R-6.01 - Act respecting the Régie de l’énergie

Full text
85.20. An application for connection to the facilities of an accessible carrier or of the electric power carrier must be submitted to the electric power carrier in accordance with its rates and conditions for the transmission service.
2006, c. 46, s. 48.