharp increase and rapid decrease in sound level. The parameter used to measure an impulse noise is the C-weighted peak sound pressure level;
(
4
)
(paragraph revoked);
(
5
)
(paragraph revoked);
(
6
)
(paragraph revoked);
(
7
)
“
bolting
”
means a method for staying partition-walls by means of bolts or other similar devices anchored in the surrounding rock;
(
7.0.0
)
“
calculator
”
means a calculation tool that can be used to evaluate the daily noise exposure level (L
EX,8h
or L
ex,8h
) for the purpose of reducing the duration of workers’ daily exposure to noise;
(
7.0
)
“
CAN/CSA
”
means the Canadian Standards Association;
(
7.1
)
“
life line
”
means a synthetic fibre rope, a steel wire rope or a strap attached to an anchorage system and used to guide a rope grab;
(
8
)
“
high risk construction site
”
means
(
a
)
an excavation site of 6 m or more in depth;
(
b
)
a trench site, within the meaning of paragraph 34 of this section, 50 m or more in length;
(
c
)
a site where water or sewer works are carried out over a length of 50 m or more;
(
d
)
an underground work site;
(
e
)
where work is carried out underwater or in a hyperbaric environment;
(
f
)
a demolition site;
(
g
)
the site of a building, a structure or part of a structure 15 m or more in height;
(
h
)
a site where electrical transmission lines or their supporting structures are constructed or repaired;
(
i
)
a site where work is carried out 3 m or less from an electrical line of over 750 V;
(
j
)
a site where work is carried out above or near water;
(
k
)
dredging works;
(
l
)
a site where work in an electrical powerhouse or in an electrical transformer station is carried out;
(
m
)
a site where work is carried out in a closed area;
(
n
)
a site where explosives are used and handled;
(
o
)
where high-risk work is carried out within the meaning of paragraph 3 of section 3.23.2 of this Code;
(
8.1
)
“
major construction site
”
means a site where not fewer than 500 workers are employed simultaneously;
(
9
)
“
underground work site
”
means a construction site where works related to the excavation of tunnels and shafts are performed;
(
10
)
“
rated load
”
means the maximum load established by the manufacturer;
(
11
)
“
non-combustible construction
”
means a construction whose structural members, including floors and joints, are made of non-combustible materials;
(
12
)
(paragraph revoked);
(
12.0
)
“
lanyard
”
means a rope or strap fastened at one end to a safety harness and at the other end to an anchorage system or other component of a fall arrest connecting device;
(
12.1
)
“
digging
”
means any hole dug in the ground, including an excavation or a trench;
(
13
)
“
depot
”
means a building, construction or receptacle in which explosives are stored;
(
13.1
)
(paragraph revoked);
(
13.2
)
“
dBA
”
means an A-weighted decibel measurement - the weighting reduces the significance of extreme frequencies, in particular low frequencies below 200 Hz, and increases the significance of frequencies around 2,500 Hz. A-weighting must be used for all measurements to evaluate L
EX,8h
or L
ex,8h
;
(
13.3
)
“
dBC
”
means a C-weighted decibel measurement - the weighting reduces the significance of frequencies at or below 31 Hz and increases the significance of frequencies at or above 8,000 Hz. C-weighting must be used for all measurements to evaluate peak sound pressure level;
(
14
)
“
scaling
”
has the meaning assigned by paragraph 31;
(
14.1
)
“
pump jack scaffold
”
means a mast-climbing work platform that moves between two masts with the help of jacks;
(
14.2
)
“
mast-climbing work platform
”
means scaffolding constituted of a work platform that moves up and down between two or several masts with the help of a hoisting system and equipped with an anchoring system;
(
14.3
)
“
winch scaffolding
”
means a mast-climbing work platform whose masts are linked by braces or counter braces supporting a work platform that moves with the help of a hoisting device constituted of winches, pulleys and cables;
(
15
)
“
scaffold shoring
”
means an assembly of tubular scaffolding frames used for the shoring of concrete formwork;
(
15.01
)
“
motorized scaffolding
”
means a mast-climbing work platform constituted of a hoisting system made up of an electric, pneumatic or hydraulic motor or a natural gas or gasoline engine;
(
15.1
)
“
suspended scaffolding
”
means a platform suspended by one or more cables fixed to an anchoring point and moved vertically by means of a manual or motorized winch;
(
16
)
(paragraph revoked);
(
17
)
“
electrical power company
”
means a person, firm, company, cooperative society or municipality operating an electric energy transportation or distribution network;
(
17.1
)
“
confined space
”
means a space which is not designed to be occupied by a human being, in particular a tank, silo, vat, caisson, shoring pile, stack or manhole;
(
17.2
)
“
non-destructive examination
”
means a radiographic, ultrasonic, magnetic particle or liquid penetrant examination carried out and interpreted by an equipment operator for non-destructive testing certified level 2 by the Natural Resources Canada National Non-Destructive Testing Certification Body under CAN/CGSB-48.9712 Standard, Non-Destructive Testing - Qualification and Certification of Personnel;
(
18
)
“
excavation
”
means a piece of land dug out to a depth of at least 1.2 m where the width of the base exceeds the depth;
(
18.1
)
“
explosives
”
means any substance fabricated, manufactured or used to produce an explosion or a detonation, such as gunpowder, blasting powder, dynamite, an explosive in solution, aqueous gelatin, a blasting agent or a blasting accessory;
(
19
)
(paragraph revoked);
(
20
)
“
manufacturer
”
means the maker or his agent or where manufacture is done on the site, the employer;
(
21
)
“
safety factor
”
means the ratio of the ultimate load to the working load;
(
21.1
)
“
respirable asbestos fibre
”
means asbestos fibre having a ratio of length to diameter of more than 3:1; only fibres longer than 5 μm must be taken into account for measurement purposes;
(
21.2
)
“
high-efficiency filter
”
means a filter capable of filtering particles of 0.3 µm in size at an efficiency rate of at least 99.97%;
(
22
)
“
face
”
means the most advanced work point in a given direction in an underground excavation at a given level;
(
23
)
(paragraph revoked);
(
23.0
)
“
free fall distance
”
means the vertical distance measured from the beginning of a fall, from the harness D-ring to which the fall arrest connecting device is attached, to the point where the fall arrest system begins to apply force to stop the fall;
(
23.1
)
“
ISO
”
means the International Organization for Standardization;
(
24
)
“
jumbo
”
means a hammer-carrying head designed for drilling at the face without having to repeatedly disassemble drilling machines;
(
24.0
)
“
fall arrest connecting device
”
means all equipment, such as a lanyard, energy absorber, snap hook, connector, life line or rope grab, used to secure a safety harness to an anchorage system;
(
24.1
)
(paragraph revoked);
(
24.2
)
“
friable material
”
means material that can be crumbled, pulverized or powdered by hand pressure when dry or that is crumbled, pulverized or powdered;
(
25
)
“
non-combustible material
”
means material that complies with CAN4-S114, Standard Method of Test for Determination of Non-Combustibility in Building Materials, applicable at the time of manufacture of the equipment;
(
25.01
)
“
dike
”
means a sandbag barricade, an earth mound or the equivalent located less than 50 cm from the depot and whose height is at least equal to the depot;
(
25.1
)
“
protective wall
”
means a partition made of plywood at least 9 mm thick or made of another rigid material of an equivalent or greater resistance, that is at least 1.8 m high and that is installed at not more than 100 mm above the ground;
(
25.2
)
“
NF EN
”
means the European standard, the French version of which (NF) is published in France by the Association française de normalisation;
(
26
)
“
NFPA
”
means the National Fire Protection Association;
(
26.1
)
“
daily noise exposure level
”
means the equivalent continuous sound pressure level (dBA) for an 8-hour working day. It results from measurements that include all the types of noise present, including impulse noises;
(
26.2
)
“
equivalent continuous sound pressure level (dBA)
”
means the A-weighted continuous sound pressure level measured over a given period of time. It is identical to the sound pressure level of a constant noise having the same total A-weighted sound energy over the same period of time. It results from measurements that include all the types of noise present, including impulse noises. In the formulas used to calculate daily noise exposure level, it corresponds to L
p,A,eqTe
or L
eq,t
, which is the A-weighted equivalent continuous sound pressure level for the duration of the working day in hours (T
e
or T
w
);
(
26.3
)
“
certified organization
”
means an organization certified by the Canadian Welding Bureau in accordance with the specifications of CSA Standard W178.1, Certification of Welding Inspection Organizations;
(
27
)
“
two-blocking
”
means a situation where the hook block, the hoisting cable counterweight or other accessories attached to the hoisting cable come into contact with the tip of the boom or with the tip of the jib;
(
28
)
“
blasting mat
”
means a covering used to offer protection against stones or other objects that may be projected as a result of firing explosives;
(
28.1
)
“
load-bearing part
”
means a part which bears or supports the loads inherent to the use of equipment;
(
29
)
“
low velocity explosive actuated tool
”
means any tool designed so that when it is used with the maximum explosive charge permitted by the manufacturer’s specifications, it imparts to the fastener a speed of not more than 91.4 m per second and transmits to it kinetic energy of not more than 33 joules measured at a distance between 1.99 to 2.01 m from the mouth of the tool;
(
29.1
)
“
asbestos dust
”
means airborne asbestos particles or deposited asbestos particles liable to become airborne in the work area;
(
29.2
)
“
peak sound pressure level
”
means the instantaneous peak sound pressure level measured in C-weighted decibels;
(
30
)
“
shaft
”
means a passage dug underground whose longitudinal axis makes an angle greater than 20º with the horizontal;
(
31
)
“
scaling
”
means an action provoking the fall of rocks which tend to become separated from a partition wall or a vault;
(
31.01
)
“
SAE
”
means the Society of Automotive Engineers;
(
31.1
)
“
boatswain’s chair
”
means a seat designed for a worker, supported by slings or by a structure and suspended from a cable fixed to an anchoring point;
(
32
)
“
hazard signs
”
means a yellow, orange or red rigid strip, such as a trestle, or flexible strip, at least 70 mm wide and installed, according to the configuration of the land or of the structure, at a height varying between 0.7 m and 1.2 m;
(
33
)
(paragraph revoked);
(
33.1
)
“
flushing toilet
”
means a toilet having the following features
(
a
)
the bowl has a hatch or a siphon which separates it physically and visually from the drain pipe or the processing tank;
(
b
)
waste is purged from the bowl toward the sewer system or into the processing tank by means of a device causing a flow of water or chemicals;
(
33.2
)
“
chemical toilet
”
means a toilet without a bowl in which waste falls directly into a tank containing a chemical product to process the waste;
(
34
)
“
trench
”
means a piece of land dug to a depth of at least 1.2 m where the width of the base is equal or less than the depth. The width of the base is measured between the excavated walls or between an excavated wall and a structure;
(
34.0.1
)
“
work above or near water
”
means work carried out above or less than 2 m from a body of water or watercourse that is either more than 1.2 m deep and allows the use of a boat, or with a water flow of more than 0.51 m/s sufficient to carry a person;
(
34.1
)
“
blasthole
”
means a boring hole intended to be loaded with explosives;
(
34.2
)
“
misfire
”
means a blasthole loaded with explosives which did not fire;
(
35
)
“
tunnel
”
means an underground passage constructed without removing the material forming the vault and whose longitudinal axis makes an angle of 20º or less in relation to the horizontal;
(
36
)
“
ULC
”
means the Underwriters’ Laboratories of Canada;
(
37
)
“
loading area
”
means space that includes the place where workers load the drill holes, drill holes loaded or being loaded and any space occupied by the material and equipment necessary for the loading;
(
38
)
“
blasting area
”
means a place or space that presents a projection or blast hazard to a person or where a hazard exists because of the effects of the blasting.
R.R.Q., 1981, c. S-2.1, r. 6, s. 1.1
;
Decision 83-11-17, s. 1
;
O.C. 1959-86, s. 1
;
O.C. 53-90, s. 1
;
O.C. 54-90, s. 1
;
O.C. 995-91, s. 1
;
O.C. 807-92, s. 1
;
O.C. 329-94, s. 1
;
O.C. 1413-98, s. 1
;
O.C. 35-2001, s. 1
;
O.C. 119-2008, s. 1
;
O.C. 425-2010, s. 4
;
O.C. 393-2011, s. 1
;
O.C. 476-2013, s. 4
;
O.C. 606-2014, s. 1
;
O.C. 57-2015, s. 1
;
O.C. 428-2015, s. 1
;
O.C. 513-2015, s. 1
;
O.C. 1078-2015, s. 1
;
483-2021
O.C. 483-2021
,
s.
1
1
;
646-2022
O.C. 646-2022
,
s.
1
1
;
781-2021
O.C. 781-2021
,
s.
1
1
1
;
I.N. 2023-07-01
.
DIVISION
II
GENERAL PROVISIONS
§
2.1
. —
Scope
2.1.1
.
This Code applies to any work carried out on a construction site within the meaning of the Act respecting occupational health and safety (chapter S-2.1), except for facilities provided to workers by the employer for administrative, lodging, eating or recreational purposes, to which this Code applies only where a formal provision exists to that effect.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.1.1
;
Decision 83-11-17, s. 2
;
O.C. 393-2011, s. 2
.
2.1.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.1.2
;
O.C. 1959-86, s. 2
.
§
2.2
. —
Responsibility and powers of inspectors
R.R.Q., 1981, c. S-2.1, r. 6, sec. II, ss. 2.2
;
O.C. 329-94, s. 2
;
O.C. 119-2008, s. 2
.
2.2.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.2.1
;
O.C. 1959-86, s. 2
.
2.2.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.2.2
;
O.C. 1959-86, s. 2
.
2.2.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.2.3
;
O.C. 1959-86, s. 2
.
2.2.4
.
(Revoked).
Decision 83-11-17, s. 3
;
S.Q. 2021, c. 27, s. 267
.
2.2.5
.
(Revoked).
Decision 83-11-17, s. 3
;
O.C. 329-94, s. 3
.
2.2.6
.
To ascertain the soundness of a construction or installation, the inspector may require an attestation to that effect signed and sealed by an engineer or an architect.
O.C. 119-2008, s. 2
.
§
2.3
. —
Equivalences
2.3.1
.
In the application of this Code, the nature, dimensions and arrangement of materials may differ from the rules established as long as the strength of materials and their use ensure as much safety as the prescribed rule.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.3.1
.
2.3.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.3.2
;
O.C. 1959-86, s. 2
.
§
2.4
. —
General obligations
R.R.Q., 1981, c. S-2.1, r. 6
;
O.C. 1959-86, s. 3
.
2.4.1
.
(
1
)
The principal contractor must notify the Commission des normes, de l’équité, de la santé et de la sécurité du travail in writing of the opening of a construction site at least 10 days before activities at the site begin.
The principal contractor must also notify the Commission in writing of the closing of a construction site at least 10 days before the work at the site is expected to end, except where the expected duration of the site is 1 month or less, in which case the Commission must be notified at least 10 days before activities at the site begin.
This subsection does not apply to major construction sites.
(
1.1
)
The prescribed notice must state the following:
(
a
)
the identification number assigned to the principal contractor by the Commission;
(
b
)
the name and address of the principal contractor;
(
c
)
the name and address of the owner if different from the principal contractor, and those of the architects, consulting engineers, superintendents and employers at the site;
(
d
)
the municipal address of the site, its cadastral lot number and its location in relation to the nearest public road;
(
e
)
the type of construction site;
(
f
)
whether the planned construction site is a high risk construction site;
(
g
)
the opening date of the construction site;
(
h
)
the expected duration of the construction site;
(
i
)
the anticipated number of workers;
(
j
)
whether the expected duration of the construction site is 1 month or less, the expected closing date or the date when the work is expected to be completed;
(
k
)
in the case of asbestos removal work or demolition work involving asbestos, the methods and procedures used as well as an attestation to the existence of a training and information program that complies with section 3.23.7.
(
1.2
)
For emergency repairs to waterworks, a sewer, an electrical transmission or distribution line or gas pipeline, the Commission must be informed in writing, by telex, telegram or messenger, of the particulars prescribed in subsection 1.1 as soon as possible, where such work involves 10 or more workers.
No notice is required where such work involves fewer than 10 workers.
(
1.3
)
For demolition work ordered by the public fire prevention service in the interests of public safety, the Commission must be informed in writing, by telex, telegram or messenger, of the particulars prescribed in subsection 1.1 at least 6 hours before the work begins.
(
2
)
Before work mentioned hereunder begins, the employer shall send to the Commission all plans including the installation and disassembling procedures signed and sealed by an engineer of the manufacturer, respecting:
(
a
)
the shoring of an excavation or trench 6 m or deeper;
(
b
)
the shoring of concrete formwork;
(
c
)
(paragraph revoked);
(
d
)
any wood scaffolding 9 m or more in height;
(
e
)
any metal scaffolding 18 m or more in height;
(
f
)
any outrigger scaffolding or suspended outrigger scaffolding extending out more than 2.4 m from the finished face of a building;
(
g
)
any temporary runway or platform designed to support workers and that is part of the forms;
(
h
)
any platform, bucket or basket attached to a hoisting device for the transport of persons;
(
i
)
any scaffolding used or installed on a vehicle or any equipment which may be moved;
(
j
)
any anchoring device used for the installation of prefabricated concrete slabs or prefabricated buildings;
(
k
)
any spreader bar used for the installation of prefabricated concrete slabs or prefabricated buildings;
(
l
)
any suspended scaffolding or boatswain’s chair;
(
m
)
any mast-climbing work platform that must be anchored, except in the case of a pump jack scaffold.
(
3
)
Before installing or putting up tower cranes, hoists or job-site elevators, the employer shall send to the Commission the installation plans signed and sealed by an engineer. These plans shall also include the disassembling procedure.
(
4
)
The copies of the compliance certificate signed by an engineer shall be sent to the Commission before the work begins.
(
5
)
A certified copy of the plans mentioned in subsections 2 and 3, or of the certificates mentioned in subsection 4 shall be available at all times on the construction site.
(
6
)
The employer shall:
(
a
)
(paragraph revoked);
(
b
)
ensure the good operation of safety devices and fire prevention apparatus;
(
c
)
(paragraph revoked);
(
d
)
ensure that any area of great depth has an easy means of evacuation and a ventilation system, where there is a possibility of gas, vapours or other dangerous substances or contaminants accumulating.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.4.1
;
Decision, 83-11-17, s. 4
;
O.C. 1959-86, s. 4
;
O.C. 54-90, s. 2
;
O.C. 807-92, s. 2
;
O.C. 119-2008, s. 3
;
O.C. 1005-2015, s. 1
.
2.4.2
.
The employer shall ensure that:
(
a
)
all necessary steps are taken to ensure public safety and the safety of workers;
(
b
)
any worker on a construction site wears at all times clothing completely covering his torso and back;
(
c
)
(paragraph revoked);
(
d
)
workers do not involve themselves in games or competitions while at work;
(
e
)
(paragraph revoked);
(
f
)
any worker knows:
i
.
this Code;
ii
.
any operation ensuring the good running order of apparatus and machinery for which he is responsible;
iii
.
the emergency measures to observe in case of fire, explosion, or other accidents;
(
g
)
any worker is informed of the inherent dangers in his work;
(
h
)
(paragraph revoked);
(
i
)
management and control staff working mainly and usually on a construction site and workers working on a construction site who, on 18 July 2019, are not holders of a certificate issued by the Commission or by a body recognized by the Commission and have successfully completed the course on health and general safety on construction sites.
However, before 8 June 2023, a natural person who, to obtain a contractor’s licence or to qualify a partnership or legal person for a licence, has passed the examination on construction site safety management skills required by the Regulation respecting the professional qualification of contractors and owner-builders (
chapter B-1.1, r. 9
) or who is exempted therefrom by that regulation or by a regulation under section 182 of the Building Act (
chapter B-1.1
), shall be exempted from successfully completing the course on health and general safety on construction sites;
(
j
)
on an outlying construction site, all the required accommodations are provided for the inspector on the duration of this inspection work;
(
k
)
the apparatus, equipment or tools used on a construction site conform to this Code.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.4.2
;
Decision, 83-11-17, s. 5
;
O.C. 21-85, s. 1
;
O.C. 1959-86, s. 5
;
O.C. 329-94, s. 4
;
S.Q. 1996, c. 74, s. 54
;
O.C. 1413-98, s. 2
;
S.Q. 2018, c. 19, s. 19
;
640-2019
O.C. 640-2019
,
s.
1
;
820-2023
O.C. 820-2023
,
s.
1
1
.
2.4.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.4.3
;
O.C. 1959-86, s. 6
.
2.4.4
.
On a construction site, traffic control, use of public ways, temporary electrical installation, housekeeping of sites, toilets and their accessories, public safety, access to the site, protection against fire, permanent ramps and guardrails, temporary heating, transportation and rescue on water and all other general safety measures are the responsibility of the principal contractor.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.4.4
;
O.C. 1959-86, s. 7
;
O.C. 428-2015, s. 2
;
O.C. 513-2015, s. 2
.
§
2.5
. —
(Revoked)
R.R.Q., 1981, c. S-2.1, r. 6, Sd. 2.5
;
S.Q. 2021, c. 27, s. 267
.
2.5.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.5.1
;
S.Q. 2021, c. 27
S.Q. 2021, c. 27
,
s.
267
.
2.5.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.5.2
;
S.Q. 2021, c. 27
S.Q. 2021, c. 27
,
s.
267
.
2.5.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.5.3
;
O.C. 1959-86, s. 8
;
S.Q. 2021, c. 27
S.Q. 2021, c. 27
,
s.
267
.
2.5.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.5.4
;
O.C. 1959-86, s. 9
;
O.C. 606-2014, s. 2
;
S.Q. 2021, c. 27
S.Q. 2021, c. 27
,
s.
267
.
§
2.6
. —
(Revoked)
R.R.Q., 1981, c. S-2.1, r. 6
;
O.C. 1959-86, s. 10
.
2.6.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.6.1
;
O.C. 1959-86, s. 10
.
2.6.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.6.2
;
O.C. 1959-86, s. 10
.
§
2.7
. —
Public safety
2.7.1
.
Protective measure:
A construction site shall be separated from any place to which the public has access by
(
a
)
a covered passage if the works are carried out on more than one floor and if the sidewalk or the public way is less than 2 m from the site or from the projection of the latter at the level of the sidewalk or the public way; or
(
b
)
protective wall if the sidewalk or the public ways is 2 m or more away and should there be any danger to the pedestrians.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.7.1
;
O.C. 1413-98, s. 3
;
O.C. 35-2001, s. 2
.
2.7.2
.
Characteristics of covered passage:
The covered passage shall:
(
a
)
have a clear height of at least 2.1 m;
(
b
)
have a clear width of at least 1.5 m or equal to the width of the sidewalk, whichever is less;
(
c
)
be so designed and built as to support safely any load which may be reasonably applied to it. However, the passage shall be able to support a load at least 2,400 N/m
2
applied on the roof;
(
d
)
have a weatherproof roof sloped towards the site;
(
e
)
be totally enclosed on the site side and present a smooth surface on the inside of the passage;
(
f
)
have a guardrail of 1,070 mm in height on the street side, when the passage is supported on posts on this side; and
(
g
)
be sufficiently lighted when the street is lighted.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.7.2
;
O.C. 35-2001, s. 3
.
2.7.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.7.3
;
O.C. 1413-98, s. 4
;
O.C. 35-2001, s. 4
.
§
2.8
. —
Traffic control on a construction site
2.8.1
.
General responsibilities of the principal contractor:
Traffic of self-propelled vehicles must be controlled in order to protect any person on a site. To that end, the principal contractor must plan the traffic of those vehicles so as to restrict backup maneuvers and set up new safety measures to protect any person circulating on the site. The principal contractor must also give prior information of the safety measures prescribed to any person who must circulate on the site.
The principal contractor is responsible for ensuring that signs, including maximum speed indicators, are set up. The principal contractor must mark off traffic lanes, backup areas and work areas, as the case may be. The principal contractor is also responsible for ensuring that dust is kept down on all roads.
Where it is foreseen that activities on the construction site will occupy at least 10 construction workers simultaneously at a particular stage of the work, the principal contractor must, before work begins, develop a traffic plan that complies with the requirements of section 2.8.2.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.8.1
;
O.C. 329-94, s. 5
;
O.C. 1078-2015, s. 2
.
2.8.2
.
Traffic plan:
A traffic plan must indicate the safety measures taken to restrict backup maneuvers and those set up to protect persons circulating on a site. It must also determine the bidirectional telecommunications procedures or the code of hand signals related to backup maneuvers.
It must also contain a diagram indicating
(
1
)
the location and size of all traffic lanes;
(
2
)
the location of backup areas, if any;
(
3
)
traffic signs;
(
4
)
allowed maximum speeds;
(
5
)
the positioning of a site signal person or flag person for road users.
The plan must be available at all times on the work site. The information it contains must be updated in the event of any change, in particular as regards the location of the backup areas.
O.C. 1078-2015, s. 3
.
2.8.3
.
Training of site signal persons:
Site signal persons direct operators of self-propelled vehicles, namely during backup maneuvers. Site signal persons must undergo training, given by an instructor, that deals with the following elements:
(
1
)
the risks associated with the circulation of persons and self-propelled vehicles on a site;
(
2
)
the traffic rules and safety instructions on a site, including those provided for in the traffic plan, the marking of traffic zones and the instructions necessary to perform their task;
(
3
)
work equipment appropriate for the signal person’s duties such as high-visibility safety apparel and bidirectional means of telecommunications;
(
4
)
the signal person’s role and responsibilities;
(
5
)
the positioning of site signal persons and the blind spots of self-propelled vehicles;
(
6
)
the means of communication and the code of hand signals related to backup maneuvers.
O.C. 1078-2015, s. 3
.
2.8.4
.
Site signal persons:
Where site signal persons perform their duties, they must meet the following conditions:
(
1
)
wear fluorescent yellow-green high-visibility safety apparel of Class 2 or 3 and of Level 2 that complies with CSA Standard Z96, High-Visibility Safety Apparel;
(
2
)
use one of the means of communication provided for in the traffic plan and that was taught to them during training;
(
3
)
remain visible to operators of self-propelled vehicles directed by them and stay clear of the trajectory of those vehicles.
O.C. 1078-2015, s. 3
.
2.8.5
.
Backup maneuver:
Where it is necessary for a self-propelled vehicle referred to in subsection 2 of section 3.10.12 to perform a backup maneuver in a zone where persons are present or circulating and where that backup maneuver may endanger their safety, the maneuver must be performed in a backup area where no person may walk or with a site signal person who must direct the operator throughout the maneuver.
Where a backup maneuver is directed by a signal person, the signal person must use a bidirectional means of telecommunications to guide the operator. Despite the foregoing, where the vehicle backs up over a distance of less than 10 m, the signal person may use the code of hand signals indicated in the traffic plan, as the case may be.
O.C. 1078-2015, s. 3
.
§
2.9
. —
Fall protection
R.R.Q., 1981, c. S-2.1, r. 6, sec. II, ss. 2.9
;
O.C. 329-94, s. 6
;
O.C. 35-2001, s. 5
.
2.9.1
.
Safety measures:
Workers shall be protected against falls in the following cases:
(
1
)
if they are at risk of falling more than 3 m from the place where he is working;
(
2
)
if they are at risk of falling:
(
a
)
into a dangerous liquid or substance;
(
b
)
on a moving component;
(
c
)
on equipment or material that constitute a danger;
(
d
)
from a height of 1.2 m or more where they use a wheelbarrow or a vehicle.
In such cases and subject to section 2.9.2, one or several of the following measures shall be taken by the employer to ensure the safety of workers:
(
1
)
change the work position of workers so that they can work on the ground or on another surface from which they are not at risk of falling;
(
2
)
install guard-rails or a system which, by limiting the movements of workers, prevent them from being at risk of falling;
(
3
)
use common protective devices and equipment, such as safety nets;
(
4
)
ensure that workers wear safety harnesses secured to an anchorage system by a fall arrest connecting device, the whole in accordance with sections 2.10.12 and 2.10.15 when they are working. When workers cannot position themselves without the help of their fall arrest connecting device, ensure that they also use a means of positioning, such as a plank on brackets, a positioning tether or strap, a suspension cable or a platform;
(
5
)
use another means that ensures equivalent safety for workers.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.9.1
;
O.C. 329-94, s. 6
;
O.C. 35-2001, s. 5
;
O.C. 606-2014, s. 3
.
2.9.2
.
Installation of guard-rails:
Guard-rails must be placed on open sides of a floor, roof, platform, ramp, or scaffoldings or stairs around an excavation or any area from which workers may fall:
(
1
)
into a dangerous liquid or substance;
(
2
)
a vertical distance of 1.2 m or more where he uses a wheelbarrow or another vehicle; or
(
3
)
a height greater than 3 m in other cases.
Despite the foregoing, such a guard-rail may be removed during work if it is a nuisance. In such a case, workers must wear a safety harness secured to an anchorage system by a fall arrest connecting device, the whole in accordance with sections 2.10.12 and 2.10.15. The work area must then be delimited in particular by a continuous barrier or trestles of a minimum height of 0.7 m, located at a distance varying between 0.9 m and 1.2 m from the place where workers are at risk of falling, or by a warning line complying with the requirements of section 2.9.4.1, so as to prevent access thereto by persons not working therein.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.9.2
;
O.C. 995-91, s. 2
;
O.C. 35-2001, s. 5
;
O.C. 606-2014, s. 4
.
2.9.3
.
Safety net:
Where a safety net is installed, it must
(
1
)
be installed so as to allow a free fall of not more than 6 m;
(
2
)
have a sufficiently large area to intercept a person who has fallen;
(
3
)
be capable of supporting a mass of 115 kg falling from a maximum height of 6 m and with a safety factor of 3;
(
4
)
be sufficiently flexible to form a pocket and retain any person who has fallen;
(
5
)
be weather resistant;
(
6
)
be free of all foreign matter;
(
7
)
have openings of about 150 mm × 150 mm;
(
8
)
be installed in such a way that, when used, the person who falls therein will not hit an obstacle under or above the net or be hit by an object.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.9.3
;
O.C. 995-91, s. 2
;
O.C. 35-2001, s. 5
.
2.9.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.9.4
;
O.C. 329-94, s. 6
.
2.9.4.0
.
Despite section 2.9.2, a warning line may be installed, during bridging or roofing work, on surfaces with a slope equal to or less than 15 ° (3/12), in order to replace the use of a guard-rail and delimit a work area.
In such a case, another recognized means of protection against falls, such as a safety harness secured to an anchorage system by a fall arrest connecting device, the whole in accordance with sections 2.10.12 and 2.10.15, must be used outside the area delimited by the warning line.
O.C. 606-2014, s. 5
.
2.9.4.1
.
Warning line:
A warning line must be
(
1
)
continuous and installed on all sides of the work area that it delimits;
(
2
)
placed at a distance of 2 m or more from any place where a worker may fall from a height;
(
3
)
made of a rigid strip, a cable or a chain able to withstand a tractive force of at least 2.22 kN;
(
4
)
equipped with flags made of high-visibility materials and placed at intervals of not more than 2 m;
(
5
)
capable of withstanding a load of 100 N applied horizontally at the line’s highest point or vertically at its midpoint between 2 stanchions;
(
6
)
completed at each access point, storage area or hoisting area by a path formed by 2 parallel lines. However, when the path to a point of access to a work area is located at a distance of more than 5 m from it, the warning line does not have to be continued beyond that distance. In places where the access path starts at a roof edge, a guard-rail must be installed on the side of the roof, in compliance with section 2.9.2, so as to cover the first 3 metres on either side of the access path’s starting point; and
(
7
)
installed so that the line is
(
a
)
located between 0.7 m above the work surface at the line’s lowest point and 1.2 m above that surface at its highest point; and
(
b
)
supported by stanchions placed at intervals of not more than 2.5 m;
(
c
)
attached to each stanchion so that pushing on the line between 2 stanchions does not reduce the height of the line between adjacent stanchions by an equivalent amount.
O.C. 606-2014, s. 5
.
§
2.10
. —
Personal protective equipment
2.10.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.1
;
O.C. 1959-86, s. 11
.
2.10.2
.
In areas where there is danger of contact with moving parts:
(
a
)
clothes shall fit well and have no loose parts;
(
b
)
necklaces, bracelets or rings shall not be worn, except for medical bracelets which shall remain fastened to the wrist; and
(
c
)
long hair shall be tucked under a bonnet in the hat.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.2
.
2.10.3
.
Protection of head:
Any person on a construction site shall wear a safety hat designed and manufactured in accordance with CAN/CSA Standard Z94.1, Industrial protective headwear — Performance, selection, care, and use, applicable at the time of manufacturing.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.3
;
890-2020
O.C. 890-2020
,
s.
1
1
.
2.10.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.4
;
O.C. 329-94, s. 7
.
2.10.5
.
Protection of eyes and face:
Every worker must wear protective equipment that complies with the latest version of CAN/CSA Standard Z94.3 Eye and Face Protectors, within 24 months following its last update, when the worker’s eyes or face are exposed to
(
a
)
moving particles;
(
b
)
hazardous substances;
(
c
)
intense light or heat radiation;
(
d
)
molten metal;
(
e
)
(paragraph revoked);
(
f
)
other risks of the same kind.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.5
;
O.C, 995-91, s. 3
;
O.C. 329-94, s. 8
;
O.C. 393-2011, s. 3
.
2.10.6
.
Foot protection:
Subject to section 2.1.1, every person on a construction site must wear class 1 protective footwear that complies with CAN/CSA Standard Z-195 Protective Footwear.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.6
;
O.C. 995-91, s. 4
;
O.C. 393-2011, s. 4
.
2.10.7.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.1
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.2
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.3
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.4
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.5
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.5
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.6
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.6
;
O.C. 329-94, s. 11
;
O.C. 393-2011, s. 5
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.7
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.7
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.8
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.8
;
O.C. 393-2011, s. 6
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.7.9
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.7.9
;
O.C. 393-2011, s. 7
;
781-2021
O.C. 781-2021
,
s.
3
1
.
2.10.8
.
Protection of respiratory passages:
The contaminants in the air of a work environment shall be eliminated at their emission point so that their concentration is reduced to a level lower than or equal to the permissible values indicated in Schedule I to the Regulation respecting occupational health and safety (
chapter S-2.1, r. 13
).
The employer must provide a respirator in compliance with Division VI of the Regulation respecting occupational health and safety in any situation where the values referred to in the first paragraph cannot be complied with.
During periods of work on equipment referred to in section 5 of the Regulation respecting occupational health and safety, or during temporary inspection or maintenance work or work of the same nature performed sporadically on another type of equipment or facility, an employer may provide such a device without the obligation to take other measures to eliminate or reduce contaminants.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.8
;
O.C. 885-2001, s. 366
;
48-2022
O.C. 48-2022
,
s.
1
1
1
.
2.10.9
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.9
;
O.C. 1960-86, s. 1
;
O.C. 329-94, s. 12
;
O.C. 885-2001, s. 367
;
48-2022
O.C. 48-2022
,
s.
2
1
.
2.10.10
.
Protection of hands:
(
1
)
Mittens or gloves shall be worn in the handling of sharp-edged objects or objects with abrasive or rough surfaces, or of corrosive, poisonous or other substances which present similar risks.
(
2
)
It is forbidden to wear mittens or gloves in the handling of mechanized apparatus except where there is a risk of frostbite. In such a case they shall:
(
a
)
permit proper manipulation of the apparatus; and
(
b
)
be easily removable.
(
3
)
(paragraph revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.10
;
483-2021
O.C. 483-2021
,
s.
2
1
.
2.10.11
.
Protection of the other parts of the body:
(
1
)
A worker exposed to molten metal splashings or in contact with hazardous or infectious substances or using dangerous tools shall wear protective equipment such as hood, apron, leg pads and oversleeves.
(
2
)
(Subparagraph revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.11
;
O.C. 329-94, s. 13
.
2.10.12
.
Safety harness:
(
1
)
A safety harness must comply with CAN/CSA Standard Z259.10 Full Body Harnesses and be secured to an anchorage system, in compliance with section 2.10.15, by a fall arrest connecting device that limits the maximum fall arrest force to 6 kN or the free fall distance to 1.8 m.
This fall arrest connecting device must consist of one or more of the following pieces of equipment, including as a minimum the equipment in subparagraph
a
or
b
:
(
a
)
an energy absorber and a lanyard in compliance with CAN/CSA Standard Z259.11 Energy Absorbers and Lanyards. The lanyard, including the energy absorber, must measure not more than 2 m in length;
(
b
)
a self retracting lanyard in compliance with CAN/CSA Standard Z259.2.2 Self-Retracting Devices for Personal Fall-Arrest Systems;
(
c
)
a rope grab in compliance with CSA Standard Z259.2.5 Fall Arresters and Vertical Lifelines or CSA Standard Z259.2.4 Fall Arresters and Vertical Rigid Rails;
(
d
)
a vertical life line in compliance with CSA Standard Z259.2.5 Fall Arresters and Vertical Lifelines or CSA Standard Z259.2.4 Fall Arresters and Vertical Rigid Rails.
A vertical life line must
i
.
be used by only 1 person;
ii
.
be shorter than 90 m; and
iii
.
never be brought into direct contact with a sharp edge.
(
e
)
a connecting component, such as a spring hook, D-ring or snap hook in compliance with CAN/CSA Standard Z259.12 Connecting Components for Personal Fall Arrest Systems.
(
2
)
A self-locking safety catch is not compulsory on a duckbilled snap hook located at the end of a rope used as a means of positioning by a worker assigned to the assembly of the latticework of reinforcing rods supporting a wall or pillar. In such a case, the rope must be less than 0.4 m long, be made of metal rings and be secured at the other end to the safety harness worn by the worker.
In addition to this means of positioning used by the worker, the employer must take at least one of the measures provided for in subparagraphs 3 and 4 of the second paragraph of section 2.9.1 to ensure the worker’s protection.
(
3
)
Where a worker assigned to the erection or checking of power line towers wears a safety harness, the harness must be equipped with one of the following systems:
(
a
)
an energy absorber to which are fastened 2 lanyards, including 1 that must be attached at all times;
(
b
)
an energy absorber to which is fastened 1 lanyard attached by a rope grab to a vertical life line;
(
c
)
a self retracting lanyard equipped with an energy absorber or fastened thereto.
Where the worker moves a life line or the sling of a self retracting lanyard by means of a pole anchor hook, the worker must be attached to the tower only by means of his or her work positioning strap or tether that the worker must fasten to a structural member above him or her.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.12
;
O.C. 1959-86, s. 12
;
O.C. 53-90, s. 2
;
O.C. 995-91, s. 5
;
O.C. 807-92, s. 3
;
O.C. 329-94, s. 14
;
O.C. 35-2001, s. 6
;
O.C. 606-2014, s. 6
.
2.10.13
.
Personal floatation device and life jacket:
(
1
)
Any worker working above or near water must wear an individual floatation device or a life jacket during water transportation aboard an open boat or on the deck of a boat or in the case of a measure provided for in the rescue plan referred to in subparagraph 4 of the first paragraph of section 11.1. The foregoing also applies to a rescue attendant performing a rescue operation on water;
(
2
)
a personal floatation device or a life jacket must
(
a
)
be of the right size;
(
b
)
be designed so as to keep head and face above water;
(
c
)
enable to float without limb effort;
(
d
)
be bright in colour and equipped with reflecting strips visible when in water;
(
e
)
have a minimum floatability of 150 N (33 lbs) that is assured by buoyant materials or by an automatic inflation system activated by immersion;
(
f
)
be approved by Transport Canada or by a body recognized by Transport Canada, as evidenced by the tag or approval stamp affixed to it.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.13
;
O.C. 329-94, s. 15
;
O.C. 513-2015, s. 3
.
2.10.14
.
Safety belt:
Where a worker is equipped with a safety belt, it can be used only to limit the movements of a worker or to keep him in his work position.
Such a belt must comply with CAN/CSA Standard Z259.1 Body Belts and Saddles for Work Positioning and Travel Restraint.
A safety belt shall not be used as individual protective equipment to stop the fall of a worker.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.10.14
;
O.C. 53-90, s. 3
;
O.C. 35-2001, s. 7
;
O.C. 606-2014, s. 7
.
2.10.15
.
Anchorage system:
The fall arrest connecting device of a safety harness must be secured to
(
1
)
a single point of anchorage with one of the following characteristics:
(
a
)
a breaking strength of at least 18 kN; or
(
b
)
designed and installed in accordance with an engineer’s plan in compliance with CSA Standard Z259.16 Design of Active Fall-Protection Systems, and having one of the following characteristics:
i
.
a strength equal to twice the maximum fall arrest force as certified by an engineer; or
ii
.
certified in accordance with EN 795 Personal Protective Equipment against Falls - Anchor devices - published by the European Committee for Standardization or with CAN/CSA Standard Z259.15 Anchorage Connectors;
(
2
)
a flexible continuous anchorage system (horizontal life line) with one of the following characteristics:
(
a
)
in compliance with the following minimum standards:
i
.
a steel cable of a minimum diameter of 12 mm slackened to a minimum angle of 1 vertical to 12 horizontal, or 5 ° from horizontal;
ii
.
a maximum distance of 12 m between the end anchors;
iii
.
end anchors with a breaking strength of at least 90 kN;
iv
.
not to be used by more than 2 workers at a time;
(
b
)
designed and installed in accordance with an engineer’s plan in compliance with CSA Standard Z259.13 Flexible Horizontal Lifeline Systems and CSA Standard Z259.16 Design of Active Fall-Protection Systems;
(
3
)
a rigid continuous anchorage system designed and installed in accordance with an engineer’s plan in compliance with CSA Standard Z259.16 Design of Active Fall-Protection Systems.
An anchorage system:
(
1
)
must be designed so that the D-ring of the suspension point of a worker’s safety harness cannot be moved horizontally by more than 3 m or an angle of 22 °;
(
2
)
cannot be used by more than 1 person at a time, except in the case of a continuous anchorage system, such as a horizontal life line, or a rigid anchorage system, such as a rail; and
(
3
)
must be designed so that properly attached personal protective equipment cannot be detached involuntarily.
The structure on which the anchorage system is installed must be able to withstand the effort exerted by the anchorage system in addition to the other efforts that it must ordinarily withstand.
An anchorage system with the characteristics described in subparagraph
b
of subparagraph 1 or 2 of the first paragraph, or in subparagraph 3 of that paragraph, must, before it is first brought into service, be inspected and tested by an engineer or a qualified person acting under the supervision of an engineer, to ensure that the system is in compliance with the design and installation plans.
O.C. 606-2014, s. 8
.
§
2.11
. —
Electricity
R.R.Q., 1981, c. S-2.1, r. 6, Sd. 2.11
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.1
.
An electrical appliance, electric tool or conductor shall be used only for the purposes for which it was designed.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.1
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.2
.
An electrical appliance or electric tool shall be bonded or have double insulation.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.2
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.3
.
Electrical extension cords shall
(
1
)
have a bonding conductor;
(
2
)
be designed for outdoor use;
(
3
)
be of the Hard Usage type for a circuit 300 V or less, or of the Extra-Hard Usage type for a circuit 600 V or less; and
(
4
)
have a capacity at least equal to the value of the circuit overcurrent device.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.3
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.4
.
Where an extension cord is suspended, the suspension height shall allow free passage.
In addition, supports for suspending the extension cord shall not be conducting or sharp.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.4
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.5
.
Where an extension cord passes on a floor, it shall be protected to avoid any damage or reduce risks of tripping.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.5
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.6
.
An extension cord not in use shall be disconnected and stored.
In addition, an extension cord that has a broken, defective or repaired element shall not be used and shall be removed from the construction site.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.11.6
;
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.7
.
Except where an energy control method provided for in subdivision 2.20 is applied, the components of an electrical circuit of more than 30 V shall be protected to avoid any contact with a live element.
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.8
.
Subject to the provisions relating to alarm systems and fire pumps or any other provision to the contrary provided for in the Construction Code (
chapter B-1.1, r. 2
), the switch of a service box, a feeder or a branch circuit shall not be locked when it is in the energized position.
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.9
.
A 15A or 20A circuit at 125 V supplying an appliance or a cord tool shall be protected by a Class A ground fault circuit interrupter.
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.10
.
A temporary electrical installation shall not be interconnected to the circuit of a permanent electrical installation, unless an appropriate warning is posted at all interconnection points or other locations that constitute a danger.
483-2021
O.C. 483-2021
,
s.
3
1
.
2.11.11
.
The distribution panel of a connection of a temporary outdoor electrical installation shall be weatherproof.
The ground in front and on each side of the panel shall be leveled, drained and free of obstructions to a distance of at least 1 m.
483-2021
O.C. 483-2021
,
s.
3
1
.
§
2.12
. —
Precautions during construction or demolition
2.12.1
.
Any framework shall be calculated, constructed, placed, supported, wind-braced or guyed to resist any load which could be imposed during construction or demolition.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.12.1
.
2.12.2
.
It is forbidden to leave without protection a wall, a chimney or a structure which could collapse during construction or demolition.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.12.2
.
2.12.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.12.3
;
O.C. 391-2011, s. 1
.
2.12.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.12.4
;
O.C. 391-2011, s. 1
.
2.12.5
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.12.5
;
O.C. 391-2011, s. 1
.
§
2.13
. —
Shoring parts
2.13.1
.
Telescopic steel jacks:
(
1
)
On request, the employer shall provide the inspector with a copy of the drawings and informations concerning the ultimate capacity of the jacks, a table of the recommended capacities and the minimum length of penetration of the telescoping parts. He shall also be required to supply details of the joints of threaded parts used, the minimum lengths of thread engagement, the recommended methods of usage by the manufacturer and any other information that might affect safety.
(
2
)
The calculation of jack capacity is based on the results obtained from tests carried out by an independent expert.
(
3
)
The flanges at the jack extremities shall have a net bearing surface corresponding to the capacity of the jacks and in all instances shall have a minimum bearing surface of at least 100 cm
2
and be at least 6 mm thick and made of material currently used.
(
4
)
The length of the penetration of the top part of the jack into the lower part of the jack shall be at least equal to the sixth of the jack length.
(
5
)
The penetration of the threaded portion in the jack shall be equal to 1.5 times the diameter of the tube.
(
6
)
The manufacturer’s name or trade mark, the type of jack and the date of manufacture shall be legibly stamped on all jacks and detachable parts.
(
7
)
The employer shall make sure that the defective parts are replaced by parts of the same quality as the original parts.
(
8
)
The employer shall ensure that tests are made to check the capacity of the welding done on the jacks.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.13.1
.
2.13.2
.
Timber shores:
(
1
)
Rectangular shores shall be at least 89 mm × 89 mm on each side.
(
2
)
Circular shores shall have a minimum diameter of 100 mm.
(
3
)
When shores are spliced end to end, the joint shall be reinforced so as to have the same strength as the shore itself. The joint shall be covered with a piece of the same width as the shore and at least 750 mm in length on 2 adjacent sides of the shore. It is not necessary for the shore parts to be placed end to end when tested assembly clamps are used.
(
4
)
Each part of the spliced shore shall be braced independently in a horizontal manner and, in addition, braced diagonally.
(
5
)
When wedges are used to facilitate the vertical adjustment and removal of shores, they shall be placed on each side of the shore. The vertical space filled by the wedges shall not be greater than the thickness of one wedge.
(
6
)
The timber used for shores shall fulfil the following conditions:
(
a
)
it shall be in good condition, shall be derived from species having long non-breaking fibres and shall be free from any defect that might impair its strength;
(
b
)
it shall be of a quality equal to No. 1 spruce;
(
c
)
if it is in the form of logs, it shall be debarked;
(
d
)
it shall not be covered with paint or any opaque coating.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.13.2
;
O.C. 329-94, s. 16
.
2.13.3
.
Scaffold shoring:
The resistance of the materials making up the scaffold shorings and the support surface of the parts of these scaffolds shall be in accordance with Subdivisions 6.4 and 6.5.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.13.3
.
2.13.3.1
.
All the extensible parts of a scaffold shoring, including adjustment screws, shall comply with one of the following requirements:
(
a
)
bear a mark indicating that, beyond that mark, they are extended beyond the manufacturer’s requirements;
(
b
)
be equipped with a locking device that prevents their extension beyond the manufacturer’s requirements.
A table of the allowable loads and corresponding extension heights shall be available on the construction site premises.
O.C. 1413-98, s. 6
.
§
2.14
. —
Damaged buildings
2.14.1
.
Where a building or structure has been damaged in such a way that it might collapse, totally or partially:
(
a
)
it shall be progressively propped or shored up so as to ensure the safety of persons; or
(
b
)
any other equivalent safety measure shall be taken until the building or structure is demolished, dismantled or repaired.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.14.1
;
O.C. 329-94, s. 17
.
§
2.15
. —
Hoisting apparatus
2.15.1
.
Hoisting apparatus and their accessories shall be:
(
a
)
of safe construction and offering the required strength;
(
b
)
maintained in good working order;
(
c
)
equipped with warning devices when the transportation is motorized; and
(
d
)
equipped with hoisting brakes so designed and installed as to stop a load of 1.5 times the rated load.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.1
.
2.15.2
.
Posting of the rated load:
The rated load shall be posted in a conspicuous place on a hoisting apparatus.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.2
.
2.15.3
.
The employer shall ensure that the hoisting apparatus is not:
(
a
)
loaded beyond the rated load; and
(
b
)
submitted to sudden movements.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.3
.
2.15.4
.
Boom:
The boom of a hoisting apparatus not covered by CSA Standard Z150-1974 Safety Code for Mobile Cranes and its supplement No. 1-1977 or CSA Standard Z248-1975 Code for Tower Cranes shall be installed and built according to the specifications approved by an engineer.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.4
.
2.15.5
.
Load-rating plate:
A load-rating plate showing the nominal capacity of the tower crane, mobile crane or other similar apparatus shall:
(
a
)
be so placed and lighted as to be easily read by the operator;
(
b
)
provide information which complies with that provided by the manufacturer; and
(
c
)
furnish all the necessary information for the safe operation of this equipment.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.5
.
2.15.6
.
Handling of loads:
(
1
)
Before ordering the hoisting of a load, the signalman shall ensure that all cables, chains, slings or other moorings are properly attached to the load and that the hoisting does not present any hazard.
(
2
)
The hoisting of loads shall be done vertically.
(
3
)
When oblique hoisting is absolutely necessary, precautions dictated by the circumstances shall be taken, and this operation shall be performed in the presence of a representative of the employer.
(
4
)
If the safety of any person is threatened by the uncontrolled movement or the swinging of a raised load, one or more guide ropes shall be used.
(
5
)
(Subsection revoked).
(
6
)
The crane operator shall not allow a worker to stand on a load, a hook or a sling suspended to a hoisting apparatus.
(
7
)
Hooks used for hoisting loads and hooks attached to slings shall be equipped with a safety catch.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.6
;
O.C. 53-90, s. 4
;
O.C. 329-94, s. 18
;
O.C. 35-2001, s. 8
.
2.15.7.1
.
All site elevators must conform to CSA Standard Z185-1975 Safety Code for Personnel Hoists.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.1
.
2.15.7.2
.
A mobile crane shall conform to CSA Standard Z150-1974 Safety Code for Mobile Cranes and its supplement No. 1-1977, with the exception of section 4.3.2.5.
A mobile crane log book shall be kept up-to-date in accordance with that standard and shall comply with Schedule 9.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.2
;
O.C. 1413-98, s. 7
;
O.C. 35-2001, s. 9
.
2.15.7.2.1
.
Two-blocking situation protection device:
(
1
)
Any mobile crane with a telescopic boom shall be equipped with a device designed to warn the operator that a two-blocking situation is about to occur, by means of warning lights and buzzer or an apparatus that stops the equipment. The protection device must be of the fail-safe design.
(
2
)
A cable mobile crane must be equipped with a protective device complying with the device described in paragraph 1. Depending on the date on which the crane was manufactured, the device must be installed not later than:
Date on which the crane Final date on which the protection
was manufactured device must be installed
As of the date of coming At the time it was manufactured
into force of this
Regulation
From 1 January 1995 to On the date of coming into force
the day preceding the of this Regulation
date of coming into
force of this Regulation
From 1 January 1990 to 31 December 2001
31 December 1994
From 1 January 1985 to 31 December 2002
31 December 1989
From 1 January 1980 to 31 December 2003
31 December 1984
From 1 January 1975 to 31 December 2004
31 December 1979
From 1 January 1970 to 31 December 2005
31 December 1974
Before 1 January 1970 31 December 2006.
(
3
)
This section does not apply to a cable mobile crane equipped with a shovel, a dragging bucket, a clamshell bucket or a pile hammer and that is used for purposes other than the hoisting of loads and to a cable mobile crane that is used to carry out the following foundation work, including all handling work required to that end: pile driving, installation of drilled or excavated caissons, installation of sheet-piling, setting up of shoring devices, below-grade work, drilling of tie rods or anchors and ground improvement techniques such as dynamic compacting and vibroflotation.
O.C. 53-90, s. 5
;
O.C. 35-2001, s. 10
.
2.15.7.2.2
.
Overload protection device:
(
1
)
Any mobile crane used for hoisting loads must be equipped with one of the following overload protection devices: a rated capacity limiter, a load moment system or a load indicating device. Depending on the date on which the crane was manufactured, the load indicating device must be installed not later than:
Date on which the crane Final date on which the load indicating
was manufactured device must be installed
From 1 January 1980 to 31 December 2005
31 December 2004
From 1 January 1975 to 31 December 2010.
31 December 1979
(
2
)
Any mobile crane manufactured on or after 1 January 2005 must be equipped with a load indicating device or a load moment system. The devices must be of the fail-safe design.
(
3
)
Load indicating devices and load moment systems may be equipped with a function allowing them to be bypassed.
(
4
)
Load indicating devices must comply with Standard SAEJ376 APR85 Load Indicating Devices on Lifting Crane Service.
(
5
)
Rated capacity limiters and load moment systems must comply with Standard SAEJ159 APR94 Load Moment System.
(
6
)
This section does not apply to a cable mobile crane equipped with a shovel, a dragging bucket, a clamshell bucket or a pile hammer and that is used for purposes other than the hoisting of loads and to a cable mobile crane that is used to carry out the following foundation work, including all handling work required to that end: pile driving, installation of drilled or excavated caissons, installation of sheet-piling, setting up of shoring devices, below-grade work, drilling of tie rods or anchors and ground improvement techniques such as dynamic compacting and vibroflotation.
(
7
)
In this section,
“load indicating device” means a device that measures and displays to the crane operator’s sight the weight of the load hoisted by the crane; (
dispositif indicateur de charge
)
“load moment system” means a device that gathers information relating to the load hoisted by the crane and that transmits signals warning the operator that the crane is nearing its limiting conditions; (
contrôleur d’état de charge
)
“rated capacity limiter” means a system that prevents a crane from hoisting and moving a load higher than its limiting conditions and that consists of a load moment system and a device acting on the movements of the crane so that they do not exceed the load rating chart of the crane. (
dispositif limitateur de charge
)
O.C. 35-2001, s. 10
.
2.15.7.3
.
A mobile crane with a luffing boom transformed and used for purposes other than the hoisting of loads such as a shovel, a dragging bucket, a clamshell bucket or a pile hammer shall be equipped with:
(
a
)
bumpers or boom stops; and
(
b
)
a high boom angle switch.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.3
.
2.15.7.4
.
A tower crane shall conform to CSA Standard Z248-1975 Code for Tower Cranes.
A tower crane log book shall be kept up-to-date in accordance with that standard and shall comply with Schedule 10.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.4
;
O.C. 1413-98, s. 8
.
2.15.7.5
.
A general purpose top running electric overhead travelling crane, except a single girder overhead travelling crane, must conform to CSA Standard B-167-1964 General Purpose Electric Overhead Travelling Cranes.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.5
;
O.C. 1959-86, s. 13
.
2.15.7.6
.
A lift truck shall conform to CSA Standard B335.1-1977 Low Lift and High Lift Trucks.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.7.6
.
2.15.7.7
.
A digger derrick manufactured after 1 January 1987 shall comply with ANSI Standard A10.31-1987 Digger Derricks - Safety Requirements, Definitions and Specifications.
It is prohibited to use a digger derrick for purposes other than the purposes for which it was specifically designed and especially to use it to hoist materials.
For the purposes of this section, a digger derrick is an apparatus equipped with a knuckle-boom, mounted on a carrier vehicle and designed specifically to drill holes into the ground and to install posts therein and the material they support.
O.C. 1413-98, s. 9
.
2.15.8
.
(
1
)
The rated capacity of a lifting jack shall be indicated in a legible and indelible manner.
(
2
)
Any lifting jack shall be equipped with a positive stop to prevent overstop or with a stop indicator in order to determine the limit of travel.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.8
;
O.C. 329-94, s. 19
.
2.15.9
.
Hoisting apparatus shall be assembled, maintained and dismantled under the supervision of experienced workers and in accordance with the manufacturer’s recommendations.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.9
.
2.15.10
.
Minimum age:
No work performed by means of a motorized hoisting apparatus may be performed by a worker under 18 years of age.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.15.10
;
O.C. 329-94, s. 20
.
§
2.16
. —
Piles, sheet-piling
2.16.1
.
Handling:
Piles and sheet-piling shall at all times be firmly held up with a device other than the hand of the worker, during their installation and removal.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.16.1
.
2.16.2
.
Handling area:
No worker who is not assigned to the handling of piles and sheet-piling shall be in that area.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.16.2
;
O.C. 329-94, s. 21
.
2.16.3
.
Pile hammer:
When not in use, any pile hammer shall not be kept in a raised position.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.16.3
.
2.16.4
.
Pile heads:
Any pile head, before being driven in, shall be:
(
a
)
cut at right angle; and
(
b
)
free from debris, bark or chips.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.16.4
.
§
2.17
. —
(Revoked)
R.R.Q., 1981, c. S-2.1, r. 6, sec. II, ss. 2.17
;
O.C. 329-94, s. 23
.
2.17.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.17.1
;
O.C. 329-94, s. 23
.
§
2.18
. —
Transportation of workers
2.18.1
.
Any motor vehicle used for the transportation of workers must conform to any provision of the Highway Safety Code (chapter C-24.2) in the same way as any vehicle used on a public highway.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.1
;
O.C. 1959-86, s. 14
.
2.18.2
.
Vehicle driver:
The employer shall make sure that the driver of the vehicle used for the transportation of workers:
(
a
)
has the permit required by the Highway Safety Code (chapter C-24.2);
(
b
)
informs the person concerned of all defects of his vehicle; and
(
c
)
does not transport anyone if the reported defects have not been repaired, or if he judges that his vehicle does not offer all the safety guarantees.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.2
;
O.C. 1959-86, s. 15
.
2.18.3
.
The employer shall ensure that any transported worker:
(
a
)
is seated on seats or benches at his disposal during transportation, except in the case of motor vehicles specially equipped for the transportation of persons standing up; and
(
b
)
boards or gets out of the vehicle only when the latter is completely stopped, and uses the boarding devices that are at his disposal.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.3
.
2.18.4
.
Vehicle arrangement:
(
1
)
Any motor vehicle primarily or regularly used for the transportation of workers shall:
(
a
)
be provided with handholds, steps and other accessories so placed and arranged that the workers can safely get in or out of the vehicle;
(
b
)
be provided with a device by which passengers can communicate with the driver, when the driver’s compartment is separated from the passengers’ compartment;
(
c
)
never transport a number of passengers that may jeopardize the safe driving of the vehicle or the safety of passengers; and
(
d
)
have the floor and the interior space reserved for passengers, in good condition and free from nails, screws, splinters, and other objects likely to be injurious to passengers.
(
2
)
Trucks and buses primarily or regularly used for the transportation of workers shall be:
(
a
)
constructed and accommodated for that purpose;
(
b
)
provided with seats or benches firmly secured in place;
(
c
)
covered with a roof and protected on the sides with solid walls having a minimum height of 1.2 m;
(
d
)
provided with 2 Bengal flares or 2 flashing lights. In case of a break-down on the road or within 3 m of the road, one of these devices shall be placed 30 m in front of the vehicle and the other one 30 m behind;
(
e
)
provided with a portable fire extinguisher in compliance with section 3.4.4 of this Code. The driver shall have the necessary knowledge concerning the type of fire extinguisher with which the trucks and buses are equipped and how it is operated;
(
f
)
provided with a first-aid kit in the driver’s compartment.
(
3
)
Trucks primarily or regularly used for the transport of the workers shall be provided with seats or benches offering the following characteristics:
(
a
)
a minimum width of 450 mm for each passenger;
(
b
)
so placed as to allow for a longitudinal aisle at least 600 mm when the seats are facing each other and 300 mm wide in other cases;
(
c
)
have a height between 380 mm and 480 mm above the floor;
(
d
)
have a minimum depth of 300 mm; and
(
e
)
provided with backrests extending to a height of at least 500 mm above the level of the seats or benches if these are not placed near the truck-rack or walls.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.4
;
O.C. 329-94, s. 24
.
2.18.5
.
Special provisions:
(
1
)
Flat-bed trucks and pickups, occasionally used for the transportation of workers can be put into service, if the following conditions are observed:
(
a
)
space allowing, workers shall ride in the driver’s compartment and there shall not be more than 3 persons for a single cab;
(
b
)
flat-bed trucks shall be protected on their sides with racks or walls having a minimum height of 900 mm;
(
c
)
workers shall sit on benches placed near the sides of the platform and firmly fitted to the floor, and having a height between 380 mm and 480 mm;
(
d
)
tailgates shall be kept closed while travelling; and
(
e
)
the truck shall be equipped with a tarpaulin to protect workers against bad weather.
(
2
)
Any truck with a closed body, used for the transportation of workers, shall have:
(
a
)
the floor of the workers’ compartment airtight so as to prevent intoxication by exhaust gases;
(
b
)
the tailpipe extended beyond the end of the body;
(
c
)
openings specially arranged to allow natural ventilation and lighting of the vehicle for daytime driving; and
(
d
)
artificial lighting inside the workers’ compartment for night time driving.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.5
.
2.18.6
.
Prohibited transportation:
Transportation of persons is forbidden in trailers and semi-trailers.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.6
.
2.18.7
.
Simultaneous transportation of workers and materials:
(
1
)
Vehicles used for the transportation of workers shall not carry dangerous pesticides and flammable substances, unless these substances are carried in receivers designed for this purpose and outside the compartments occupied by the drivers or passengers.
(
2
)
All sharp tools carried in the driver’s or the passengers’ compartment shall be:
(
a
)
placed in boxes or covered containers; or
(
b
)
protected by scabbards covering the sharp edge and secured to the body of the vehicle outside of the aisles.
(
3
)
It is permitted to carry simultaneously in the same compartment, the workers, and:
(
a
)
small materials, as long as a stowing device prevents any movement of materials likely to injure the passengers;
(
b
)
bulk material, if a safe device prevents this material from filling the place reserved for passengers.
(
4
)
No worker shall ride on a vehicle load while the vehicle is moving.
R.R.Q., 1981, c. S-2.1, r. 6, s. 2.18.7
.
§
2.19
. —
Prohibited work method and technique
O.C. 995-91, s. 6
.
2.19.1
.
It is prohibited to use a liquified gas to freeze a water pipe unless the gas is physiologically inert and nonflammable.
O.C. 995-91, s. 6
;
O.C. 1413-98, s. 10
.
2.19.2
.
When freezing a water pipe in a trench or in an obstructed space by using a liquified, physiologically inert and nonflammable gas, the following measures shall be taken:
(
a
)
the trench or the obstructed space shall be ventilated by an exhaust ventilation system so that the concentration of oxygen in the air is at all times equal to or greater than 19.5% at the place occupied by the worker to carry out his work;
(
b
)
a device to measure the concentration of oxygen in the air shall be available on the work site at all times.
For the purposes of this section, an obstructed space is a space marked off by a wall, a partition wall, a ceiling or any other physical obstacle where the circulation of air with the outside is insufficient to maintain a percentage of oxygen in the obstructed space equal to or greater than 19.5% in air volume.
O.C. 1413-98, s. 10
.
2.19.3
.
A worker freezing a water pipe shall wear mittens or gloves as a protection against chilblain.
O.C. 1413-98, s. 10
.
§
2.20
. —
Lockout and other energy control methods
O.C. 1186-2015, s. 1
.
2.20.1
.
In this subdivision,
“
danger zone
” means any zone situated inside or around a machine and which poses a risk for the health, safety or physical well-being of workers;
“
energy control method
” means a method designed to maintain a machine out of working order in such a way that the working order cannot be altered without the voluntary action of every person having access to the danger zone;
“
individually keyed
” means a special layout of the components of a lock making it possible to open it with a single key;
“
lockout
” means an energy control method designed to install an individually keyed lock on an energy isolating device or on any other device allowing for the control of energy such as a lockout box.
O.C. 1186-2015, s. 1
.
2.20.2
.
Before undertaking any work in the danger zone of a machine, such as erecting, installing, adjusting, inspecting, unjamming, setting up, decommissioning, maintaining, dismantling, cleaning, servicing, refurbishing, repairing, altering or unlocking, lockout, or, failing that, any other method that ensures equivalent safety must be applied in accordance with this subdivision.
This subdivision does not apply
(
1
)
where work is carried out in the danger zone of a machine that has a specific control mode as defined in section 2.20.13;
(
2
)
where a machine is unplugged within the reach and under the exclusive control of the person who uses it, where the machine has a single energy source and where there remains no residual energy after the machine is unplugged.
O.C. 1186-2015, s. 1
.
2.20.3
.
Lockout must be carried out by every person having access to the danger zone of a machine.
O.C. 1186-2015, s. 1
.
2.20.4
.
Where the principal contractor intends to apply an energy control method other than lockout, the principal contractor must first ensure the equivalent safety of that method by analyzing the following:
(
1
)
the machine features;
(
2
)
identification of the health and safety risks when using the machine;
(
3
)
the estimate of the frequency and seriousness of the potential employment injuries for each risk identified;
(
4
)
the description of prevention measures that apply for each risk identified, the estimate of the level of risk reduction thus obtained and the assessment of residual risks.
The results of the analysis must be recorded in a written document.
The method referred to in the first paragraph must be developed from the elements mentioned in subparagraphs 1 to 4 of the first paragraph.
O.C. 1186-2015, s. 1
.
2.20.5
.
The principal contractor must, for every machine situated on the construction site, ensure that one or more procedures describing the energy control method are developed and applied.
The procedures must be easily accessible on the sites where work is carried out in written form intelligible to every person having access to the danger zone of a machine.
Where the duration of a construction site lasts more than 1 year, the procedures must be reviewed periodically so as to ensure that the energy control method remains efficient and safe.
O.C. 1186-2015, s. 1
.
2.20.6
.
A procedure describing the energy control method must include the following:
(
1
)
identification of the machine;
(
2
)
identification of the person responsible for the energy control method;
(
3
)
identification and location of every control device and of every energy source of the machine;
(
4
)
identification and location of every cutoff point of every energy source of the machine;
(
5
)
the type and quantity of material required for applying the method;
(
6
)
the steps required to control the energy;
(
7
)
where applicable, the measures designed to ensure the continuity of application of the energy control method during a staff rotation, in particular the transfer of required material;
(
8
)
where applicable, the applicable characteristics, such as the release of residual or stored energy, the required personal protective equipment or any other complementary protection measure.
O.C. 1186-2015, s. 1
.
2.20.7
.
Where lockout is the method applied, the steps required to control energy for the purposes of paragraph 6 of section 2.20.6 must include:
(
1
)
deactivation and complete shutdown of the machine;
(
2
)
elimination or, if that is impossible, control of any residual or stored energy source;
(
3
)
lockout of the machine’s energy source cutoff points;
(
4
)
verification of lockout by using one or more techniques making it possible to reach the highest level of efficiency;
(
5
)
safely unlocking and re-operating the machine.
O.C. 1186-2015, s. 1
.
2.20.8
.
Before applying an energy control method, the principal contractor must ensure that the persons having access to the danger zone of the machine are trained and informed on the health and safety risks related to work carried out on the machine and on the prevention measures specific to the energy control method applied.
O.C. 1186-2015, s. 1
.
2.20.9
.
An employer or a self-employed worker must obtain written authorization from the principal contractor before undertaking work in the danger zone of a machine. The principal contractor must make sure that the employer or self-employed worker will apply an energy control method that complies with this subdivision.
O.C. 1186-2015, s. 1
.
2.20.10
.
Where one or more employers or self-employed workers carry out work in the danger zone of a machine, it is the principal contractor’s responsibility to coordinate the measures to be taken to ensure the application of the energy control method, in particular by determining their respective roles and their means of communication.
O.C. 1186-2015, s. 1
.
2.20.11
.
The principal contractor must provide lockout material including individually keyed locks, except if an employer or self-employed worker is responsible therefor pursuant to section 2.20.10.
The name of the person who installs an individually keyed lock must be clearly indicated on the individually keyed lock. Despite the foregoing, the principal contractor may provide persons having access to the danger zone of a machine with individually keyed locks with no name indication, if the principal contractor keeps a record thereof.
The record contains at least the following information:
(
1
)
identification of each individually keyed lock;
(
2
)
the name and telephone number of each person to whom a lock is given;
(
3
)
where applicable, the name and telephone number of the employer of each worker to whom a lock is given;
(
4
)
the date and time at which the lock is given;
(
5
)
the date and time at which the lock is returned.
O.C. 1186-2015, s. 1
.
2.20.12
.
Where a lock is forgotten or a key is lost, the principal contractor may, with the agreement of the person who carried out lockout, authorize the lock to be cut after ensuring that it does not involve any danger for the health, safety and physical well-being of that person.
Where the agreement of the person who carried out lockout is not obtained, the principal contractor must, before authorizing the lock to be cut, inspect the danger zone of the machine accompanied by a representative of the certified association of which the person is a member, if he or she is available on the work site or, failing that, by a worker present on the work site designated by the principal contractor.
Every instance of a lock being cut must be entered in a written document kept by the principal contractor for at least one year following the day on which the applicable energy control method is altered.
O.C. 1186-2015, s. 1
.
2.20.13
.
Where, for setting, maintenance, inspection or other work on a machine, a guard has to be displaced or removed or a protective device has to be neutralized, and where it is necessary for the purpose of those operations for the machinery or part of it to be put into operation, worker safety must be ensured using a specific control mode which
(
1
)
disables all other control modes;
(
2
)
allows operation of elements presenting a risk for worker health and safety only by continuous actuation of an enabling device, a two-hand control device or a hold-to-run control device;
(
3
)
allows operation of the elements presenting a risk for worker health and safety only in reduced risk conditions for instance, at reduced speed, under reduced power or force or in a step-by-step mode, for example, with a limited movement device;
(
4
)
prevents voluntary or involuntary action on the machine’s sensors from triggering a function presenting a risk for worker health and safety.
O.C. 1186-2015, s. 1
;
1112-2023
O.C. 1112-2023
,
s.
8
1
.
2.20.14
.
This subdivision applies, with the necessary modifications, to any work on an electrical installation.
O.C. 1186-2015, s. 1
.
§
2.21
. —
Noise
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.1
.
This subdivision sets noise exposure limits, means for evaluating the daily noise exposure level and peak sound pressure level in an establishment, and the standards applicable.
The provisions of this subdivision are intended to eliminate or reduce noise at source or, at a minimum, to reduce workers’ exposure to noise.
They also specify the reasonable means that an employer must implement to eliminate or reduce noise at source, comply with the noise exposure limits, and reduce workers’ exposure to noise. They specify the workplace situations in which the wearing of hearing protectors is necessary.
For the purposes of this subdivision,
“
workplace situation
”
means a trade or a representative function of a worker or group of workers that includes all the tasks and activities of the worker or group of workers, and takes into account the workplace.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.2
.
The noise exposure limits are as follows:
(
1
)
daily noise exposure level: 85 dBA, as defined using one of the following formulas:
(
a
)
under ISO Standard 9612:2009, Acoustics – Determination of occupational noise exposure – Engineering method:
L
EX,8h
= L
P,A,eqTe
+ 10 lg [T
e
/T
0
] dB,
where
T
e
= effective duration of the working day, in hours;
T
0
= reference duration, 8 h;
(
b
)
under CSA Standard Z107.56-13, 2014, Measurement of noise exposure:
L
ex,8h
= L
eq,t
+ 10 log (T
W
/8),
where T
w
= effective duration of the working day, in hours;
(
2
)
peak sound pressure level (L
p,Cpeak
): 140 dBC, using the following formula, provided for in ISO Standard 9612:2009, Acoustics – Determination of occupational noise exposure – Engineering method:
L
p,Cpeak
= 10 lg[p
2
Cpeak
/p
2
0
] dB,
where the reference value, p
0
, is 20 μPa.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.3
.
When purchasing or replacing a tool, vehicle, piece of machinery, machine or piece of equipment, the employer must implement reasonable means so that the one that produces the least noise is acquired.
The reasonable means referred to in the first paragraph must not compromise any other element of worker health or safety.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.4
.
When planning and performing work, the employer must identify workplace situations that may exceed the noise exposure limits and implement reasonable means to eliminate or reduce noise, in particular by taking into consideration one or several of the following means:
(
1
)
eliminate or reduce noise at source;
(
2
)
limit the propagation of noise by enclosing a machine or piece of equipment;
(
3
)
reduce a worker’s exposure, in particular by isolating a workstation;
(
4
)
maintaining a machine or piece of equipment and keeping it in proper working order.
When it is not possible to respect the exposure limits, the employer must implement all the reasonable means identified, even if they do not allow the noise to be reduced sufficiently to respect the exposure limits.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.5
.
The employer must reduce the workers’ daily exposure to noise, in accordance with section 2.21.6, or provide them with hearing protectors in accordance with the rules established in section 2.21.10,
(
1
)
during the time needed to implement a reasonable measure;
(
2
)
during the time needed to repair or maintain a machine or piece of equipment;
(
3
)
when it is not possible to respect the exposure limits; or
(
4
)
in the situations referred to in section 2.21.7.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.6
.
To determine the reduction in the workers’ daily exposure to noise, the employer must
(
1
)
ensure, if a worker is affected by a single workplace situation comprising a single task or activity that may exceed the exposure limits during the working day, that the worker is not exposed to the equivalent continuous sound pressure level (dBA) specified in the following table for longer than the time indicated:
Equivalent continuous sound pressure level (dBA)
Maximum permitted daily duration
82
16
Hours
83
12
85
8
88
4
91
2
94
1
97
30
Minutes
100
15
103
7
106
4
109
2
112
1
115
28
Seconds
118
14
121
7
124
3
127
1
130-140
< 1
(
2
)
determine, if a worker is affected by a workplace situation comprising more than one task or activity that may exceed the exposure limits during the working day, a reduction in the daily exposure to noise using the calculator published by the Commission on its website. The L
ex,8h
or L
EX,8h
daily exposure level calculated in this way must be consistent with the daily noise exposure limit.
This section shall not have the effect of permitting a work period that is longer than the period authorized by a law or regulation, a collective agreement, an order in council or a contract of employment.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.7
.
The wearing of hearing protectors is mandatory when
(
1
)
the noise level to which a worker is exposed exceeds the exposure limits according to an evaluation based on a measurement made in accordance with section 2.21.8 or using a Type I or Type II integrating sound level meter or a Type II dosimeter;
(
2
)
it is not possible to converse with another person in a normal speaking voice, in other words without raising one’s voice or shouting, at a distance of approximately 1 m or one arm’s-length from the other person, or if impulse noise is present.
The evaluation of noise using an integrating sound level meter or dosimeter must be performed by a person with the necessary knowledge acting in compliance with best practices. The person must be available throughout the working day. In addition, the integrating sound level meter or dosimeter must be correctly calibrated on site, before and after the measurement is made, in accordance with the manufacturer’s instructions for the instrument used.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.8
.
The measurement of the daily noise exposure level and peak sound pressure level must be made in view of the recommendations made in ISO Standard 9612:2009, Acoustics – Determination of occupational noise exposure – Engineering method, – or in CSA Standard Z107.56-13, 2014, Measurement of noise exposure.
In addition, the integrating sound level meter or dosimeter used for the measurement must be a model recommended in one of the 2 standards.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.9
.
The measurement of the daily noise exposure level and peak sound pressure level must be made by
(
1
)
a professional or technician with training in occupational hygiene or specialized training in acoustics; or
(
2
)
a person who masters best practices in the field of noise measurement.
This section shall not have the effect of preventing the employer from designating a person to assist the person referred to in the first paragraph, provided the latter person retains entire responsibility for the measurements made pursuant to section 2.21.8.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.10
.
The employer must provide hearing protectors that meet the performance and selection requirements in the following clauses of CSA Standard Z94.2-2014, Hearing Protection Devices – Performance, Selection, Care, and Use:
(
1
)
3 to 8.2.1;
(
2
)
8.2.4 to 9.1;
(
3
)
9.3.4;
(
4
)
9.4;
(
5
)
9.5.3 to 9.6.1;
(
6
)
9.6.3 to 9.7.1;
(
7
)
9.8.3;
(
8
)
9.9 to 10.3.5;
(
9
)
11.2.3 to 11.2.5;
(
10
)
12 to 12.2.6.3;
(
11
)
tables 1 to 6;
(
12
)
annexes A, B and D.
For the purposes of Clause 9.6.4.3 of the standard, the result of a measurement performed in accordance with section 2.21.8 may be used as a measurement of a worker’s noise exposure, namely the L
ex,8h
or L
EX,8h
equivalent.
That measurement is not mandatory where the employer selects hearing protectors according to the single-number ratings method provided for in the standard.
The employer may also provide hearing protectors that meet
(
1
)
the performance requirements set out in the following clauses of Hearing protectors - general requirements or Safety requirements and testing, as the case may be:
(
a
)
1 to 6 and annexes A and ZA of Part 1: Ear-muffs, NF EN 352-1;
(
b
)
1 to 6 and annexes A and ZA of Part 2: Earplugs, NF EN 352-2;
(
c
)
1 to 6 and annexes A and ZA of Part 3: Ear-muffs attached to an industrial safety helmet, NF EN 352-3;
(
d
)
1 to 7 and annexes A, B and ZA of Part 4: Level-dependent ear-muffs, NF EN 352-4;
(
e
)
1 to 7 and annexes A, B and ZA of Part 5: Active noise-reduction ear-muffs, NF EN 352-5;
(
f
)
1 to 7 and annexes A, B and ZA of Part 6: Ear-muffs with electrical audio input, NF EN 352-6;
(
g
)
1 to 7 and annexes A, B and ZA of Part 7: Level-dependent earplugs, NF EN 352-7; and
(
2
)
the selection requirements set out in the following clauses of the NF Standard EN 458:2016, Hearing protectors - Recommendations for selection, use, care and maintenance - Guidance document:
(
a
)
3 to 4;
(
b
)
6 to 6.2.1;
(
c
)
6.2.3 to 6.5;
(
d
)
6.8 to 6.9.2;
(
e
)
annexes A to E.
For the purposes of Clause 6.2.3.2 and Annex B of NF Standard EN 458:2016, the result of a measurement made in accordance with section 2.21.8 may be used as a measurement of the peak sound pressure level.
A hearing protector meets the requirements of this section if it conforms to the most recent or second most recent version of a standard named in the section and has not exceeded the manufacturer’s expiry date, if any.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.11
.
The hearing protectors provided for a worker must attenuate noise in such a way that the worker is not exposed to levels that exceed those established in section 2.21.2.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.12
.
The employer must provide workers with theoretical and practical training on hearing protectors that addresses
(
1
)
their use and the elements to be taken into consideration in selecting hearing protectors in response to different workplace situations;
(
2
)
the adjustment of hearing protectors;
(
3
)
the inspection of hearing protectors;
(
4
)
the maintenance of hearing protectors;
(
5
)
the risks associated with noise and the importance of wearing protectors during any exposure to noise;
(
6
)
the methods used to evaluate noise levels pursuant to section 2.21.7.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.13
.
The employer must post or disseminate in another way any report of a measurement made pursuant to section 2.21.8 not later than 15 days after the report becomes available.
The report must be readily accessible to workers in a visible place until the closure of the worksite or for a minimum period of 3 months, whichever date occurs first.
781-2021
O.C. 781-2021
,
s.
2
1
.
2.21.14
.
The employer must include and update in the prevention program, or if none in a register, the following entries and documents:
(
1
)
the workplace situations where limits may be exceeded, as identified when the work was planned;
(
2
)
the reasonable means implemented;
(
3
)
the reports on the measurements made pursuant to section 2.21.8, if applicable.
The employer must keep the information specified in the first paragraph for a period of 10 years, and must keep the other information until the closure of the worksite. The employer must also make it available to the Commission, to workers and their representatives, to the safety representative and to the health and safety committee.
781-2021
O.C. 781-2021
,
s.
2
1
.
DIVISION
III
CONSTRUCTION SITES
§
3.1
. —
Access to construction site
R.R.Q., 1981, c. S-2.1, r. 6, sec. III, ss. 3.3
;
O.C. 329-94, s. 29
.
3.1.1
.
Access to the construction site shall be at all times limited to personnel authorized by the site head.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.3.1
;
O.C. 329-94, s. 29
.
§
3.2
. —
Housekeeping of site
R.R.Q., 1981, c. S-2.1, r. 6, sec. III, ss. 3.1
;
O.C. 329-94, s. 29
.
3.2.1
.
Any construction site, including all means of access or egress, shall be kept in a tidy condition and no hazard shall be allowed to develop from the storage of material or equipment, the accumulation of waste or the condition of any material or piece of equipment.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.1
;
O.C. 329-94, s. 29
.
3.2.2
.
Waste material:
(
1
)
Waste material shall never be thrown from one level to another.
(
2
)
Waste material shall be cleared away progressively:
(
a
)
by means of appropriate containers;
(
b
)
by an inclined or vertical chute emptying into a truck box, a container or an enclosure off limits to workers and strictly reserved for motorized equipment. The box, container or enclosure shall be large enough to hold all waste material emptied into it.
The chute shall:
i
.
be enclosed if inclined more than 45º;
ii
.
be closed at its entrance when not in use; and
iii
.
have a stop-block at its entrance to stop wheelbarrows; or
(
c
)
by means of a hoisting apparatus, if large pieces or objects are involved.
(
3
)
(Subsection revoked).
(
4
)
Waste material shall be transported or so disposed as to create no inconvenience.
(
5
)
Lumber, brick, blocks, stone, steel and other salvaged materials shall be stacked in an orderly fashion and in accordance with the rules of the trade.
(
6
)
(Subsection revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.2
;
O.C. 53-90, s. 6
;
O.C. 329-94, s. 25.and 29
.
3.2.3
.
Protruding nails and other protruding parts:
(
1
)
Nails protruding from a piece of wood or any scrap shall be pulled out or nailed down unless such material is piled or placed in a container to be transported outside the site.
(
2
)
During dismantling, protruding nails from a reusable piece of wood shall be removed immediately.
(
3
)
The tie rods for concrete formwork and other protruding parts shall be cut away as soon as possible after the deforming.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.3
;
O.C. 329-94, s. 26 and 29
.
3.2.4
.
Maintenance and arrangement of the work site:
Traffic lanes, passages and any work site in general shall:
(
a
)
be kept free of any obstacle and well-cleared;
(
b
)
be kept free of all snow, ice, oil or grease;
(
c
)
be sprinkled with sand or any other non-skid product in order to prevent slipping and falling;
(
d
)
not be obstructed with equipment, tools or material;
(
e
)
not be cluttered with waste products from a mechanical tool;
(
f
)
be illuminated by natural or artificial lighting so as to provide the following lighting levels:
i
.
50 lux on traffic lanes and passages used by workers;
ii
.
250 lux for rough work, such as casing, concrete pouring or carpentry;
iii
.
550 lux for finishing work using a machine or tool, such as a circular saw, a nailing gun or a welding machine;
iv
.
800 lux for precision mechanical work;
(
g
)
have a minimum width of 600 mm between machines, installations or piles of materials or goods. This width shall be increased according to the danger present or the size of the parts to be handled;
(
h
)
(paragraph revoked);
(
i
)
have no opening at floor or roof level, unless the opening is surrounded by guard-rails or closed by a load resistant cover for any loads to which it may be subjected, but not less than 2.4 kN/m
2
. If the cover or guard-rails interfere with the carrying out of the work, the cover or the guard-rails may be removed and replaced, for the duration of the work, by installing a continuous barrier or trestles of a minimum height of 0.7 m, at a distance varying between 0.9 m and 1.2 m from the opening, or a warning line complying with the requirements in section 2.9.4.1.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.4
;
O.C. 329-94, ss. 27 and 29
;
O.C. 1413-98, s. 11
;
O.C. 35-2001, s. 11
;
O.C. 606-2014, s. 9
;
640-2019
O.C. 640-2019
,
s.
2
1
.
3.2.5
.
Hazard signs:
A danger zone shall be marked off by hazard signs:
(
a
)
below an outrigger scaffolding, a suspended scaffolding or a boatswain’s chair; and
(
b
)
at any place where a mobile crane, concrete pump, derrick, jib crane, derrick crane, mechanically raised aerial platform apparatus or an aerial basket is used.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.5
;
O.C. 995-91, s. 7
;
O.C. 329-94, s. 29
;
O.C. 1413-98, s. 12
.
3.2.6
.
Drinking water:
(
1
)
The employer shall supply his workers with drinking water by putting water fountains or clean individual cups and a sufficient supply of water at their disposal.
(
2
)
If the water does not come from a municipal aqueduct, it shall be analysed at the beginning of the works and every 3 months thereafter.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.6
;
O.C. 329-94, s. 29
.
3.2.7
.
Toilets:
As of the first day of work, a toilet must be placed at the disposal of workers. If 25 or more workers are to occupy the site at the same time, a flushing toilet must be placed at their disposal, even if all the workers are not yet present on site. If there never will be more than 24 workers on site, a chemical toilet may be at their disposal.
One toilet is provided per group of 30 workers or fewer.
If a flushing toilet is not connected to a waterworks or sewer system in accordance with the Construction Code (chapter B-1.1, r. 2), it must collect the waste in a tank to process the waste chemically and be built in accordance with the standard Sanitation - Nonsewered Waste - Disposal Systems - Minimum requirements, ANSI Z4.3-1995 (R. 2005), published by the American National Standards Institute.
The obligation to place a toilet at the disposal of workers is met if the workers are authorized to use the sanitary facilities of an establishment located at a distance that complies with section 3.2.7.1
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.7
;
O.C. 329-94, s. 28.and 29
;
O.C. 428-2015, s. 3
.
3.2.7.1
.
Toilets must be located at a distance not exceeding 150 m (500 ft.) from the work area and must not be more than 4 storeys higher or lower than the work area.
O.C. 428-2015, s. 3
.
3.2.7.2
.
A toilet must be
(
1
)
within easy access;
(
2
)
free from any obstacle or obstruction that could prevent the toilet from being used;
(
3
)
built so that the occupant is sheltered from view and protected from the weather and falling objects;
(
4
)
provided with natural or artificial lighting;
(
5
)
equipped with a seat and cover;
(
6
)
provided with toilet paper;
(
7
)
heated to a minimum of 20 °C; and
(
8
)
ventilated.
The toilet must be maintained in good operating condition and in a clean and sanitary condition and be kept free of vermin, rodents and insects.
Any cracked or damaged toilet seat must be replaced immediately.
O.C. 428-2015, s. 3
.
3.2.8
.
Sinks:
The employer shall provide the workers who handle corrosive or toxic materials with sinks or showers that comply with section 3.2.15 and that enable them to wash with clean water, and likewise provide them with paper towels or individual hand towels.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.8
;
O.C. 329-94, s. 29
;
O.C. 393-2011, s. 8
.
3.2.8.1
.
Flushing toilet accessories:
A sink containing clean and temperate water must be placed at the disposal of workers for each flushing toilet. The sink must be maintained in good operating condition and in a clean and sanitary condition and the following products must be placed at the disposal of workers:
(
a
)
soap or another cleansing agent;
(
b
)
a hand dryer, roller towels or paper towels;
(
c
)
where paper towels are used, waste paper baskets for their disposal.
A notice indicating that the water is not suitable as drinking water must be displayed so that it is visible to workers, where applicable.
O.C. 428-2015, s. 4
.
3.2.9
.
Lunch room:
On any work site where there are 10 or more workers and where the work lasts more than 7 days, the employer must make a room available to the workers where they may take their meals. The room must
(
a
)
not have any dimension of less than 2.3 m;
(
b
)
have 1.1 m
2
of floor area per person who eats in the room;
(
c
)
be heated to a minimum of 20 °C;
(
d
)
be properly ventilated and lighted and prohibited to smoking;
(
e
)
be provided with hooks for clothing;
(
f
)
be furnished with sufficient tables and chairs for the number of workers who may eat there at the same time;
(
g
)
be supplied with covered recipients for waste; and
(
h
)
be maintained in good, clean and sanitary condition.
The room must not serve for the storage of materials, equipment or tools.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.1.9
;
O.C. 329-94, s. 29
;
O.C. 428-2015, s. 5
.
3.2.10
.
Changing room:
The employer must provide a changing room to workers working in an underground work site or to those who must wear specific clothing, used exclusively for
(
1
)
abrasive blasting;
(
2
)
work liable to produce asbestos dust emissions where moderate-risk work is carried out in accordance with paragraph 2 of section 3.23.2; and
(
3
)
work carried out in heat stress that exceeds the continuous work curve in the “Permissible heat exposure limit values” graph in Schedule V to the Regulation respecting occupational health and safety (chapter S-2.1, r. 13);
(
4
)
(paragraph revoked).
O.C. 393-2011, s. 9
;
O.C. 1005-2015, s. 1
.
3.2.11
.
Changing room features:
The changing room referred to in section 3.2.10 must be in an area separate from the work area, have a minimum level of illumination of 250 lux and be maintained at a minimum temperature of 20 °C, be provided with drinking water, installations to dry work clothes and individual lockers to store clothes. In addition, the storage space of each locker must be at least 0.14 m
3
and there must be a clearance of at least 600 mm in front of each row of lockers.
O.C. 393-2011, s. 9
.
3.2.12
.
Double changing room:
The employer must provide workers with a changing room for street clothes and another one for work clothes, between which a shower room is set up so that workers may shower before wearing their street clothes,
(
1
)
for work liable to produce asbestos dust emissions where high-risk work is carried out according to paragraph 3 of section 3.23.2; or
(
2
)
where workers are exposed to lead, mercury or beryllium or their compounds, in the form of vapour or dust.
O.C. 393-2011, s. 9
.
3.2.13
.
Layout of the facilities:
The facilities referred to in section 3.2.12 must be contiguous to the work area, each changing room and the shower room must be in separate, communicating rooms used exclusively for the purposes referred to in section 3.2.12. The changing rooms must comply with section 3.2.11 and the showers with section 3.2.15.
O.C. 393-2011, s. 9
.
3.2.14
.
Showers:
The employer must provide showers to workers working in an underground work site or to those who must wear specific clothing, used exclusively for
(
1
)
abrasive blasting;
(
2
)
work liable to produce asbestos dust emissions where high-risk work is carried out in accordance with paragraph 3 of section 3.23.2;
(
3
)
work where workers are exposed to lead, mercury or beryllium or their compounds, in the form of vapour or dust; and
(
4
)
work carried out in heat stress that exceeds the continuous work curve in the “Permissible heat exposure limit values” graph in Schedule V to the Regulation respecting occupational health and safety (chapter S-2.1, r. 13);
(
5
)
(paragraph revoked).
O.C. 393-2011, s. 9
;
O.C. 1005-2015, s. 1
.
3.2.15
.
Shower features:
The showers referred to in section 3.2.14 must be installed separately for each sex, not less than 1 shower per 10 workers or fewer of each sex, in rooms that are maintained at a minimum temperature of 20 °C and that have a minimum level of illumination of 250 lux. They must be supplied with temperature controlled potable water, be provided with soap, individual towels and hand towels, and be cleaned and disinfected at least once per shift, when they have been used.
O.C. 393-2011, s. 9
.
§
3.3
. —
Temporary structures
R.R.Q., 1981, c. S-2.1, r. 6, sec. III, ss. 3.2
;
O.C. 329-94, s. 28
.
3.3.1
.
Ramps, platforms, runways, scaffolding, and other temporary structures shall be designed and constructed according to recognized methods so as to avoid any risk of collapse or any other danger of accident.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.2.1
;
O.C. 329-94, s. 29
.
3.3.2
.
Any temporary structure shall be sufficiently braced in order to withstand all loads that might be applied during construction, restoration or demolition.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.2.2
;
O.C. 329-94, s. 29
.
3.3.3
.
Any temporary structure constructed to support part of a permanent structure until this structure is self-supporting, shall be designed, constructed, supported and braced to withstand all loads which might be applied.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.2.3
;
O.C. 329-94, s. 29
.
3.3.4
.
No change which might affect the structure of a building shall be undertaken before ensuring that the constituent elements will not be submitted to stresses higher than those prescribed.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.2.4
;
O.C. 329-94, s. 29
.
3.3.5
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.2.5
;
O.C. 1959-86, s. 16
;
O.C. 329-94, s. 29
;
O.C. 119-2008, s. 4
.
§
3.4
. —
Fire protection
3.4.1
.
Fire hoses equipped with nozzles, portable fire extinguishers, automatic sprinkler valves, hydrants and all fire fighting equipment shall be:
(
a
)
certified;
(
b
)
easily accessible;
(
c
)
located at suitably marked stations;
(
d
)
protected from mechanical damage;
(
e
)
maintained in good operating condition;
(
f
)
protected from freezing; and
(
g
)
accessible to firemen at all times.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.1
;
O.C. 329-94, s. 30
.
3.4.2
.
Where a standpipe system with valves equipped with hoses and nozzles, an automatic water extinguisher system or a combined system is installed in a building, a standpipe system with valves equipped with hoses and nozzles shall be installed progressively within 2 stories of the highest storey under construction.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.2
;
O.C. 53-90, s. 7
.
3.4.3
.
Portable fire extinguishers:
Portable fire extinguishers shall be placed:
(
a
)
in any workshop;
(
b
)
in any storage building for combustible materials or flammable liquids;
(
c
)
in places where welding or cutting operations with a torch are being carried on and for a reasonable time thereafter;
(
d
)
where temporary oil or gas-fired heat generators are used;
(
e
)
during the use of a tar or asphalt kettle;
(
f
)
during the storage or handling of flammable liquids; and
(
g
)
near the exits on each storey having a floor area of 500 m
2
or less in a building where construction works are in progress, and an additional portable fire extinguisher for each additional 500 m
2
of floor area or any fraction thereof.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.3
;
O.C. 329-94, s. 31
.
3.4.4
.
In addition to the standards prescribed in section 3.4.1, portable fire extinguishers shall:
(
1
)
be of type ABC approved by Underwriters’ Laboratories of Canada (ULC);
(
2
)
be loaded;
(
3
)
comply with:
(
a
)
NFPA Standard 10-1975 Portable Fire Extinguishers, where the extinguishers are manufactured before 1 January 1989; or
(
b
)
NFPA Standard 10-1988 Portable Fire Extinguishers, where the extinguishers are manufactured on or after 1 January 1989;
(
4
)
bear the name of the person responsible for their maintenance and indicate the date of the most recent inspection;
(
5
)
be easily accessible.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.4
;
O.C. 329-94, s. 32
.
3.4.5
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.5
;
O.C. 329-94, s. 33
.
3.4.6
.
If the building is provided with a water supply system of at least 300 litres per minute under a minimum pressure of 80 kPa at the highest point, hoses equipped with nozzles may replace the portable water extinguishers. The minimum hose diameter shall be 19 mm and the nozzle shall be of the spray type with a minimum opening of 10 mm.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.4.6
.
§
3.5
. —
Ladders and step-ladders
3.5.1
.
When there are no stairways, ramps, passages or mechanical equipment designed for the hoisting of persons, ladders shall be used to gain access to a work area.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.1
;
O.C. 329-94, s. 34
.
3.5.2
.
A ladder shall:
(
a
)
be designed, built, maintained and used so as not to endanger the safety of workers;
(
b
)
always be used in such a way that the loads applied do not cause any part of the ladder to be stressed beyond allowed stresses; and
(
c
)
be suitable for the type of work to be performed, with regard to its type as well as to its length and accessories.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.2
.
3.5.3
.
Commercial ladders:
The employer shall ensure that any commercially manufactured ladder that he uses complies with CAN3-Z11-M81 Portable Ladders, except to the extent that the standard is modified by this subdivision.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.3
;
O.C. 329-94, s. 35
.
3.5.4
.
Site-fabricated ladders:
(
1
)
Any site-fabricated ladder shall have:
(
a
)
a maximum length of 4.8 m, measured along the side rails;
(
b
)
a maximum spacing of 400 mm between the side rails, unless the site where the ladder is used precludes this. In such a case, the width of the ladder may be reduced accordingly;
(
c
)
a maximum spacing of 300 mm between the cleats. Such spacing shall be uniform within a flight.
(
2
)
Any wooden ladder must have:
(
a
)
2 side rails of at least:
i
.
38 mm × 89 mm for single ladders; or
ii
.
38 mm × 140 mm or 89 mm × 89 mm for double-width ladders;
(
b
)
cleats:
i
.
of not less than 38 mm × 89 mm; and
ii
.
resting on filler blocks of not less than 38 mm × 38 mm.
(
3
)
Any double-width ladder shall:
(
a
)
have 3 rails evenly spaced;
(
b
)
be at least 1.5 m in width and not more than 2 m in width;
(
c
)
have cleats in one piece that extend the full width of the ladder;
(
d
)
be made of materials whose size is corresponding to those listed in subsections 1 and 2; and
(
e
)
be solidly fastened in place.
(
4
)
The wood used for a ladder shall fulfil the following conditions:
(
a
)
it shall be in good condition, shall be derived from species having long non-breaking fibres and shall be free from any defect that might impair its strength;
(
b
)
it shall be of a quality equal to No. 1 spruce;
(
c
)
if it is in the form of logs, it shall be debarked;
(
d
)
it shall not be covered with paint or any opaque coating.
(
5
)
Where it is foreseen that a site-fabricated ladder will exceed the permitted maximum length of 4.8 m, the ladder must be designed by an engineer, as attested to by a plan or certificate signed and sealed by the engineer.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.4
;
O.C. 329-94, s. 36
;
O.C. 606-2014, s. 10
.
3.5.5
.
The maximum length of an extension ladder having 2 or more sections shall be 15 m, measured along the side rails.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.5
;
O.C. 329-94, s. 37
.
3.5.6
.
Ladder utilization:
Any ladder shall:
(
a
)
rest on a firm footing and the top shall be propped on its 2-side rails;
(
b
)
be firmly held in place by one or more persons if it is not permanently fastened and if its length is equal to or superior to 9 m;
(
c
)
be protected against any jolt or sliding which might upset it;
(
d
)
when not permanently fastened, be so inclined, in compliance with Schedule 0.1, that the horizontal distance between the base of the ladder and the vertical plane of its top support is approximately between 1/4 and 1/3 of the length of the ladder between its supports;
(
e
)
if used as a means of access:
i
.
be securely fastened in place;
ii
.
extend at least 900 mm above the upper landing; and
iii
.
have a minimum clear space of 150 mm below any rung;
(
f
)
be so placed that there is adequate free space at the bottom of the ladder;
(
g
)
(paragraph revoked);
(
h
)
not be lashed to another ladder end to end;
(
i
)
if installed in a continuous vertical position, except ladders permanently installed with hoop protection:
i
.
have rest platforms with handrails, at intervals not greater than 6 m; and
ii
.
be off-centre at each platform to ensure protection for the upper part;
(
j
)
not be used near an exposed electrical circuit when it is made of metal or is metal-reinforced;
(
k
)
be of a length sufficient to allow a person to work without having to use the top 2 rungs; and
(
l
)
be lifted and lowered by the user in such a way that he faces it.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.6
;
O.C. 329-94, s. 38
.
3.5.6.1
.
Notwithstanding section 3.6.1, a ladder may be used in an elevator shaft or hoistway to temporarily serve one of the 2 means of egrees provided for in that section, for a maximum height of 2 storeys.
In addition, the ladder may be used upon the following conditions:
(
a
)
the elevator or the hoist shall not be in the process of being installed;
(
b
)
the opening of the shaft at the level of the first landing shall be completely closed;
(
c
)
the opening of the second landing shall allow only the free passage of persons;
(
d
)
the ladder shall cover the opening of the second landing so as to prevent persons from falling;
(
e
)
the ladder shall be built as work progresses, but without adversely affecting construction work.
O.C. 329-94, s. 39
.
3.5.7
.
Step-ladder:
If the worker uses a step-ladder the employer shall make sure:
(
a
)
that it complies with CAN3-Z11-M81 Portable Ladders, except to the extent that the standard is modified by this subdivision;
(
b
)
that it is not used near an exposed electrical circuit when it is made of metal or is metal-reinforced;
(
c
)
that its legs are fully spread and that the retaining device is locked; and
(
d
)
that the top and the rest are not used as a step.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.7
;
O.C. 329-94, s. 40
.
3.5.8
.
As long as the permanent or temporary stairways are not finished or ready to be used, ladders shall be utilized and kept in good condition.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.8
.
3.5.9
.
Ladders shall:
(
a
)
be set aside until repaired, when one of their parts is broken or defective;
(
b
)
not be repaired by using splice-pieces or binding; and
(
c
)
be stored away and protected against bad weather in a dry place.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.5.9
.
§
3.6
. —
Stairs
3.6.1
.
Any building under construction shall be provided with 2 means of egress by means of permanent or temporary stairs which shall:
(
a
)
be built for the entire height from the ground or underground to the working level as soon as the work has attained a height of 2 storeys or 6 m above ground;
(
b
)
be extended as work progresses without adversely affecting construction work;
(
c
)
never be extended at less than 2 storeys from the upper working level; and
(
d
)
be built of steps with a depth more than 150 mm.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.6.1
.
3.6.2
.
Construction:
(
1
)
Stairs and landings shall be designed and constructed to safely support a live load of 4.8 kN/m
2
.
(
2
)
Stairs shall have:
(
a
)
uniform treads and risers in any one flight;
(
b
)
a vertical distance between landings or floors not exceeding 3.6 m;
(
c
)
an angle of rise not exceeding 50º from the horizontal; and
(
d
)
guardrails in accordance with Subdivision 3.8 and securely fastened and supported on the open sides of the stairs and landings.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.6.2
.
3.6.3
.
Steel frame stairs:
In addition to the requirements of section 3.6.2, skeleton steel stairs shall have temporary treads and landings:
(
a
)
of contiguous planking extending the full width and breadth of these elements; and
(
b
)
be securely fastened in place.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.6.3
.
3.6.4
.
Temporary stairs:
(
1
)
Outside of buildings, temporary stairs shall have:
(
a
)
steps with a width of at least 500 mm;
(
b
)
a maximum slope of 55º;
(
c
)
landings with a depth of at least 500 mm;
(
d
)
a handrail; and
(
e
)
uniform steps in the same flight.
(
2
)
Inside buildings, temporary stairs shall have a width of at least 750 mm or at least equal to that of the permanent stairs to be installed.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.6.4
.
§
3.7
. —
Temporary ramps, runways and platforms
3.7.1
.
Temporary ramps, runways and platforms, other than scaffolding platforms, shall:
(
a
)
be designed, constructed and maintained to safely support loads that may be applied to them;
(
b
)
be at least 480 mm wide;
(
c
)
be securely fastened in place;
(
d
)
have braces that tie their vertical and horizontal supports and ensure stability;
(
e
)
when they are open-worked and placed more than 1.8 m above the floor or the ground, not include openings or holes such as a sphere of 30 mm can go through;
(
f
)
have a free space of 2 m above and below, unless the danger is indicated;
(
g
)
where they include welded elements, be welded by welders having an “O” or “V” class certificate from the Canadian Welding Bureau or a Class A or B qualification certificate in pressure vessel welding issued by the Minister of Employment and Social Solidarity;
(
h
)
bear a plate giving their rated load, maximum weight (including rated load), name of the manufacturer, date of manufacture, reference to plans submitted and in the case of a ramp, a runway or a platform made after 24 January 1987, identification of the welder;
(
i
)
have guard-rails complying with Subdivision 3.8.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.7.1
;
O.C. 1959-86, s. 17
;
O.C. 35-2001, s. 12
;
O.C. 606-2014, s. 11
.
3.7.2
.
Ramp:
(
1
)
Any ramp shall:
(
a
)
have a slope not exceeding 300 mm of vertical rise to each 900 mm of horizontal run; and
(
b
)
have cross cleats if the slope exceeds 300 mm of vertical rise to each 2.4 m of horizontal run. These cleats shall:
i
.
be spaced at regular intervals not exceeding 450 mm; and
ii
.
measure at least 25 mm × 50 mm, nominal measurements.
(
2
)
The requirements of subsection 1 do not apply to a ramp which is installed in the stairwell of a building 2 storeys or less, inasmuch as the ramp:
(
a
)
has a slope not exceeding 45º; and
(
b
)
has cleats measuring 50 mm × 50 mm, nominal measurements, spaced at regular intervals not exceeding 300 mm.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.7.2
.
3.7.3
.
Platforms and other similar structures hooked to concrete forms shall be designed, constructed and installed with respect to the work to be performed and the hazards involved. These structures shall:
(
a
)
be supported on solid foundations;
(
b
)
be securely anchored at the rest point; and
(
c
)
never be overloaded.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.7.3
.
§
3.8
. —
Guardrails
3.8.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.8.1
;
O.C. 995-91, s. 8
;
O.C. 1413-98, s. 15
;
O.C. 35-2001, s. 13
.
3.8.2
.
Resistance:
(
1
)
A guardrail shall be designed to:
(
a
)
resist a concentrated horizontal force of 900 N applied to any point of the top plate; and
(
b
)
resist a concentrated vertical force of 450 N applied to any point of the top plate.
(
2
)
Where there is a concentration of workers, as well as other areas where a guardrail may be submitted to unusual pressures, the guardrail shall be reinforced accordingly.
(
3
)
Where equipment or materials may fall from one work level to another, precautions shall be taken to avoid this, unless there is a guardrail strengthened for this purpose.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.8.2
.
3.8.3
.
Construction:
(
1
)
Any guardrail shall be between 1 m and 1.2 m above the surface on which the worker is working.
(
2
)
A wooden guardrail shall consist of:
(
a
)
top plate not less than 40 mm thick by 90 mm wide, supported on posts of the same dimension spaced at intervals of not more than 1.8 m and placed so that the 90 mm width of the post is on the axis of the width of the top plate;
(
b
)
an intermediate rail not less than 75 mm wide at midway and securely fastened to the inner side of the posts; and
(
c
)
a toe-board at least 90 mm high and securely fastened to the inner side of the posts.
(
3
)
A guardrail of steel wire ropes shall be maintained rigid by means of a turn-buckle and consist of:
(
a
)
a wire rope at least 10 mm in diameter for the top-rail and the intermediate rail;
(
b
)
steel posts spaced at intervals of not more that 3 m; and
(
c
)
a toe-board of at least 90 mm high and securely fastened to the inner side of the posts.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.8.3
;
O.C. 329-94, s. 42
.
3.8.4
.
Metal guardrails:
Metal guardrails shall be designed, constructed, installed and maintained in such a way as to offer a resistance and a safety equal or superior to that required for wooden guardrails.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.8.4
.
3.8.5
.
When wire mesh is required on a guardrail, it shall:
(
a
)
be of gauge No. 16 or larger;
(
b
)
have mesh of 40 mm or less;
(
c
)
fill all the area between the toe-board and the top-rail; and
(
d
)
be installed on the inside of the intermediate rail.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.8.5
.
§
3.9
. —
Scaffoldings
3.9.1
.
Generality:
Scaffoldings constructed in accordance with this subdivision shall be required in places where workers cannot carry out their work safely from the ground or from a solid construction. However, ladders may be used for work requiring less than one hour.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.1
.
3.9.2
.
Construction:
Scaffoldings shall:
(
a
)
be designed, constructed, braced, windbraced and maintained in order to support the loads and stresses to which they are subjected and be wind resistant; and
(
b
)
rest on the ground or on foundations which offer sufficient resistance.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.2
.
3.9.3
.
Materials:
(
1
)
Materials used for scaffolding shall be free from any defects which might impair their resistance.
(
2
)
The lumber used for scaffolding shall be:
(
a
)
in good condition, composed of long non-breaking fibres and free from any defect which might impair its strength;
(
b
)
of a quality equivalent to No. 1 spruce;
(
c
)
barked, if it is rough timber; and
(
d
)
without paint or any opaque coating.
(
3
)
The metal parts of a scaffolding shall:
(
a
)
not be weakened by rust, nor by any corrosive material; and
(
b
)
if tubular elements are used, not be weakened by the effects of cold or heat.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.3
;
O.C. 53-90, s. 8
;
O.C. 329-94, s. 43
.
3.9.4
.
Erection and dismantling:
(
1
)
The erection and dismantling of scaffoldings shall be performed under the supervision and control of a qualified person.
(
2
)
All parts of a scaffolding shall be inspected by a qualified person before its erection.
(
3
)
During erecting and dismantling operations, all safety measures shall be taken to prevent objects from falling.
(
4
)
Tools appropriate to the type of scaffolding shall be placed at the disposal of the workers.
(
5
)
In order to protect workers against falls when they erect or dismantle scaffolding, one or several measures provided for in subparagraphs 1 to 4 of the second paragraph of section 2.9.1 shall be taken.
(
6
)
During the erection or dismantling of scaffolding, any other work shall:
(
a
)
be performed on only those sections which conform to this Code; and
(
b
)
not be performed under the sections being used, unless an overhead protection for workers is provided to catch objects which fall from a higher level.
(
7
)
During its erection or dismantling, no scaffolding shall be left in such a state that it may create a hazard.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.4
;
O.C. 35-2001, s. 14
.
3.9.5
.
Uprights:
(
1
)
Scaffolding uprights shall rest on the ground or on foundations capable of supporting the maximum load without excessive settlement or deformation.
(
1.1
)
When scaffolding uprights rest on uneven ground, a safe and efficient means, such as screw jacks, must be used to ensure the plumbness of the scaffolding.
The use of construction waste material to fill the unevenness in the ground is prohibited.
(
2
)
The inner row of uprights shall be erected as close as possible to the building or structure.
(
3
)
The wooden uprights shall:
(
a
)
be fastened to the ground or foundation in such a way as to avoid any displacement of the base;
(
b
)
be vertical; and
(
c
)
not be cracked at the foot.
(
4
)
Should the uprights be spliced, they shall be fitted together in such a way that the spliced portion be at least as resistant as the portion which is directly beneath it.
(
5
)
When 2 stationary scaffoldings, resting on the ground, meet at the angle of a building or structure, an upright shall be placed at the intersection of the extended exterior longitudinal girders.
(
6
)
The parts making up the uprights shall be linked up in such a way that no torque or stress capable of causing buckling can come about.
(
7
)
The distance between 2 juncture points of a structure likely to buckle shall not be longer than:
(
a
)
30 times the smallest dimension of the wooden member involved; or
(
b
)
70 times the diameter of the tubular member involved.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.5
;
O.C. 119-2008, s. 5
.
3.9.6
.
Stringers:
(
1
)
Two stringers located at the same level can only be joined at right angles with an upright.
(
2
)
Any stringer shall be in a horizontal position.
(
3
)
Any stringer shall be sufficiently long to be sustained by at least 3 uprights.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.6
.
3.9.7
.
Putlogs:
Putlogs supporting the platform shall:
(
a
)
be fixed in a greater vertical dimension;
(
b
)
be sufficiently long so they extend at least 75 mm beyond the braces of the inside and outside rows of uprights; and
(
c
)
be attached to the main structure by one end if they have a single row of uprights. They shall be embedded at least 100 mm in the masonry.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.7
;
640-2019
O.C. 640-2019
,
s.
3
1
.
3.9.8
.
Platforms: The components of the platforms shall be laid in such a way as to prevent any toppling or sliding. In addition, scaffolding platforms shall:
(
1
)
have a uniform surface between two fulcrum points;
(
2
)
have a minimum free width of 470 mm;
(
3
)
if made of lumber, be constructed of planking:
(
a
)
stamped by a body certified by the Canadian Lumber Standards Association as being of quality equivalent to No. 1 spruce;
(
b
)
measuring at least 50 mm × 250 mm;
(
c
)
long enough to extend at least 150 mm but not more than 300 mm beyond the end supports; if they are fixed end to end, their extremities shall rest on individual fulcrum points;
(
d
)
laid in such a way as the span between 2 fulcrum points does not exceed:
i
.
3.0 m if they are tested and stamped in accordance with Division 11 of CAN/CSA Standard S269.2-M87 Access Scaffolding for Construction Purposes;
ii
.
2.1 m in any other case;
(
e
)
whose deflection in the middle of the span does not exceed L/80 where L is the distance between 2 fulcrum points;
(
4
)
if made of manufactured products, be:
(
a
)
built in accordance with CAN/CSA Standard S269.2-M87 Access Scaffolding for Construction Purposes;
(
b
)
worked so as to avoid slipping;
(
c
)
maintained to avoid corrosion and deterioration;
(
5
)
before each use, be visually inspected in order to detect any alteration that may affect its solidity;
(
6
)
have a slope of less than 1:5 (11º from the horizontal plane); and
(
7
)
be located less than 350 mm from a wall or other platform if there is no guardrail.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.8
;
O.C. 53-90, s. 9
;
O.C. 329-94, s. 44
;
O.C. 35-2001, s. 15
;
O.C. 119-2008, s. 6
;
820-2023
O.C. 820-2023
,
s.
2
1
.
3.9.9
.
Scaffolding assemblies:
Scaffolding assemblies shall be performed in the following manner:
(
a
)
if nails are used, they shall:
i
.
be of a length and size appropriate to the thickness of the assembled pieces;
ii
.
be sufficiently numerous in relation to the weight being supported;
iii
.
not be subject to a drawing effect;
iv
.
be completely driven in, except for double-headed nails in which case the first head shall be completely driven in;
v
.
have their points flattened should they extend beyond the exterior surface of the last piece assembled; and
vi
.
be pulled out of any dismantled wood;
(
b
)
when nuts are used, wrenches shall be:
i
.
the appropriate size, to avoid sliding on the head of the nut;
ii
.
such that while tightening, the elasticity limit of the metal with which the nut is made is not exceeded; and
iii
.
equipped with a strap to enable the workmen to suspend them from his wrist or belt;
(
c
)
when devices such as clamps or metallic points are utilized, these devices shall:
i
.
be specially designed for this purpose; and
ii
.
be so fixed as not to slip under the pressure brought to bear upon them.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.9
.
3.9.10
.
Mooring:
(
1
)
Scaffoldings whose height is greater than 3 times the shortest side dimension of their base shall be firmly anchored to a building or structure by means of anchors, or to the ground by means of guys.
(
2
)
The building or structure to which the scaffolding is anchored shall resist to the load induced by scaffolding and anchors.
The anchors shall
(
a
)
resist to traction and compression side loads applied to the scaffolding. The loads must be equal to 225 N/m of platform length without being less than 1,0000 N;
(
b
)
be installed
i
.
in accordance with the recommendations of the scaffolding’s manufacturer; or
ii
.
on the vertical, at intervals not exceeding 3 times the smallest side dimension of the scaffolding and, on the horizontal, at least every 2 uprights;
(
c
)
be uniformly distributed in a staggered arrangement if possible.
In addition to those requirements, when a safety tarpaulin or net is installed on a scaffolding, the number and type of anchors shall comply with an engineer’s plan or with the manufacturer’s recommendations or, in the case of scaffoldings less than 18 m in height, shall comply with those provided for in tables 1 and 2 of Schedule 0.2, depending on whether it is a tarpaulin or net and on the region where the scaffolding is installed.
(
3
)
Scaffolding anchored to the ground by means of guys shall be installed in accordance with the recommendations of the scaffolding’s manufacturer or with the plans for the installation of the scaffolding.
(
4
)
This section does not apply to a suspended scaffolding, a boatswain’s chair, a ladder jack scaffolding, a suspended scaffolding used by bricklayers or a mast-climbing work platform referred to in sections 3.9.22 to 3.9.25.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.10
;
640-2019
O.C. 640-2019
,
s.
4
1
.
3.9.11
.
Means of access:
Scaffoldings more than 1.5 m from the ground, or from any other fixed support, shall have means of access, safe and clear of any obstruction, with:
(
a
)
landings at every 6 m; and
(
b
)
a stair for scaffoldings 18 m in height or over.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.11
.
3.9.12
.
Inspection:
Scaffoldings shall be inspected by a qualified person:
(
a
)
at least once every 3 months;
(
b
)
following any failure of the material;
(
c
)
after any abnormal pressure or any incident which might have adversely affected the structure; and
(
d
)
when re-used after any lengthy work interruption.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.12
.
3.9.13
.
Hoisting cables for scaffoldings:
(
1
)
Any hoisting cable for scaffoldings shall:
(
a
)
be designed for this use and of the appropriate diameter. This diameter not being less than:
i
.
19 mm for fibre cables; or
ii
.
8 mm for metallic cables;
(
b
)
have a safety factor of 10;
(
c
)
be provided with the appropriate sockets when spliced into eyeholes or links. If cable terminal clamps are used, they shall be of a size appropriate to the diameter of the metallic cable and so placed that the band of the U is on the supporting end of the cable;
(
d
)
be bound at both ends to avoid unravelling of the strands;
(
e
)
be shielded from projections of the building;
(
f
)
be adequately protected when corrosive substances are used nearby;
(
g
)
be kept in a cool and dry place protected against chemical or corrosive vapours;
(
h
)
if used with a hoisting apparatus having a friction drum, be long enough to reach the ground or be prevented from coming out of the hoisting apparatus by twisting the free end around an eyelet and fixing it by means of a cable clamp.
This last method must be used for any work above a body of water or watercourse; and
(
i
)
if used with a hoisting apparatus having a winding drum, be fixed to the drum with a fastener having a minimum resistance of 80% of the breaking point of the hoisting cable.
(
2
)
Any fibre cable:
(
a
)
shall not be used in any of the following cases:
i
.
when the suspension points are more than 30 m above ground;
ii
.
on winch drums;
iii
.
near corrosive or chemical substances unless it has been appropriately treated;
(
b
)
shall not drag on rough surfaces;
(
c
)
shall be kept in good condition by:
i
.
drying it out; and
ii
.
protecting it from frost; and
(
d
)
shall be replaced after 2 years of services or before, if the cable is frayed and if the strands are discoloured or blackened and are beginning to crumble by producing a whitish dust.
(
3
)
Synthetic fibre cable may be used in place of fibre cable if the same standards are fulfilled and if it has an equivalent strength.
(
4
)
Any metallic cable shall:
(
a
)
comply with the rules of the Hoisting and Rigging Safety Manual of the Construction Safety Association of Ontario, translated by the Commission des normes, de l’équité, de la santé et de la sécurité du travail and published by Les Publications du Québec;
(
b
)
be made of a minimum of 6 strands of 19 wires;
(
c
)
have a hemp core or an equivalent flexible core if the cable is wound around the hoisting drum in a single layer, or a steel core in other cases; and
(
d
)
be maintained in good condition by:
i
.
following all the manufacturer’s instructions;
ii
.
handling it in such a manner as to avoid any kink;
iii
.
frequently applying an appropriate lubricant which will help keep it flexible and protect it from rust; and
iv
.
using it only on pulleys or drums which are smooth and without any ragged edges.
(
5
)
Unless a test shows that nowhere along the cable has the breaking point been lowered to less than 90% of the original point, the hoisting cable shall be replaced if:
(
a
)
4% of the total number of wires in the cable are broken in one strand through the cable pitch, approximately 6 1/2 times the diameter of the cable, when used on a winding drum, or 2% on a friction drum;
(
b
)
the original diameter, measured on an unstretched cable, has been reduced by:
i
.
0.8 mm for cables of 8 mm to 15 mm in diameter; or
ii
.
1.2 mm for cables of 15 mm to 25 mm in diameter;
(
c
)
the exterior wires present a worn aspect covering more than 50% of their diameter;
(
d
)
corrosion is more than superficial.
(
6
)
Any hoisting cable, when being used on an apparatus, shall not be left lying on the ground, but kept in a receptacle.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.13
;
O.C. 329-94, s. 45
;
O.C. 393-2011, s. 10
;
O.C. 513-2015, s. 4
.
3.9.14
.
Utilization:
(
1
)
The employer shall see that no one works on a scaffolding:
(
a
)
which does not conform to this Code;
(
b
)
during a storm or a high wind period; or
(
c
)
when the platform is covered with ice, snow or sleet, unless the said surface has been covered with an anti-slip substance.
(
2
)
Workmen shall not work on scaffoldings with different levels, unless protection has been provided over those working below in order to stop tools or other objects which may fall from a higher level.
(
3
)
A hoisting apparatus forming part of the installation shall be installed and operated according to the manufacturer’s instructions.
(
4
)
In assembling metal scaffolding, it is prohibited to use any piece that has been reformed or straightened in such a way that its strength is diminished.
(
5
)
No vehicle or equipment which can be moved and on which a scaffolding is installed or erected, may be moved when a worker is on the scaffolding.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.14
;
O.C. 1959-86, s. 18
;
O.C. 329-94, s. 46
.
3.9.15
.
Outrigger scaffolding:
The outrigger beams for an outrigger scaffolding shall:
(
a
)
have their inboard portion from fulcrum point to point of anchorage not less than 1.5 times the length of the outboard portion;
(
b
)
be supported on the solid parts of the construction;
(
c
)
be securely anchored at the fulcrum point and well braced against upsetting;
(
d
)
be securely anchored at the inboard end in order to prevent any vertical or horizontal movement; and
(
e
)
be inspected before each use.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.15
.
3.9.16
.
Suspended scaffolding:
(
1
)
Any suspended scaffolding shall:
(
a
)
be off-limits to persons under age 18;
(
b
)
at the working level, be firmly and appropriately attached to the structure if the guardrail installed on the structure side is to be removed;
(
c
)
not be attached to another scaffolding or to the structure by a bridge; and
(
d
)
be used with a safety harness secured by a fall arrest connecting device to an anchorage system, the whole in accordance with sections 2.10.12 and 2.10.15. However, when the suspended scaffolding is hung from 4 hoisting cables, the anchorage system may be installed on the platform. Where a rope grab fastened to a vertical life line is used, it must be a Class ADP rope grab.
(
2
)
A mechanically operated suspended scaffolding shall conform to CAN3-Z271-M84 Safety Code for Suspended Powered Platforms.
(
3
)
A manually operated suspended scaffolding shall also conform to the standard mentioned in subsection 2, with he necessary modifications.
The winch of the scaffolding shall be fitted with at least 2 independent braking devices, including one automatic brake, that shall serve only for that purpose.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.16
;
O.C. 807-92, s. 4
;
O.C. 606-2014, s. 12
.
3.9.17
.
Boatswain’s chair:
(
1
)
Any boatswain’s chair shall:
(
a
)
be prohibited to persons under 18 years of age;
(
b
)
be built of material able to support 115 kg with a safety factor of 4;
(
c
)
be not less than 600 mm wide and 250 mm deep;
(
d
)
be suspended from a hoisting ring by a metallic structure or by means of slings at the 4 corners and crossing beneath the seat; and
(
e
)
be equipped with:
i
.
retaining devices preventing any swaying;
ii
.
stirrups so as to avoid numbness of the legs;
iii
.
(subparagraph revoked);
iv
.
a back; and
v
.
reinforcement blocks at each corner which extend at least 230 mm beyond the front of the chair.
(
2
)
The boatswain’s chair shall conform to CAN3-Z271-M84 Safety Code for Suspended Powered Platforms, with the necessary modifications.
(
3
)
Where the boatswain’s chair is moved by means of a manually operated winch, that winch must be equipped with at least 2 independent braking devices, including an automatic brake, that shall serve only for that purpose.
(
4
)
A worker in a boatswain’s chair must wear a safety harness secured by a fall arrest connecting device to an anchorage system, the whole in accordance with sections 2.10.12 and 2.10.15. Where a rope grab fastened to a vertical life line is used, it must be a Class ADP rope grab.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.17
;
O.C. 807-92, s. 5
;
O.C. 35-2001, s. 16
;
O.C. 606-2014, s. 13
.
3.9.18
.
The use of a ladder jack scaffolding shall be prohibited.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.18
;
O.C. 329-94, s. 47
;
483-2021
O.C. 483-2021
,
s.
4
1
.
3.9.19
.
Mobile scaffolding:
Any mobile scaffolding shall:
(
a
)
be equipped with a braking device which prevents the scaffolding from moving;
(
b
)
have the brakes applied when it is being used;
(
c
)
be rigid and stable; and
(
d
)
not be moved when a workman is on it, unless:
i
.
he is advised of the move;
ii
.
the smallest dimension of the base of the scaffolding is at least equal to 1/3 its height.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.19
.
3.9.20
.
Metal scaffolding:
(
1
)
The use of a metal scaffolding shall conform to the instructions of the manufacturer.
(
2
)
The tubes or runners shall be assembled in such a way that when they are taken down, whatever remains of the scaffolding will not constitute a hazard.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.20
.
3.9.21
.
Suspended scaffolding used by bricklayers:
Any suspended scaffolding for the use of bricklayers shall:
(
a
)
be attached to an outrigger beam capable of withstanding at least 4 times the maximum utilization load without exceeding the allowable stress of the materials used. This outrigger beam shall, in addition to be conform to section 3.9.15, be solidly fixed in one of the following ways:
i
.
by an anchorage to the concrete slab on which it rests;
ii
.
between 2 concrete slabs, by beams or columns braced perpendicular to the vertical and horizontal planes;
iii
.
to the beams of the metal framework;
(
b
)
in addition to conforming to paragraphs
a
and
c
of subsection 1 of section 3.9.16, have a wooden guardrail as specified in Subdivision 3.8;
(
c
)
include hoisting apparatus:
i
.
in sufficient number and assembled so that the safety factor of the cables is always more than 10;
ii
.
attached 2 by 2 to the same outrigger beam; and
iii
.
equipped with a double safety device which continually locks the winch against any reverse motion and with cables which conform to section 3.9.13;
(
d
)
include a platform:
i
.
in conformity with section 3.9.8;
ii
.
made of pieces of wood 50 mm × 250 mm bolted at each end on a putlog;
iii
.
equipped with steel putlogs whose circular ends are 25 mm in diameter and 50 mm in length and perforated 15 mm at the outside edge for a 10 mm pin; and
(
e
)
assembled so that an end of one span is never more than 200 mm higher than the other.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.21
;
O.C. 1413-98, s. 16
.
3.9.22
.
Mast-climbing work platform:
Every mast-climbing work platform shall:
(
1
)
be designed in conformity with the plans of an engineer; a copy of the plans must be available on request;
(
2
)
be equipped with a plate on each hoisting system clearly stating the maximum load allowed on the platform;
(
3
)
be equipped with bearers resting on base plates or mudsills, as shown on the engineer’s plans or in the manufacturer’s manual;
(
4
)
have a distance between masts in conformity with the engineer’s plans;
(
5
)
have the sections of each mast linked together using the means specified in the engineer’s plans or in the manufacturer’s manual;
(
6
)
have masts whose plumbness complies with the lesser of the following measures: the gap between a plumb line and any point lower than
(
a
)
the engineer’s plans or the manufacturer’s manual; or
(
b
)
12 mm for 3 m in height, 19 mm for 6 m in height or 38 mm for the total height of the scaffolding;
(
7
)
be loaded in conformity with the engineer’s plans or the manufacturer’s manual which must identify the loading zones;
(
8
)
have masts anchored at the height and using an anchoring system in conformity with the engineer’s plans or the manufacturer’s manual;
(
9
)
be equipped with an anchoring system designed for that purpose in conformity with the engineer’s plans or the manufacturer’s manual when safety tarpaulins are installed; and
(
10
)
be used by workers trained to
(
a
)
identify and prevent the hazards associated with the erection, dismantling and use of the scaffolding; and
(
b
)
work on the platform safely.
O.C. 119-2008, s. 7
.
3.9.23
.
Pump jack scaffold:
In addition to the standards prescribed in section 3.9.22, every pump jack scaffold shall:
(
1
)
be designed to support, in addition to the dead weight, 3 times the maximum load allowed without damage to any of its components;
(
2
)
be used by not more than 2 workers at the same time between 2 masts;
(
3
)
have masts made out of a material other than wood;
(
4
)
be equipped with jacks designed to prevent any accidental slippage of the platform alongside the masts; and
(
5
)
when the work platform passes in front of an intermediate anchoring point, be equipped with a new anchor installed one and a half metres under the platform, before removing the intermediate anchoring.
O.C. 119-2008, s. 7
.
3.9.24
.
Winch scaffolding:
In addition to the standards prescribed in section 3.9.22, every winch scaffolding shall:
(
1
)
be designed and manufactured in compliance with ANSI/SIA Standard A 92.9-1993 Mast-Climbing Work Platforms;
(
2
)
when climbing, have bracing affixed under the work platform before the above bracing is removed;
(
3
)
be equipped with an arresting device to stop and support the platform in case of overspeed; the device must be designed to stop the work platform with twice the maximum load allowed by limiting the height of the fall to 300 mm, without any break in the components under stress;
(
4
)
in addition to the instructions of the manufacturer, be inspected in compliance with the following minimum conditions:
(
a
)
before each use in compliance with section 7.4.3 of ANSI/SIA Standard A 92.9-1993 Mast-Climbing Work Platforms by a qualified person; and
(
b
)
quarterly by a qualified mechanic;
(
5
)
undergo every year a visual examination of its welds by a welding inspector holding a certificate issued by the Canadian Welding Bureau or a welding supervisor in the employ of a company certified in compliance with the requirements of CSA Standard W47.1 Certification of Companies for Fusion Welding of Steel; and
(
6
)
undergo every 5 years a non-destructive examination of the bearing parts by an organization certified by the Canadian Welding Bureau in compliance with the requirements of CSA Standard W178.1 Certification of Welding Inspection Organizations.
O.C. 119-2008, s. 7
.
3.9.25
.
Motorized scaffolding:
In addition to the standards prescribed in section 3.9.22, every motorized scaffolding manufactured after 13 March 2008 shall:
(
1
)
be designed and manufactured in compliance with ISO Standard 16369 - Mast-Climbing Work Platforms, or CSA Standard B354.9, Design, calculations, safety requirements, and test methods for mast climbing work platforms (MCWPs) applicable at the time of the manufacture;
(
2
)
have the sides of the work platform next to a mast protected over a height of at least 2 m to prevent access to the mast when the speed of the work platform exceeds 2.5 m per minute;
(
3
)
be equipped with a device preventing the fall of the work platform in case of malfunction of the hoisting system;
(
4
)
have at least one plate on which the following particulars appear in French:
(
a
)
the name of the manufacturer;
(
b
)
the date of manufacture;
(
c
)
the climbing speed;
(
d
)
the self-bearing height;
(
e
)
the electric power supply; and
(
f
)
the load table;
(
5
)
in addition to the manufacturer’s instructions, be inspected in compliance with the terms and conditions of CSA Standard B354.10/B354.11, Safe use and best practices for mast climbing work platforms (MCWPs)/Training for mast climbing work platforms (MCWPs), and according to the following frequencies:
(
a
)
before each use; and
(
b
)
every 6 months or every 120 hours of use, whichever comes first, by a qualified mechanic;
(
6
)
undergo every year a visual examination of its welds by a person holding for at least 5 years a certificate issued by the Canadian Welding Bureau or a welding supervisor in the employ of a company certified in compliance with the requirements of CSA Standard W47.1 Certification of Companies for Fusion Welding of Steel.
A document confirming the examination shall be kept. The document shall contain the name and signature of the examiner and the date of the examination.
Where an examination reveals an anomaly or a sign of wear, the examination provided for in subparagraph 7 shall be performed before the motorized scaffolding may be again used.
(
7
)
Undergo, within 10 years after the date of manufacturing, and, then, every 5 years, a non-destructive examination of the load-bearing parts, specified by the manufacturer, in compliance with the requirements of CSA Standard W178.1 Certification of Welding Inspection Organizations.
The structure shall also be analyzed using ultrasound.
A document confirming the examination and analysis shall be kept. The document shall contain the name and signature of the examiner and the date of the examination.
In addition, a complete instruction manual for every motorized scaffolding, written in French, must be at the disposal of users to ensure the scaffolding is used safely.
O.C. 119-2008, s. 7
;
483-2021
O.C. 483-2021
,
s.
5
1
1
.
3.9.26
.
Bracket scaffolding:
Every bracket scaffolding must:
(
1
)
be designed in conformity with plans signed and sealed by an engineer; a copy of the plans must be available on request; and
(
2
)
undergo every 5 years a non-destructive examination, other than a visual examination, of its welds by an organization certified by the Canadian Welding Bureau in compliance with the requirements of CSA Standard W178.1 Certification of Welding Inspection Organizations.
O.C. 606-2014, s. 14
.
§
3.10
. —
Construction equipment
3.10.1
.
Any vehicle, crane, or apparatus used on a construction site shall:
(
a
)
be maintained so that its use shall not compromise the safety of workers;
(
b
)
if driven by a source of energy other than manual, be inspected by a competent person before being used for the first time on the site and, afterwards, on a daily basis, whenever it is used;
(
c
)
be easily and safely accessible by means of either a ladder or steps with handrails;
(
d
)
have the motors stopped when refuelling;
(
e
)
not be used if weather conditions could render its use hazardous or during repairs or maintenance or when refuelling;
(
f
)
provide a safety equal to the original safety following any repair or changing of parts;
(
g
)
be used according to the manufacturer’s instructions; and
(
h
)
not be modified without an engineer’s signed and sealed authorization specifying that such modification provides a safety equivalent to that provided by the apparatus when new.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.1
.
3.10.2
.
Self-propelled vehicles:
(
1
)
Any self-propelled vehicle shall be:
(
a
)
provided with efficient brakes; and
(
b
)
provided with horns that shall be used when approaching pedestrians, doors, curves and hazardous areas. This requirement does not apply to crawler type dozers, to skidders or to all-terrain vehicles.
(
2
)
The operators of self-propelled vehicles shall be protected against falling objects or material by means of canopies, protective screens, cabs, or structures. That requirement does not apply to all-terrain vehicles.
(
3
)
Self-propelled vehicles equipped with a winch at the back to haul materials shall have a protective screen between the winch and the operator.
(
4
)
Persons other than the operator are prohibited from boarding self-propelled vehicles, unless these vehicles are equipped with seats and accessories for their protection.
(
5
)
(Subsection revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.2
;
O.C. 1959-86, s. 19
;
O.C. 807-92, s. 6
.
3.10.2.1
.
All-terrain vehicles
The use of all-terrain vehicles on a construction site is permitted only under the following conditions:
(
a
)
the vehicle is mounted on at least 4 wheels;
(
b
)
it is equipped with a portable fire extinguisher complying with section 3.4.4 of this Code;
(
c
)
it is equipped with a yellow flag at least 0.05 m
2
in area placed at least 1.5 m off the ground;
(
d
)
the driver of the vehicle has the skill and knowledge required to safety use the vehicle as well as the extinguisher with which it is equipped;
(
e
)
the driver shall wear the following pieces of individual protective equipment:
i
.
a motorcycle or snowmobile protective helmet conforming to the Protective Helmets Regulation (chapter C-24.2, r. 6);
ii
.
safety glasses or a face shield that comply with the latest version of CAN/CSA Standard Z94.3 Eye and Face Protectors, within 24 months following its last update, or a visor designed to be attached to a protective helmet;
iii
.
flexible leather gloves or gloves made of a material that ensures a snug fit at the wrists and a good grip on the vehicle’s controls.
It is prohibited to install a winch on an all-terrain vehicle.
In this section, “all-terrain vehicle” means a pleasure vehicle designed for driving elsewhere than on public highways and having a net mass not exceeding 450 kg.
O.C. 807-92, s. 7
;
O.C. 329-94, s. 49
;
O.C. 393-2011, s. 11
.
3.10.3
.
Heavy equipment:
(
1
)
The heavy equipment referred to in subparagraph
a
or
b
must have a rollover protective structure that complies with the standards referred to in those subparagraphs:
(
a
)
Bulldozer, loader and skidder on wheels or caterpillars, grader, scraper and roller: ISO 3471 Earth-Moving Machinery - Roll-Over Protective Structures - Laboratory Tests and Performance Requirements, applicable at the time of manufacture of the equipment;
(
b
)
Agricultural and industrial tractor with engine power greater than 15 kW: SAE J1194 Rollover Protective Structures (ROPS) for Wheeled Agricultural Tractors, applicable at the time of manufacture of the equipment.
(
2
)
The heavy equipment referred to in subparagraph
a
of subsection 1, with the exception of rollers, must be protected from falling objects by a protective structure that complies with ISO 3449, Earth-Moving Machinery - Falling Object Protective Structures - Laboratory Tests and Performance Requirements, applicable at the time of manufacture of the equipment.
(
3
)
(Subsection revoked).
(
4
)
A rollover protective structure shall bear a plate indicating:
(
a
)
the name of the manufacturer or his code;
(
b
)
its serial number;
(
c
)
a reference to the number of the standard used for its conception; and
(
d
)
the model and the make of the heavy equipment for which the structure has been designed.
(
5
)
The operator of a heavy equipment equipped with a protective structure, except for the grader, shall wear a safety belt when the vehicle is in motion.
(
6
)
The caterpillars of bulldozers working perpendicular to the axis of a slope shall be equipped with metal parts placed so as to prevent sliding in the axis of the slope.
(
7
)
When rollers are used on a steep slope, one shall:
(
a
)
be careful to keep to the newly laid paving;
(
b
)
be careful never to come in contact with bituminous bonding; or
(
c
)
provide for a device capable of stopping the roller in case of danger.
(
8
)
This section does not apply to a bulldozer on caterpillars equipped with a side boom and a counterweight and used for installing gas or oil pipelines.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.3
;
Decision 83-11-17, s. 6
;
O.C. 393-2011, s. 12
;
O.C. 606-2014, s. 15
.
3.10.3.1
.
A loader manufactured after 23 April 1980 shall be designed and installed so that persons entering or leaving the cabin may not be struck or caught by a moving part.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.3.1
.
3.10.3.2
.
Loader used for handling purposes
Subject to section 3.10.3.3, the use of a loader to handle materials, other than earthwork materials, is allowed under the following conditions:
(
a
)
the handling of materials shall be carried out with equipment, excluding the bucket, designed by the manufacturer for the handling of materials; and
(
b
)
the handling of materials shall be carried out in accordance with a method prepared in writing by the employer and indicating that no worker may be located under the load arms, any other part of the loader equipment being used for lifting, or under the load during handling.
O.C. 1413-98, s. 17
.
3.10.3.3
.
Earth-moving machinery used for lifting purposes
The use of a hydraulic shovel, backhoe loader or loader for lifting purposes, whether or not it is modified, is allowed only for water, sewer, culvert or blasting works, if the following conditions are complied with:
(
a
)
lifting must be carried out in accordance with a work method prepared in writing by the employer, available on the work site. The method must comply with the requirements provided for in section 2.15.6 and indicate that no worker may be located under the boom, arm, load arm or bucket of the machine or under the load during lifting;
(
b
)
the hydraulic shovel, backhoe loader or loader shall also be equipped with a load hook-up device designed to avoid any accidental unhooking. The device shall be designed by the equipment manufacturer or be recommended by the manufacturer; and
(
c
)
the requirements provided for in section 2.15.1 must be complied with.
The use of a sling or a mooring rope attached to the bucket teeth to lift a load is prohibited.
O.C. 1413-98, s. 17
;
O.C. 428-2015, s. 6
.
3.10.3.3.1
.
Hydraulic shovel used for assembly on the ground during electric power line installation
The use of a hydraulic shovel on caterpillars for assembling components on the ground during the installation of an electric power line is allowed if the conditions of section 3.10.3.3 and the following conditions are complied with:
(
1
)
the shovel must be equipped with load lowering control devices on the boom and the arm that comply with the standard Earth-moving machinery – Hydraulic excavator and backhoe loader boom-lowering control device – Requirements and tests, ISO 8643, published by the International Organization for Standardization, with the necessary modifications, and visual or audible overload indicator that complies with the standard Earth-moving machinery – Safety – Part 5: Requirements for hydraulic excavators, NF EN 474-5, published by the Association française de normalisation (AFNOR);
(
2
)
a nominal load table that complies with the standard Earth-moving machinery – Hydraulic excavators – Lift capacity, ISO 10567, published by the International Organization for Standardization, must be installed so that the operator can read it;
(
3
)
hoisting must be executed on a level surface having a bearing capacity sufficient to support the equipment and the load hoisted without significant settlement;
(
4
)
the bucket of the hydraulic shovel must be removed to hoist a load.
O.C. 428-2015, s. 7
.
3.10.3.4
.
Earth-moving machinery used for installing posts
The use of a hydraulic shovel or of a backhoe loader for the installation of posts is allowed if the following conditions are complied with:
(
1
)
the lift cylinders of the boom, arm or bucket of the machine are provided with load lowering control devices that comply with one of the following standards:
(
a
)
for machinery manufactured before 5 May 2011: ISO 8643: 1988 Earth-Moving Machinery - Hydraulic Excavator and Backhoe Loader Boom-Lowering Control Device - Requirements and Tests, with the necessary modifications;
(
b
)
for machinery manufactured on or after 5 May 2011: ISO 8643 Earth-Moving Machinery - Hydraulic Excavator and Backhoe Loader Boom-Lowering Control Device - Requirements and Tests, with the necessary modifications;
(
2
)
the outriggers are provided with control devices installed in accordance with one of the standards referred to in subparagraph
a
or
b
of paragraph 1.
O.C. 1413-98, s. 17
;
O.C. 393-2011, s. 13
.
3.10.4
.
Utilization:
(
1
)
Any construction equipment shall be used by a competent operator or be under his supervision.
(
2
)
No person shall operate a vehicle on a construction site unless:
(
a
)
he holds a licence to use the vehicle on a public highway in accordance with the Highway Safety Code (chapter C-24.2); or
(
b
)
he is the holder of a document attesting to his ability to drive the vehicle off public highways.
(
3
)
Paragraph
b
of subsection 2 above does not apply to a person who is:
(
a
)
learning to use a bulldozer, crane, or other equipment; and
(
b
)
is accompanied by a qualified person.
(
4
)
Any manoeuvre shall be carried out so that no workman is exposed to a hazard. No load shall pass over the heads of workers and no worker shall stand under a load or under a part of a hoisting apparatus that could fall on him.
(
5
)
The controls of construction equipment shall not be left unattended when the following parts of the equipment are raised:
(
a
)
the bucket of a power shovel, backhoe or other excavating machine;
(
b
)
the blade of a bulldozer;
(
c
)
the load of a lift truck, crane or any other hoisting machine; or
(
d
)
the hammer of a pile-driving device.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.4
;
O.C. 1959-86, s. 20
;
O.C. 35-2001, s. 17
.
3.10.5
.
Workers acting as signal persons:
(
1
)
(subsection revoked);
(
2
)
If the operator of a crane, mechanical shovel or any other construction equipment does not have an unrestricted view during any maneuver, except a backup maneuver, one or more workers shall assist the operator:
(
a
)
by watching the movement of the equipment or of the load when it is out of the operator’s sight;
(
b
)
subject to section 3.24.2, by communicating with the operator by means of a code of hand signals, or by a telecommunications system when conditions so require or the operator judges it necessary.
(
3
)
When a worker is required to ensure safe maneuvering as prescribed in subsection 2, he must be placed in full view of the operator, with a full view of the intended path of travel of the vehicle and off the intended path of travel.
(
4
)
The operator must obey any stop signal.
(
5
)
When the operator can no longer see the worker, he must stop his vehicle or his maneuver.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.5
;
O.C. 1959-86, s. 21
;
O.C. 329-94, s. 51
;
O.C. 1078-2015, s. 4
.
3.10.6
.
Access to construction equipments:
(
1
)
No unauthorized persons shall be allowed to climb onto construction equipment.
(
2
)
The employer shall see that no worker remains in or on a vehicle if he might be endangered during the loading or unloading of the vehicle or while objects are being handled above the said vehicle.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.6
.
3.10.7
.
Lifting of workers:
(
1
)
A hoisting apparatus designed to lift persons shall be equipped with control levers of the deadman type, with an emergency stop button within reach of the workers being transported and a device that prevents the fall of the cabin in case of a defect in the electric or hydraulic supply.
(
2
)
The lifting of a worker with an apparatus designed exclusively for the lifting of materials is allowed provided that:
(
a
)
the apparatus is equipped with a platform;
(
b
)
there are not more than 5 workers on the platform;
(
c
)
every worker wears a safety harness secured by a fall arrest connecting device to an anchorage system, the whole in accordance with sections 2.10.12 and 2.10.15;
(
d
)
the total load does not exceed 70% of the rated load of the hoisting apparatus;
(
e
)
the operator of the hoisting apparatus uses the stabilizers when the apparatus is equipped with them;
(
f
)
the hoisting apparatus is not displaced when a worker is on the platform;
(
g
)
there is communication without intermediaries between a worker on the platform and the operator of the hoisting apparatus;
(
h
)
the employer submits the plans, the description of the hoisting apparatus and the utilization process to the Commission, except for a mobile crane or a lift truck; and
(
i
)
ladders, stepladders, scaffolds or other accessories are not used on the platform.
(
3
)
The platform required in subsection 2 shall:
(
a
)
have a non-skid floor;
(
b
)
be built in such a way as to allow a clearance of 2 m above any point of the floor;
(
c
)
be equipped with a metal guardrail on the 4 sides. The intermediate rail may be replaced by a wire mesh;
(
d
)
have a minimal width of 500 mm;
(
e
)
have a minimum safety factor of 4 for the structural elements;
(
f
)
comply with the plans required in paragraph
h
of subsection 2 of section 2.4.1;
(
g
)
if it has welded elements, be welded by a welder holding a Class “O” or “V” certificate of the Canadian Welding Bureau or a Class A or B qualification certificate in pressure vessel welding issued by the Minister of Employment and Social Solidarity; and
(
h
)
have a plate indicating the rated load of the platform, the total weight of the platform (including the rated load), the manufacturer’s name, the date of manufacture and a reference to the plans submitted. Identification of the welder shall be mentioned for any platform manufactured after 23 April 1980.
(
4
)
During the hoisting of a worker with a mobile crane:
(
a
)
the crane shall conform to CSA Standard Z150-1974 Safety Code for Mobile Cranes and its supplement No. 1-1977;
(
b
)
the platform shall be suspended or held in such a way that:
i
.
the slope of the floor does not exceed 1/5 in the worst loading conditions; and
ii
.
the flexible suspension members of the platform and the supporting hitch or pin have a minimum safety factor of 10;
(
c
)
an additional link shall tie the supporting hitch of the platform to a point located above the hook; and
(
d
)
the mobile crane shall be equipped with an upper limit switch for the hook or with a boom allowing the lifting of the platform at least to 3 m above the highest work level.
(
5
)
During the hoisting of a worker with a lift truck:
(
a
)
the lift truck shall conform to CSA Standard B335.1-1977 Low Lift and High Lift Trucks;
(
b
)
the platform shall encircle the forks and be secured to the apron of the lift truck;
(
c
)
the total load shall not exceed 50% of the rated load of the lift truck;
(
d
)
when the platform is equipped with a hoisting control, it shall be possible to stop the lift truck from this control and the latter shall have priority on any other control; and
(
e
)
when the platform is not equipped with a hoisting control, the operator of the lift truck shall remain at the controls during the work.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.7
;
O.C. 1959-86, s. 22
;
O.C. 329-94, s. 52
;
O.C. 35-2001, s. 18
;
O.C. 606-2014, s. 16
.
3.10.8
.
Vehicle-mounted aerial device:
(
1
)
A vehicle-mounted aerial device manufactured before 1 January 2000 shall meet one of the following requirements:
(
a
)
comply with CSA Standard C225-1976 Vehicle-Mounted Aerial Devices;
(
b
)
comply with ANSI Standard A92.2-1979 Vehicle-Mounted Elevating and Rotating Aerial Devices and be submitted to non-destructive testing of load bearing parts by a certified body before 1 January 2000; or
(
c
)
comply with ANSI/SIA Standard A92.2-1990 Vehicle-Mounted Elevating and Rotating Aerial Devices.
(
2
)
A vehicle-mounted aerial device manufactured on or after 1 January 2000 shall meet one of the following requirements:
(
a
)
comply with CAN/CSA Standard C225-M88 Vehicle-Mounted Aerial Devices; or
(
b
)
comply with ANSI/SIA Standard A-92.2-1990 Vehicle-Mounted Elevating and Rotating Aerial Devices and have been manufactured by an enterprise certified in compliance with ISO 9001.
(
3
)
A worker in an aerial device must wear a safety harness secured by a fall arrest connecting device to an anchorage system provided by the device’s manufacturer or, failing that, to an anchorage system complying with section 2.10.15. The harness and fall arrest connecting device must comply with section 2.10.12.
(
4
)
Mobile cranes are not governed by this section.
(
5
)
For the purposes of this section,
“
certified organization
” means an organization certified by the Canadian Welding Bureau to the requirements of CSA Standard W178.1-1996 Certification of Welding Inspection Organizations;
“
load bearing device
” means a device that carries or supports loads relative to the use of an aerial device;
“
non-destructive testing
” means testing, other than visual, carried out and interpreted by a Level II inspector certified by the Canadian General Standards Board in compliance with the certification standards for personnel assigned to non-destructive inspection of materials.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.8
;
O.C. 329-94, s. 53
;
O.C. 1413-98, s. 18
;
O.C. 35-2001, s. 19
;
O.C. 606-2014, s. 17
.
3.10.9
.
Material hoisting apparatus:
(
1
)
Any hoisting apparatus used to lift materials on construction site shall:
(
a
)
have solid moorings and fastening devices, designed, constructed and installed in such a way so as to support all loads and stresses which may be applied to them;
(
b
)
be constructed of adapted materials;
(
c
)
have an outrigger beam capable of supporting 4 times the maximum working load of the apparatus. This beam shall conform to section 3.9.15; and
(
d
)
be equipped with a brake or equivalent device capable of supporting the maximum working load of the apparatus and of automatically stopping it during an interruption of the hoisting movement.
(
2
)
The hoisting cable shall always be in good condition and never used as a sling.
(
3
)
In order to protect workers from falling when they work to pull loads onto a floor at platform level, one or several measures provided for in subparagraphs 1 to 4 of the second paragraph of section 2.9.1 must be taken.
(
4
)
The projection on the ground level of the space used for hoisting operations, the loading area and the hoisting mechanism area shall be encircled by a barrier and forbidden to any worker other than the one doing the loading.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.9
;
O.C. 329-94, s. 54
;
O.C. 35-2001, s. 20
.
3.10.9.1
.
A material hoist manufactured before 1987 shall comply with the Safety Code for Material Hoists CSA Z256-1972 (Rev. 1977).
A material hoist manufactured as of 1987 shall comply with the Safety Code for Material Hoists CAN/CSA Z256-M87.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.9.1
;
O.C. 329-94, s. 55
.
3.10.10
.
Cabin:
(
1
)
If the operator of motorized equipment runs the risks of being injured by flying objects, or by falling objects or material, a cabin or a protective structure shall be installed.
(
2
)
The cabins shall be:
(
a
)
located and equipped so as to provide the operator with the best possible view;
(
b
)
closed and provided with safety glass windows on all side if used outside; and
(
c
)
adequately heated during cold weather.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.10
.
3.10.11
.
Lighting:
When a self-propelled vehicle is in operation after nightfall or whenever circumstances so require, it shall be provided with:
(
a
)
headlights in front and at least one red light in the rear; and
(
b
)
sufficient lighting installed so as not to hamper the operator but allowing him to carry out his duties and to read easily the indicators on the dashboard.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.11
.
3.10.12
.
Warning devices:
(
1
)
Any self-propelled vehicle shall be equipped with a warning device that shall:
(
a
)
be installed within reach of the operator;
(
b
)
have a sound which is special to that type of equipment and different from any other signal on the site; and
(
c
)
be loud enough to override surrounding noises.
(
2
)
The following must be equipped with an automatic reset backup alarm for the reverse gear:
(
a
)
any self-propelled vehicle used mainly on a site where the operator’s view, through the rear window, is obstructed;
(
b
)
any earth-moving machinery as defined in ISO Standard 6165:2012, Earth-moving machinery — Basic types — Identification and terms and definitions;
(
c
)
any truck having a nominal capacity of 2,250 kg or more, as defined in subsection 5 of this section.
(
3
)
The automatic reset backup alarm device referred to in subsection 2 must have the following features:
(
a
)
have a distinct sound and a noise intensity that is superior to the surrounding noise and to the noise of the equipment on which it is installed;
(
b
)
be visible from the rear of the vehicle and face backward;
(
c
)
if the device is electric, it must comply with SAE Standard J994, Alarm - Backup - Electric Laboratory Performance Testing.
(
4
)
In addition to the requirements provided for in subsection 3, the backup alarm device installed on earth-moving machinery must comply with ISO Standard 9533:2010, Earth-moving machinery — Machine-mounted audible travel alarms and forward horns — Test methods and performance criteria.
(
5
)
For the purposes of this section, “nominal capacity” means the gross vehicle weight rating certified by a motor vehicle manufacturer less the net mass of the vehicle.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.12
;
O.C. 1078-2015, s. 5
.
3.10.13
.
Safety and protective devices:
(
1
)
Moving parts of machines shall be protected by safety devices. They shall be designed, constructed and used so as:
(
a
)
to ensure a positive protection and to prevent any access to the danger zone during their operation;
(
b
)
not to hamper the operator;
(
c
)
to operate automatically or with a minimum of effort;
(
d
)
to allow easy maintenance and repair of the machine;
(
e
)
not to have sharp edges, asperities or burrs and to constitute a source of hazards; and
(
f
)
to be solidly fixed.
(
2
)
If moving parts are not protected due to their location or by suitable guards, it shall be assured that:
(
a
)
the projecting extremities of transmission shafts are protected by sleeves or sockets;
(
b
)
the revolving collars are cylindrical and without projecting parts;
(
c
)
the jet screws, belts, keys, grease cups and other projections in revolving parts are flushed or covered to avoid any contact; and
(
d
)
unused keyways are filled up or enclosed in a guard.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.13
.
3.10.14
.
Abrasive wheels:
Any abrasive wheel:
(
a
)
50 mm or more in diameter, shall be equipped with a guard compatible with the work being performed and offering the most efficient protection against accident;
(
b
)
shall be tightened between 2 protective discs of a minimum diameter of at least 1/3 its diameter unless mounted on chucks cemented on back metallic plates or firmly fixed on back by any other mean;
(
c
)
shall have its tool holder or its work stand firmly fixed and never more than 3 mm from the abrasive wheel;
(
d
)
shall be inspected before being mounted in order to detect cracks, excessive looseness or other defects;
(
e
)
shall not operate at a speed higher than the maximum speed specified by the manufacturer; and
(
f
)
shall not be used if it is cracked, broken or unbalanced.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.14
.
3.10.15
.
Saws:
(
1
)
Bandwheels on bandsaws and the return portion of the blades shall be placed in guards, and the working side of the saw blade shall be protected between the rollers or guide blocks and the casing of the upper band wheel.
(
2
)
Any stationary circular saw shall be provided with a protective hood covering the exposed parts up to the base of the teeth.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.15
;
483-2021
O.C. 483-2021
,
s.
6
1
.
3.10.16
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.16
;
483-2021
O.C. 483-2021
,
s.
7
1
.
3.10.17
.
Internal combustion motor:
(
1
)
No internal combustion motor shall be used near sites where there are dusts or flammable or explosive vapours.
(
2
)
Air impurities produced inside any closed structure shall be removed at the emission point so that their concentration is reduced to a level below the limit values specified in Schedule I to the Regulation respecting occupational health and safety (
chapter S-2.1, r. 13
).
(
3
)
As soon as the ventilation system stops, any internal combustion motor shall be immediately stopped and re-started only when the ventilation system starts to operate again.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.17
;
O.C. 885-2001, s. 377
;
805-2020
O.C. 805-2020
,
s.
1
1
.
3.10.18
.
Repairs:
Before beginning repairs, all raised parts shall be well blocked.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.18
.
3.10.19
.
Long loads:
When a load extends more than 900 mm from the rear of a truck, the end of the load shall be indicated by:
(
a
)
a square red flag during the day, at least 300 mm along its sides; or
(
b
)
a flashing amber light at night.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.10.19
.
§
3.11
. —
Temporary heating
3.11.1
.
Any equipment providing a temporary heating supply system shall be safely installed and operated.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.1
.
3.11.2
.
It is prohibited to use a heating system which burns gasoline or naphtha.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.2
.
3.11.3
.
Any oil or fuel or gas heating system with the exception of those where the flame is in direct contact with the air, shall have a vent pipe.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.3
.
3.11.4
.
Any fuel-fired heating system shall be:
(
a
)
so located, protected and used that there is no risk of igniting:
i
.
tarpaulins or any other similar temporary shelter; or
ii
.
wood or any other combustible material adjacent thereto;
(
b
)
used in an enclosed area only if there is:
i
.
sufficient air supply for normal combustion; and
ii
.
sufficient ventilation;
(
c
)
protected from any damage or overturning;
(
d
)
located so as not to block the means of egress;
(
e
)
connected to a metal chimney, if used to burn a solid fuel, in order to discharge the products of combustion outside the building; and
(
f
)
connected to the liquid fuel tank by means of piping well protected against any damage.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.4
.
3.11.5
.
An electric air-heater must be certified in accordance with CAN/CSA Standard C22.2 No. 46, Electric Air-Heaters, applicable at the time of its manufacture.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.5
;
O.C. 393-2011, s. 14
.
3.11.6
.
Oil heating equipments shall be installed in accordance with CSA Standard B139 — 1971 Installation Code for Oil Burning Equipment, with the exception, however, of clause 12.3 of that Code.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.6
.
3.11.7
.
Any radiator, device or equipment operated with natural gas and used on a construction site shall:
(
a
)
comply with CAN/CSA Standard B.149.1-M91 Natural Gas Installation Code, if it is fired with natural gas, and with CAN/CSA Standard B.149.2-M91 Propane Installation Code, if it is fired with propane gas; and
(
b
)
not discharge gases into the work environment that could cause gas concentrations to exceed the standards prescribed in section 2.10.8.
Subparagraph
b
of the first paragraph also applies to oil radiators used on construction sites.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.7
;
O.C. 1413-98, s. 19
.
3.11.8
.
The installation of solid fuel heating equipment, including the mounting, clearances and air supply of such equipment, must comply with CAN/CSA Standard B365 Installation Code for Solid-Fuel-Burning Appliances and Equipment.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.8
;
O.C. 606-2014, s. 18
.
3.11.9
.
Hot air and air retake ducts shall be constructed with non-flammable material and be sufficiently supported.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.11.9
.
§
3.12
. —
Steam supply
3.12.1
.
Supplying of steam shall be done by means of equipments safely installed and put into operation.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.12.1
.
3.12.2
.
Steam supply lines shall be clearly identified.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.12.2
.
3.12.3
.
No one shall disconnect or repair a section of a steam line under pressure before ensuring that all precautions have been taken to prevent any hazard from occurring.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.12.3
.
3.12.4
.
Any steamhose of a pile driving engine shall be held back by a steel cable or chain to avoid any whiplash.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.12.4
.
3.12.5
.
Any steam supply system shall be insulated or protected so that no worker comes into contact with the piping.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.12.5
.
§
3.13
. —
Supply of gas under pressure
R.R.Q., 1981, c. S-2.1, r. 6, Sd. 3.13
;
805-2020
O.C. 805-2020
,
s.
2
1
.
3.13.1
.
The piping through which compressed air or gas circulates shall be protected against any shock or shall be clearly identified as to the nature of its content.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.13.1
;
O.C. 1413-98, s. 20
.
3.13.2
.
Before disconnecting or repairing a connection or a section of piping through which gas under pressure circulates, the piping supply shall be cut off and that piping shall be completely depressurized.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.13.2
;
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.3
.
Air piping:
Connections for flexible piping sections through which compressed air circulates shall be equipped with one of the following devices:
(
a
)
a chain or steel rope attached to each side of the connection;
(
b
)
a self-locking device; or
(
c
)
a locking device.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.13.3
;
O.C. 1959-86, s. 23
;
O.C. 1413-98, s. 20
.
3.13.4
.
It is prohibited to store oxygen cylinders less than 6 m from a flammable gas cylinder or a combustible such as oil or grease, unless the oxygen cylinder is separated from it by a wall made of non-combustible material, of a minimum height of 1.5 m and of a fire resistance of not less than 30 minutes.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.13.4
;
O.C. 1413-98, s. 20
.
3.13.5
.
Any gas under pressure cylinder shall:
(
a
)
comply with the Act respecting pressure vessels (
chapter A-20.01
) and its regulations;
(
b
)
be kept away from any heat source liable to increase the temperature of the contents above 55 ºC;
(
c
)
be used only for the purposes for which it is intended; and
(
d
)
be handled in such a way as not to damage it.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.13.5
;
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.6
.
A gas under pressure cylinder shall be used only under the following conditions:
(
a
)
it shall be placed upright so that the pressure limiting device is in constant and direct contact with the gaseous phase; and
(
b
)
it shall be fastened to a rigid structure or held on a cart designed for the transportation of such cylinder, or on the vehicle it supplies.
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.7
.
When a gas under pressure cylinder is not in use,
(
a
)
it shall be held in place upright, with the valves on top; and
(
b
)
the protective cap shall be in place.
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.8
.
Gas under pressure cylinders connected in series by a manifold shall be supported and maintained together, forming a unit, with the use of a rack or another installation designed for that purpose and the valves and safety devices shall be protected against shock.
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.9
.
It is prohibited to lift gas under pressure cylinders by the collar or the protective cap.
O.C. 1413-98, s. 20
;
805-2020
O.C. 805-2020
,
s.
3
1
.
3.13.10
.
Any propane gas cylinder that is not connected for use, shall be stored outside and protected from unauthorized handling:
(
a
)
in a place where no vehicles or mobile equipment are used or moved; or
(
b
)
in an area protected by a continuous barricade or trestles of a minimum height of 0.7 m.
O.C. 1413-98, s. 20
.
§
3.14
. —
Welding and cutting
3.14.1
.
Welding and cutting operations are prohibited close to combustible materials or in places containing flammable or explosive dusts, gases, or vapours, unless precautions are taken to prevent fire or explosions.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.14.1
.
3.14.2
.
Any electric or gas welding or cutting operation and the installation, handling and maintenance of the equipment used for such operations shall comply with CAN/CSA Standard W117.2-M87 Safety in Welding, Cutting, and Allied Processes, except section 7.8.2.2.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.14.2
;
O.C. 1413-98, s. 21
.
3.14.3
.
No cutting, welding or other work requiring an open flame shall be performed on a vessel, reservoir, pipe or other container where a flammable or explosive substance may be present, unless:
(
a
)
air samples have been taken to indicate that the work may be done without danger; or
(
b
)
procedures have been taken in accordance with subdivision 9.8 of CAN/CSA Standard W117.2-M87 Safety in Welding, Cutting, and Allied Processes.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.14.3
;
O.C. 1413-98, s. 22
.
3.14.4
.
Protective screens against radiation shall be installed where electric arc welding or cutting operations are liable to constitute a danger to the health, safety and physical well-being of persons other than the welder.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.14.4
;
O.C. 1413-98, s. 23
.
3.14.5
.
A welding torch using oxygen and a combustible gas shall be equipped with a gas-check valve and with a flame arrester at the combustible gas supply point and the oxygen supply point located in the torch handle.
O.C. 329-94, s. 61
;
O.C. 1413-98, s. 23
.
3.14.6
.
The chassis or hood of a welding machine supplied by a public power utility shall be grounded in accordance with CSA Standard C22.10-1992 Canadian Electrical Code, Part I (16th Edition) plus the Québec Amendments (O.C. 1674-91, 91-12-04), and any future provision amending it.
O.C. 1413-98, s. 23
.
3.14.7
.
A portable welding machine supplied by an internal combustion engine shall be grounded if it is provided with auxiliary outlets of 120 V or 240 V and if those outlets are used simultaneously with the welding process.
O.C. 1413-98, s. 23
.
3.14.8
.
It is prohibited to use electrical conductors or a pipeline containing flammable gases or liquids as a welding or cutting current neutral circuit.
O.C. 1413-98, s. 23
.
§
3.15
. —
Diggings, excavations and trenches
R.R.Q., 1981, c. S-2.1, r. 6, Sd. 3.15
;
O.C. 807-92, s. 8
.
3.15.1
.
Public services:
(
1
)
Before digging, the employer shall verify whether there is underground piping within the perimeter of the works to be carried out and, where applicable, situate its exact location on the ground.
(
2
)
The piping may be temporarily disconnected, relocated or left in place, on condition that:
(
a
)
the excavation procedure has been approved in advance by the road office or the utility company;
(
b
)
a work method is adopted which prevents damage to conduits; and
(
c
)
temporary supports are constructed.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.1
;
O.C. 807-92, s. 9
.
3.15.2
.
Adjoining structure:
Where there is any danger that the proposed digging might affect the stability of the adjoining structures and thus threaten the safety of workers, an adequate method of shoring or a sub-structure shall be provided, and a copy of the plans and specifications of such works shall be kept on the site.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.2
;
O.C. 807-92, s. 10
.
3.15.3
.
(
1
)
The employer shall ensure that the banks of an excavation or trench are shored solidly with quality materials in accordance with the plans and specifications of an engineer. Shoring is not required in the following cases:
(
1
)
where the trench or excavation is dug out of solid rock or where no workers are required to descend into it;
(
2
)
where there is no risk of the banks of the trench or excavation collapsing and where they slope less than 45º from a point less than 1.2 m from the bottom;
(
3
)
where there is no risk of the banks of the trench or excavation collapsing and where an engineer attests that it is not necessary to shore up the banks, given the slope, nature and stability of the ground. A copy of the engineer’s attestation shall be available on the construction site at all times.
Solid rock means rock that cannot be excavated otherwise than by blasting.
(
2
)
The shoring shall extend 300 mm above the excavation, except where the trench dug in on a public road and must be covered over to allow for the passage of traffic during periods when works are not in progress.
When the shoring consists of unjoined stays, the 300 mm extension above the excavation shall be fitted with a plinth 300 mm wide.
(
3
)
The banks shall be shored as the work progresses unless the shoring can be carried out before the digging.
(
4
)
During the work the employer shall ensure that the walls are inspected and maintained so as to remove:
(
a
)
rocks or materials liable to become detached therefrom;
(
b
)
overhanging matter.
Where the banks have been subject to environmental or climatic stress, inspections shall be more frequent.
(
5
)
It is prohibited:
(
a
)
to place materials less than 1.2 m from the rim of the banks;
(
b
)
to drive or park vehicles or machines less than 3 m from the rim of the banks, unless reinforced shoring has been used;
(
c
)
to let banks deteriorate.
(
6
)
Shoring shall be removed by an experienced person or under his supervision:
(
a
)
from the bottom upwards; and
(
b
)
only in places to which workers no longer have access.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.3
;
O.C. 807-92, s. 11
.
3.15.4
.
Means of access and supervision:
The employer shall ensure that ladders are placed in trenches at intervals of 15 linear metres or fractions thereof and in such manner as to follow the progress of the works.
Ladders shall rest on the bottom of the trench and extend at least 1 m above ground level.
When workers are in a trench, the employer shall post an experienced person at ground level so that he may detect faults, earth breaking away or any other source of danger.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.4
;
O.C. 807-92, s. 12
.
3.15.5
.
Barriers, barricades or warning line:
(
1
)
Continuous barriers or barricades of a minimum height of 0.7 m or a warning line as provided for in section 2.9.4.1, must be set up on the edge of any escarpment or digging:
(
a
)
whose depth is more than 3 m; or
(
b
)
which might constitute a hazard to workers or the public in general.
(
2
)
(Subsection revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.5
;
O.C. 995-91, s. 9
;
O.C. 606-2014, s. 19
.
3.15.6
.
Drainage:
Any excavation or trench shall be kept reasonably clear of water.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.6
.
3.15.7
.
Caissons:
(
1
)
No worker shall enter a caisson unless:
(
a
)
he is protected by a steel shoring:
i
.
that is sufficiently resistant;
ii
.
covering all the depth above the worker who is working therein; and
iii
.
extending at least 300 mm above ground level;
(
b
)
he uses a boatswain’s chair in accordance with section 3.9.17;
(
c
)
(paragraph revoked);
(
d
)
he is under the constant supervision of another worker for as long as he is in the trench;
(
e
)
he accompanies each load of materials excavated if he cannot take shelter outside the caisson;
(
f
)
any accumulation of water or mud inside the caisson is controlled;
(
g
)
the provisions of Subdivision 3.21 have been complied with.
(
2
)
No worker shall enter the belled area of a caisson unless such section is solidly shored or unless an engineer attests that such shoring is not necessary, given the nature and stability of the ground. A copy of that attestation shall be available on the construction site at all times.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.7
;
O.C. 807-92, s. 14
;
O.C. 329-94, s. 62
;
O.C. 35-2001, s. 21
.
3.15.8
.
Shafts:
(
1
)
The banks of shafts shall be shored in compliance with section 3.15.3.
(
2
)
During shaft-sinking works, workers shall not enter the shaft unless the provisions of Subdivision 3.21 have been complied with.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.8
;
O.C. 807-92, s. 15
.
3.15.9
.
Boring:
A drilling machine shall be equipped with:
(
a
)
pipes supplying water in holes during drilling; or
(
b
)
a mechanized exhaust system for removing the dust created by drilling machines.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.9
;
O.C. 807-92, s. 16
;
48-2022
O.C. 48-2022
,
s.
3
1
;
820-2023
O.C. 820-2023
,
s.
3
1
.
3.15.10
.
Minimum age:
No worker under 18 years of age is allowed to work in excavations or trenches.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.15.10
.
§
3.16
. —
Handling and storage of materials
3.16.1
.
Generalities:
(
1
)
All construction site materials shall be used, displaced or transported onto the site or unloaded from a vehicle or from a pile so as not to compromise the safety of workers and the public.
(
2
)
The load imposed by storing materials on a permanent or temporary structure shall not exceed the permissible load.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.1
.
3.16.2
.
Piling of materials:
(
1
)
Piling of materials shall be done so that piles do not disturb:
(
a
)
the spread of natural or artificial light;
(
b
)
the good operation of machines and other installations;
(
c
)
movement in passages, aisles, stairways, elevators, or near doors; and
(
d
)
the efficient operation of fire prevention equipment.
(
2
)
Materials shall not be piled against walls or partitions of buildings without ensuring that they can resist the lateral pressure.
(
3
)
Materials shall not be piled to a height which might jeopardize the stability of the pile.
(
4
)
The employer shall supply the necessary equipment to reach the height of piles to the person assigned to warehousing.
(
5
)
The distance between the side of an opening in an opening in a floor or roof and the bottom of a pile of materials shall be more than the height of the pile except if a device prevents the falling of materials.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.2
.
3.16.3
.
Building lumber:
Reserves of building lumber shall be neatly piled. These piles shall be:
(
a
)
supported at a certain height off the ground;
(
b
)
disposed in horizontal layers, criss-crossed and slightly inclined; and
(
c
)
stabilized by means of transversal supports or wedges, if the piles are more than 1.2 m high.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.6
;
O.C. 329-94, s. 66
.
3.16.4
.
Masonry materials:
Masonry units shall be stacked:
(
a
)
on planks, a platform or other level base;
(
b
)
in layers covering the entire area of the stacks;
(
c
)
in such a way that the height of the vertical face of the stacks does not exceed 1.8 m;
(
d
)
in tiers, when the height of the stockpiling exceeds 1.8 m;
(
e
)
with wooden transversal supports between the layers to prevent the pile from crumbling, if the height of the pile exceeds 1.8 mm;
(
f
)
bound together, if necessary, so as to ensure the stability thereof.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.7
;
O.C. 329-94, s. 66
.
3.16.5
.
Pipes:
Pipes shall be stacked:
(
a
)
on racks or solid shelves;
(
b
)
on wooden blocks provided with tappets at both ends; or
(
c
)
on metal bars of which both ends are bent upwards.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.8
;
O.C. 329-94, s. 66
.
3.16.6
.
Bagged materials:
Bagged materials shall:
(
a
)
be stacked by cross-piling the bags to form layers piled not higher than 10 bags unless:
i
.
the bags are stored in reservoirs or enclosures; and
ii
.
the sides of the piles are supported by the walls of the reservoirs or enclosures; and
(
b
)
be removed from the piles in such a way that the top of the pile remains horizontal.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.9
;
O.C. 329-94, s. 66
.
3.16.7
.
Bound objects:
(
1
)
When drums or barrels are stacked:
(
a
)
full, standing upright, the height of the piles shall be limited and 2 planks shall be laid side by side on each row before proceeding on to the next row;
(
b
)
empty, lying on their sides, the piles shall be symmetrical and stable, and all units in the bottom row shall be carefully wedged.
(
2
)
Subsection 1 also applies to large-diameter pipes, to rolls of paper or to any other object having a circular cross-section.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.10
;
O.C. 329-94, ss. 65 and 66
.
3.16.8
.
Hand lifting and carrying:
(
1
)
Mechanical apparatus shall be provided and used for carrying material, when the safety of the worker is jeopardized.
(
2
)
(Subsection revoked).
(
3
)
Workers assigned to the handling of material shall be instructed as to the manner of lifting and carrying loads.
(
4
)
Where an inclined plane is used for raising or lowering heavy objects, the following steps shall be followed:
(
a
)
avoid standing on the lower end of the plane; and
(
b
)
control the displacement of such object by means of cables, blocks, wedges or other devices.
(
5
)
Where rollers are utilized for moving objects, tools designed for this type of work shall be used instead of hands or feet to change the position of the moving rollers.
(
6
)
Suitable protective equipment in accordance with Subdivision 2.10 shall be used for the manual transportation of objects having sharp and dangerous edges, and for the handling of burning, caustic or corrosive substances.
(
7
)
The handling of heavy objects by a crew shall be done with signals that are well understood and designed to ensure uniform manoeuvering.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.3
;
O.C. 329-94, ss. 63 and 66
.
3.16.9
.
Conveyors:
(
1
)
The resistance of a structural element of a conveyor shall be calculated so that it supports the loads and overloads to which it is exposed.
(
2
)
A mobile element shall be protected in accordance with section 3.10.13 if it is located less than 2 m away from an accessible floor.
(
3
)
A conveyor installed above a walkway or a work area shall be equipped with a protector to prevent objects from falling.
(
4
)
An aerial conveyor in which workers are required to travel shall be equipped with a runway along its entire length and with an emergency stopping device installed at each work location.
(
5
)
It is forbidden for a worker to climb on a conveyor or to stand on the structure supporting it.
(
6
)
A vertical bucket conveyor shall be surrounded by a full protector:
(
a
)
covering the entire length; and
(
b
)
equipped with a door or with a detachable part for inspection, cleaning and repairs; the opening of this door or the removal of a detachable part shall produce automatic stopping of the conveyor.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.4
;
O.C. 329-94, ss. 64 and 66
;
O.C. 606-2014, s. 20
.
3.16.10
.
Handling, storage and use of hazardous products
(
1
)
The storage and handling of hazardous products within the meaning of the Hazardous Products Information Regulation (
chapter S-2.1, r. 8.1
) must be carried out in such a way as to prevent them from spilling or catching fire. The following measures must therefore be taken:
(
a
)
any hazardous products which, in mixing with other substances, may cause fires or explosions or may give off flammable or toxic gases must be stored separately;
(
b
)
receptacles, piping and apparatuses must be kept in good condition;
(
c
)
floors or shelves onto which a product has been spilled must be cleaned immediately.
(
2
)
Only the quantity of flammable liquid and combustibles contained in safety bottles and necessary for one work day may be stored in a building under construction, unless it can be stored in a ventilated room having a fire-resistance of at least 2 hours.
(
3
)
Where a hazardous product is transferred from one container to another, the receptacle used must be safe for use with the product transferred.
(
4
)
In addition to conforming to section 3.13.5, any cylinder of gas under pressure must not be
(
a
)
lifted with slings or magnets; or
(
b
)
exposed to shocks, in particular, shock caused by a fall.
(
5
)
Oxygen must not be used for the following purposes:
(
a
)
operating compressed-air tools;
(
b
)
ventilation;
(
c
)
obtaining pressure;
(
d
)
cleaning;
(
e
)
starting internal combustion engines.
(
6
)
Corrosive materials must be handled with care and must be stored:
(
a
)
away from areas in which the risk of fire is high;
(
b
)
away from combustive substances;
(
c
)
away from direct sunlight;
(
d
)
in cool and well ventilated areas;
(
e
)
in receptacles that are kept closed.
(
7
)
Toxic or dangerously reactive substances must be stored:
(
a
)
away from areas in which the risk of fire is high and away from heat sources;
(
b
)
away from combustive substances;
(
c
)
in cool and well ventilated areas.
For the purposes of this section,
“
corrosive materials
”
,
“
oxydizing material
”
,
“
toxic substances
”
and
“
dangerously reactive substances
”
mean a hazardous product that belongs to the corresponding hazard classes in the table provided for in section 70 of the Regulation respecting occupational health and safety (
chapter S-2.1, r. 13
).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.16.5
;
O.C. 995-91, s. 10
;
O.C. 329-94, s. 66
;
S.Q. 2015, c. 13, s. 15
;
805-2020
O.C. 805-2020
,
s.
4
1
1
.
§
3.17
. —
(Revoked)
R.R.Q., 1981, c. S-2.1, r. 6, div. 3.17
;
O.C. 425-2010, s. 5
.
3.17.1
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.1
;
O.C. 1959-86, s. 24
;
O.C. 425-2010, s. 5
.
3.17.2
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.2
;
O.C. 425-2010, s. 5
.
3.17.3
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.3
;
O.C. 425-2010, s. 5
.
3.17.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.4
;
O.C. 425-2010, s. 5
.
3.17.5
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.5
;
O.C. 425-2010, s. 5
.
3.17.6
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.6
;
O.C. 425-2010, s. 5
.
3.17.7
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.7
;
O.C. 425-2010, s. 5
.
3.17.8
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.8
;
O.C. 425-2010, s. 5
.
3.17.9
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.17.9
;
O.C. 425-2010, s. 5
.
§
3.18
. —
Demolition
3.18.1
.
Requirements prior to demolition:
(
1
)
The principal contractor must send to the Commission a demolition notice giving the method used, at least 7 days before the beginning of wrecking work on a building or structure. In emergency cases the notice must be sent as soon as possible before the beginning of wrecking work; such emergency must be proven by the principal contractor.
Wrecking of any prestressed or poststressed concrete slab or structure shall be made according to a method approved by an engineer qualified in the field.
(
2
)
Where mechanical wrecking is used, the notice must include the power of the machine, weight of the wrecking ball, space reserved for debris, successive wrecking steps, restrictions from and agreements with public utilities.
(
3
)
The consumer supply mains for water, gas and electricity and the other services shall be cut off at the place and in the way specified by the authorities involved. These service mains shall be relocated to avoid any damage and shall not constitute a hazard for workers and the public.
(
4
)
Any building or part of building in demolition shall be solidly braced or supported to avoid any collapse which could be dangerous for the workers.
(
5
)
Provision shall be made for the necessary supports with respect to adjoining properties in order to ensure their stability and to avoid any collapse.
(
6
)
Any glass shall be removed from outside openings prior to any demolition operations.
(
7
)
Any sidewalk or street running alongside a demolition site shall be isolated from the latter by a covered sidewalk closed on the demolition side as stipulated in section 2.7.2. However, this covered sidewalk may be replaced by a barrier if this sidewalk or street is located at a distance exceeding half the height of the building, but this building shall not measure more than 7.5 m in height.
(
8
)
(Subsection revoked).
(
9
)
The public shall be prevented from entering a building which is marked for demolition.
(
10
)
Construction signs shall be installed wherever the public may be exposed to any danger.
(
11
)
All demolition works shall be done under the continuous supervision of a competent foreman.
(
12
)
No employer shall employ for demolition work any worker younger than 18 years of age.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.1
;
O.C. 1959-86, s. 25
;
O.C. 995-91, s. 11
;
O.C. 329-94, s. 67
.
3.18.2
.
Requirements during demolition:
(
1
)
During demolition, the following precautions shall be taken:
(
a
)
dust shall be kept down;
(
b
)
debris shall not be burnt on the site without authorization;
(
c
)
floors shall not be overloaded beyond their capacity;
(
d
)
solid supports shall be provided in areas where there are gins, derricks and other similar hoisting apparatus;
(
e
)
any scaffolding or platform shall be erected in compliance with Subdivisions 3.7 and 3.9 of this Code;
(
f
)
materials with protruding nails shall be stacked or removed or nails shall be removed or hammered in;
(
g
)
entrances and exits which are protected against hazards shall be provided;
(
h
)
in buildings more than 7.5 m high, exterior openings shall be boarded up within 6 m of any shaft or chute for debris;
(
i
)
floor openings below the demolition level which are not being used for the removal of debris shall be boarded up;
(
j
)
stairways and ramps shall be kept as long as possible; and
(
k
)
Subdivision 3.1 applies even when demolition works are suspended.
(
2
)
Demolition works shall be done with the following provisions:
(
a
)
demolition work shall proceed systematically from the roof down to the ground, unless another demolition procedure has been approved by an engineer;
(
b
)
demolition and cleaning of a storey shall be finished before its supports give way or are removed;
(
c
)
the steel frame may be left in place during demolition of the masonry. However, any material shall be removed from the framework as the removal of the masonry progresses;
(
d
)
no beam, column or other structural part may be cut or separated from the others without having been previously separated from all supported loads;
(
e
)
solid shores for the remaining structure shall be provided during the removal of masonry or concrete floors. Plankings or walkways shall be provided for workers and the area below such work closed to workers;
(
f
)
masonry shall be demolished in reasonably level layers and not in large masses, so as to avoid affecting the solidity of the structure and its supports;
(
g
)
cornices and other projections shall be supported until removed;
(
h
)
no worker shall stand on any wall, pier or chimney unless scaffolding is provided on any side at a distance not exceeding 3 m below the level at which he is working;
(
i
)
it is forbidden to leave without protection any wall, chimney or other structural part which might collapse under the effect of wind or vibrations;
(
j
)
the demolition site shall be constantly inspected during the course of the works to prevent any eventual accident; and
(
k
)
sand layers shall be used to break the fall of materials that pose a danger to the health and safety of workers.
(
3
)
Removal, and transportation of debris shall be carried out in the manner described in section 3.2.2.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.2
;
O.C. 329-94, s. 68
.
3.18.3
.
Mechanical method of demolition:
Demolition by smashing walls or floors with a swinging weight, mechanical shovel, or other similar equipment shall be carried out according to the following provisions:
(
a
)
the section which is to be mechanically demolished shall not be higher than 25 m from the ground;
(
b
)
whenever the equipment is in operation, access to the section to be demolished is prohibited to all workers, except the operators of that equipment;
(
c
)
if the public has access to the part to be demolished, a protective wall shall be placed around the building at a distance at least equal to 1.5 times the height of the part to be demolished or, if the public does not have access thereto, a demolition zone shall be marked off around the building by hazard signs placed at a distance equivalent to that prescribed for the protective wall;
(
d
)
it shall be possible to manipulate the controls of the equipment used in such method of demolition at a safe distance from the points of impact; and
(
e
)
where a swinging weight is used, the supporting cables shall be of such a length that it is not possible for the weight to swing against any structure other than the structure being demolished.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.3
;
O.C. 1959-86, s. 26
;
O.C. 329-94, s. 69
;
O.C. 1413-98, s. 25
.
3.18.4
.
(Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.4
;
O.C. 1959-86, s. 27
;
O.C. 329-95, s. 70
.
3.18.5
.
Requirements following demolition:
The following measures shall be taken after demolition:
(
a
)
cellars and excavations shall be rendered inaccessible to the public by protective walls, unless they have been completely backfilled to grade;
(
b
)
streets, sidewalks or public roads shall be free from all temporary obstruction required by the work and shall be returned to their original state; and
(
c
)
the demolition site shall be left in such condition that no accident, fire or health hazard has been created.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.5
;
O.C. 1413-98, s. 26
.
3.18.6
.
Sections 3.18.1, 3.18.2 and 3.18.5 apply to all types of demolition.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.18.6
.
§
3.19
. —
Work on stilts
3.19.1
.
Work carried out on stilts or other similar apparatus is forbidden at all times.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.19.1
.
§
3.20
. —
Sandblasting
O.C. 1959-86, s. 28
.
3.20.1
.
The wearing of an air-supplied hood, gloves and clothing designed to ensure protection from dust and abrasive or metal projections is compulsory for any worker using an abrasive air blaster unless the worker is isolated from the process.
O.C. 1959-86, s. 28
;
O.C. 885-2001, s. 368
;
48-2022
O.C. 48-2022
,
s.
4
1
.
3.20.2
.
(Revoked).
O.C. 1959-86, s. 28
;
O.C. 885-2001, s. 369
;
48-2022
O.C. 48-2022
,
s.
5
1
.
3.20.3
.
Air flow:
The air flow supplying the hood must be sufficient to prevent the admission of dust and suspended particles in the air breathed by the workman and must not be less than 165 litres per minute or greater than 430 litres per minute.
O.C. 1959-86, s. 28
.
3.20.4
.
Maintenance of equipment:
The employer must maintain the equipment as recommended by the manufacturer and keep it clean.
O.C. 1959-86, s. 28
.
3.20.5
.
Ventilation:
Where work with sandblasting is performed indoors, the area must be isolated and ventilated by extraction.
O.C. 1959-86, s. 28
.
3.20.6
.
Abrasive blasting - Changing room and shower:
For abrasive blasting, the employer must provide workers with a changing room that complies with section 3.2.11 and a shower that complies with section 3.2.15.
O.C. 885-2001, s. 370
;
O.C. 393-2011, s. 15
.
§
3.21
. —
Work in confined space
O.C. 1959-86, s. 28
.
3.21.1
.
Before work begins in a confined space, the principal contractor, together with the employer, specifies in writing:
(
a
)
the tools required for the work;
(
b
)
the equipment installed or to be installed in the confined space and the measures to be taken for its installation, use, maintenance and protection or to move it;
(
c
)
the pipe and conduits entering the confined space;
(
d
)
the hazards, and corresponding safety measures to be taken according to the work;
(
e
)
contaminants which may be found in or around the confined space;
(
f
)
the life saving devices and equipment needed and the corresponding emergency measures.
That information must be available on the job-site.
O.C. 1959-86, s. 28
.
3.21.2
.
In confined spaces, the employer must take the contaminant concentration readings mentioned in subparagraph
e
of the first paragraph of section 3.21.1 and make sure that no worker, even when wearing a respirator, enters a confined space containing or which may contain:
(
a
)
oxygen in a proportion lower than 19.5% or higher than 23%;
(
b
)
flammable gas or vapour with a concentration higher than 25% of the lower explosion limit;
(
c
)
contaminants in the air with a concentration higher than the threshold limit values mentioned in Schedule I to the Regulation respecting occupational health and safety (
chapter S-2.1, r. 13
);
(
d
)
any other contaminant in a concentration which could be hazardous to a workman’s health.
O.C. 1959-86, s. 28
;
O.C. 885-2001, s. 377
;
48-2022
O.C. 48-2022
,
s.
6
1
.
3.21.3
.
Concentration readings:
The employer must ensure that the concentration readings prescribed in section 3.21.2 are:
(
a
)
taken every 2 hours in the most hazardous spots, by a person trained for such purpose;
(
b
)
taken so as to obtain a precision equal to that yielded by the methods described in section 44 of the Regulation respecting occupational health and safety (chapter S-2.1, r. 13);
(
c
)
entered in the record on the job site, except if the recordings are made with continuous recorders equipped with automatic alarms setting off when the quality of air does not meet the requirements of section 3.21.2.
O.C. 1959-86, s. 28
;
O.C. 885-2001, s. 371
.
3.21.4
.
The employer must install a ventilation system powerful enough to ensure compliance with the concentrations prescribed in paragraphs
a
,
b
,
c
, and
d
of section 3.21.2 in and around the confined space.
O.C. 1959-86, s. 28
;
O.C. 329-94, s. 71
.
3.21.5
.
The employer must ensure that measures are taken to prevent workmen who are not assigned to work in a confined space from entering that space.
O.C. 1959-86, s. 28
.
3.21.6
.
Emergency:
Where the environment is unhealthy and the situation endangers the life or safety of a person, the employer:
(
a
)
must ensure that the emergency measures prescribed in section 3.21.1 are taken; and
(
b
)
may, despite section 3.21.2, allow a workman to enter the confined space if such workman has had special training for such circumstances and if he is informed of the hazards he will be exposed to.
O.C. 1959-86, s. 28
.
§
3.22
. —
Work in isolated locations
O.C. 1959-86, s. 28
.
3.22.1
.
Where a workman works alone in an isolated location where it is impossible for him to call for help, the employer must provide an efficient intermittent or continuous watch.
O.C. 1959-86, s. 28
.
§
3.23
. —
Work liable to produce asbestos dust emissions
O.C. 54-90, s. 3
.
3.23.0.1
.
For the purposes of this subdivision, any material and product contains asbestos where the asbestos concentration is of at least 0.1%.
In that respect, the second paragraph of section 69.5 of the Regulation respecting occupational health and safety (chapter S-2.1, r. 13) applies.
O.C. 476-2013, s. 5
.
3.23.1
.
This subdivision applies to any construction site where work liable to produce asbestos dust emissions is carried out.
O.C. 54-90, s. 3
.
3.23.1.1
.
For the purposes of this subdivision,
“
protective clothing
”
means clothing that:
(
a
)
resists the penetration of asbestos fibres;
(
b
)
covers the worker’s body, excluding his face, hands and feet;
(
c
)
is closed at the neck, wrists and ankles;
“
wetting agent
”
means a surfactant or liquid detergent added to water according to the manufacturer’s instructions in order to increase its ability to penetrate materials containing asbestos;
“
work carried out outside
”
means work entirely carried out elsewhere than in a building used, having been used or intended to be used to shelter or receive persons, animals or things.
O.C. 459-99, s. 1
;
645-2022
O.C. 645-2022
,
s.
1
1
.
3.23.2
.
For the purposes of this subdivision, the following categories of sites are established:
(
1
)
sites where low-risk work is carried out:
(
a
)
the installation, handling or removal of manufactured goods containing asbestos, provided they are and remain in a non-friable condition, such as:
i
.
vinyl tiles;
ii
.
acoustic tiles;
iii
.
gaskets;
iv
.
seals;
v
.
asbestos cement products;
(
b
)
the sawing, cutting, shaping or drilling of a product mentioned in subparagraph
a
of this paragraph with a hand tool or a power tool fitted with a dust-collection device equipped with a high-efficiency filter that fully covers the work area;
(
c
)
(subparagraph revoked);
(
2
)
sites where moderate-risk work is carried out:
(
a
)
the total or partial removal of false ceilings for the purpose of gaining access to a work area where friable materials containing asbestos are found;
(
b
)
the enclosure of friable material containing asbestos, subject to subparagraph
c
of paragraph 3;
(
c
)
the removal of friable material containing asbestos where, in the removal process, the work area is sealed off from the worker’s breathing area;
(
d
)
any work that is liable to produce asbestos dust emissions and that is not classified as low or high-risk;
(
e
)
the handling or removal, otherwise than in the case referred to in subparagraph
f
, of small quantities of friable material containing asbestos having a volume of debris not exceeding 0.03 m
3
for each minor renovation or regular specific maintenance job;
(
f
)
the removal of drywall installed with asbestos joint-filling compounds;
(
3
)
sites where high-risk work is carried out:
(
a
)
subject to subparagraphs
c
and
e
of paragraph 2, the handling or the removal of friable material containing asbestos;
(
b
)
the cleaning or removal of a ventilation system, including rigid ducts, in buildings where the insulation contains asbestos applied by spraying;
(
c
)
the enclosure of friable material containing asbestos by the spray application of a sealant;
(
d
)
the repair, alteration or demolition of kilns, boilers or similar devices made entirely or partly of refractory materials containing asbestos;
(
e
)
the use of a power tool not fitted with a dust-collection device equipped with a high-efficiency filter that fully covers the work area to grind, cut, drill or abrade a product mentioned in subparagraph
a
of paragraph 1;
(
f
)
subject to subparagraph
e
of paragraph 2, the handling or removal of friable material containing crocidolite or amosite;
(
g
)
subject to subparagraph
e
of paragraph 2, the total or partial removal of false ceilings on which friable materials containing asbestos is found.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 2
;
645-2022
O.C. 645-2022
,
s.
2
1
1
.
3.23.3
.
The employer shall determine the types of asbestos present in the materials before undertaking work liable to generate asbestos dust.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 3
.
3.23.3.1
.
The use of crocidolite or amosite or of a product containing either of those materials is prohibited, except where their replacement is not reasonable or feasible in practice.
O.C. 459-99, s. 3
.
3.23.3.2
.
Before demolition work is undertaken, materials liable to generate asbestos dust shall be removed.
O.C. 459-99, s. 3
.
3.23.4
.
The spray application of a mixture of friable materials containing asbestos and the installation of friable insulating materials containing asbestos are prohibited.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 4
.
3.23.5
.
The use of compressed air is prohibited in a work area covered by this subdivision, except compressed air necessary to operate a respirator.
O.C. 54-90, s. 3
.
3.23.6
.
Smoking, eating, drinking or chewing any substance in a work area covered by this subdivision is prohibited.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 5
.
3.23.7
.
Before undertaking work liable to emit asbestos dust, the employer must train the worker and inform him of the risks, prevention methods and safe working methods. The training and information program must contain at least:
(
1
)
the employer’s general obligations;
(
2
)
the effects of asbestos on health;
(
3
)
the standards applicable and the sampling to be carried out;
(
4
)
the worker’s rights and obligations;
(
5
)
individual and common protective devices and equipment;
(
6
)
the tasks to be carried out and the equipment and tools to be used;
(
7
)
safe working methods and procedures;
(
8
)
prevention and verification methods.
The information and training provided for in the first paragraph must have previously been established in writing.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 6
.
3.23.8
.
Before undertaking in a building work covered by this subdivision:
(
1
)
all furniture shall be removed from the work area or protected by airtight film;
(
2
)
all friable materials that contain asbestos and that are spread in the work area shall be removed in accordance with either of the following methods:
(
a
)
after having wet those materials thoroughly using a wetting agent;
(
b
)
with a vacuum cleaner equipped with a high-efficiency filter.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 7
;
645-2022
O.C. 645-2022
,
s.
3
1
.
3.23.9
.
For the duration of work carried out inside a building, friable materials that contain asbestos and that are likely to be spread shall be kept thoroughly wetted using a wetting agent.
For the duration of work carried out outside, the employer shall prevent the dispersal of the dust of friable materials containing asbestos by spraying them. The employer shall ensure that those materials are kept wet or covered in order to prevent their dispersal.
Wetting is to be used, except where the procedure may create a danger to the health, safety and physical integrity of the worker and where the danger cannot be eliminated by another means.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 7
;
645-2022
O.C. 645-2022
,
s.
4
1
.
3.23.9.1
.
Before moving kilns, boilers or similar devices made entirely or partly of refractory materials containing asbestos, the employer shall cover them entirely with an airtight film.
O.C. 459-99, s. 7
.
3.23.10
.
During work inside a building, debris of materials containing asbestos shall be placed in airtight containers appropriate to the type of debris, regularly during the work shift and at the end of the work shift. Debris shall be removed by means of a vacuum cleaner equipped with a high-efficiency filter or by first wetting the debris using a wetting agent.
Where work is being carried out outside, the employer shall also prevent the dispersal of the debris of materials containing asbestos by using airtight film or any other equivalent means. The employer shall dispose of the debris using airtight containers, film, or any other means making it possible to ensure airtightness during transportation, depending on its intended use.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 7
;
645-2022
O.C. 645-2022
,
s.
5
1
1
.
3.23.11
.
Upon completion of work where airtight drop sheets were used to protect the work area, drop sheets intended for re-use must be cleaned with a vacuum cleaner equipped with a high-efficiency filter. Drop sheets intended for disposal must first be wetted, then folded so that they hold all the dust that they have collected and, finally, placed in an airtight container.
O.C. 54-90, s. 3
.
3.23.12
.
Upon completion of work covered by this subdivision, the work area and the area around it must be cleaned with a vacuum cleaner equipped with a high-efficiency filter or by damp wiping the surfaces and then cleaning them.
O.C. 54-90, s. 3
.
3.23.12.1
.
The outside of containers for the debris of materials containing asbestos, the tools and the equipment shall be cleaned by wetting or by means of a vacuum cleaner equipped with a high-efficiency filter immediately before they are removed from the work area.
645-2022
O.C. 645-2022
,
s.
6
1
.
3.23.13
.
A label must be affixed to any receptacle containing asbestos materials, whether new or used, unless the receptacle has already been labelled by a supplier in accordance with the Hazardous Products Regulations (SOR/2015-17).
The label must be permanently affixed and legible and must bear the following indications:
Material containing asbestos
Toxic by inhalation
Keep container tightly closed
Do not breathe the dust
O.C. 54-90, s. 3
;
O.C. 459-99, s. 8
;
S.Q. 2015, c. 13, s. 16
.
3.23.14
.
Any worker working in a work area covered by this subdivision must wear protective footwear that meets the requirements of section 2.10.6 and that is fitted with soles that do not slip on wet surfaces.
O.C. 54-90, s. 3
;
O.C. 459-99, s. 9
.
3.23.14.1
.
On a construction site where low-risk work is being carried out, except for the work referred to in subparagraph
a
of paragraph 1 of section 3.23.2, an employer shall ensure that any worker present in the work area wears a respirator.
O.C. 459-99, s. 10
;
O.C. 885-2001, s. 372
;
48-2022
O.C. 48-2022
,
s.
7
1
.
3.23.15
.
On a construction site where moderate-risk work is being carried out, an employer, in addition to the obligations provided for in sections 3.23.3 to 3.23.14, shall comply with the following:
(
1
)
the employer shall ensure that any worker present in the work area is wearing a reusable protective respiratory apparatus equipped with a 100 series or HEPA high efficiency filter certified by the NIOSH;
(
2
)
notwithstanding paragraph 1, a respirator that complies with the provisions of paragraph 1 or 2 of section 3.23.16 shall be worn in the following cases:
(
a
)
for the handling or removal of friable material containing crocidolite or amosite;
(
b
)
for any work covered by subparagraph
d
of paragraph 2 of section 3.23.2;
(
3
)
protective clothing shall be worn by any person present in the work area and the clothing worn shall be used exclusively for carrying out such work;
(
3.1
)
the employer must provide workers with a changing room that complies with section 3.2.11;
(
4
)