H-4.2, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water
Full text
148. The authorization holder who carries out a drill-stem test must ensure, in particular, that(1) the equipment used is designed to safely control the well pressure, properly characterize the geological formation and protect the environment;
(2) the rated pressure of the equipment upstream of and including the testing manifold exceeds the maximum anticipated shut-in pressure; and
(3) the equipment downstream of the testing manifold is sufficiently protected against overpressure.
1251-2018O.C. 1251-2018, s. 148.
In force: 2018-09-20
148. The authorization holder who carries out a drill-stem test must ensure, in particular, that(1) the equipment used is designed to safely control the well pressure, properly characterize the geological formation and protect the environment;
(2) the rated pressure of the equipment upstream of and including the testing manifold exceeds the maximum anticipated shut-in pressure; and
(3) the equipment downstream of the testing manifold is sufficiently protected against overpressure.
1251-2018O.C. 1251-2018, s. 148.