10. On completion of the work authorized under section 5, the owner must inform the Minister of the completion of the work and forward to the Minister, not later than 90 days after so informing the Minister, a certificate of an engineer stating that the work has been carried out in conformity with the plans and specifications and, where applicable, with the conditions set out in the authorization and with the modifications approved under section 7. The certificate must also, where applicable, mention the other modifications made to the plans and specifications for which the Minister’s approval was not required in accordance with section 7.
2000, c. 9, s. 10; 2022, c. 8, s. 143.
10. Upon completion of the work authorized pursuant to section 5 and, where applicable, before the dam is put into operation, the owner must advise the Minister of the completion of the work and forward to the Minister a certificate of an engineer stating that the work has been carried out in conformity with the plans and specifications and any conditions of authorization.
Any modifications made to the plans and specifications during the carrying out of the work that were not required to be submitted to the Minister for approval under section 9 must also, within the same time limits, be forwarded to the Minister, together with a certificate of an engineer stating that the modifications are not likely to affect the safety of the works.
2000, c. 9, s. 10.