Q-2, r. 43 - Regulation respecting the charges payable for the disposal of residual materials

Full text
3. Every operator of a disposal site referred to in section 2 must, for each metric ton of residual materials received for disposal, pay disposal charges of $23.75.
No charge is payable for
(1)  incineration residue from an incineration facility referred to in section 2;
(2)  soils and other materials intended for covering the residual materials;
(3)  residual materials that are sorted and recovered on the premises to be reclaimed;
(4)  residual materials recovered, after incineration, to be reclaimed; and
(5)  mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1; 433-2020O.C. 433-2020, s. 3.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $12.72 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.79.
No charge is payable for
(1)  incineration residue from an incineration facility referred to in section 2;
(2)  soils and other materials intended for covering the residual materials;
(3)  residual materials that are sorted and recovered on the premises to be reclaimed;
(4)  residual materials recovered, after incineration, to be reclaimed; and
(5)  mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1; 433-2020O.C. 433-2020, s. 3.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $12.72 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.79.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $12.48 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.59.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $12.21 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.36.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $12.03 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.21.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.86 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $10.07.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.71 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.94.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.52 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.78.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.41 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.69.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.41 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 31 December 2023, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.50.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1; O.C. 547-2013, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.41 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 30 September 2015, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.50.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1.
3. Every operator of a disposal site referred to in section 2 must pay disposal charges of $11.19 for each metric ton of residual materials received for disposal.
In addition, for each metric ton of residual materials received for disposal from 1 October 2010 to 30 September 2015, an operator of a disposal site must pay, in addition to the charges prescribed in the first paragraph, additional charges of $9.50.
No charge is payable for incineration residue from an incinerator referred to in section 2 or for soils or other materials to be used to cover the residual materials. In addition, no charge is payable for residual materials that are sorted and recovered on the premises to be reclaimed, or for mine tailings or residue generated by a mine tailings reclamation process.
O.C. 340-2006, s. 3; O.C. 526-2010, s. 1.