H-4.2, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
279. The authorization holder must verify the position of the top of each of the cement plugs.
1251-2018O.C. 1251-2018, s. 279.
In force: 2018-09-20
279. The authorization holder must verify the position of the top of each of the cement plugs.
1251-2018O.C. 1251-2018, s. 279.