73.1. The electric power carrier must submit the technical requirements for connection to its system to the Régie for approval. If the Régie deems it useful for the purposes of section 85.17, it may request that an owner or operator referred to in section 85.14 submit the technical requirements for connection to its system to the Régie for approval.
2000, c. 22, s. 25; 2006, c. 46, s. 42.
73.1. The electric power carrier shall establish operating standards and technical requirements, including standards of reliability for its electric power transmission system, and submit them to the Régie for approval. The Régie shall issue its decision within 120 days after receiving the standards.
2000, c. 22, s. 25.